← Back
Miscellaneous two family
965 ST JOHNS PLACE
BROOKLYN · BIN 3032010
💬 Discuss this project
1910Year Built
2Stories
B9Building Class
R6Zoning
3,360 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Miscellaneous two family · Owner of record: YSR CAPITAL LLC · 2,000 sf lot · 1.68 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof3p · 1 filing · 10 docs
Floor 21p · 1 filing · 10 docs
Floor 1
Basement2p · 2 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WH CAPITAL2607/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/16/2022$1.3M—— → —$387/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J.K.DESIGN810/18/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STATE CONTRACTING INCGeneral Contractor407/08/2026
HORBRIDGE PLUMBING & HEATINGPlumbing407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781710/18/2023
Building Lifecycle
All (90)Filed (8)Permit Issued (6)Signed Off (4)Violation (1)Inspection (7)Objection (34)Special Inspection (30)
11/13/2023
Signed off — Alteration
PROPOSED KITCHEN RENOVATION, BATHROOM WORKS, MINOR PARTITION, INTERIOR FINISHED WORK AT BASEMENT ONLY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. PL WORK FILED SEPARATELY.
B00847906-I1
11/13/2023
Signed off — Alteration
Installation of new gas fired equipment and plumbing fixtures as per plans, files in conjunction with ALT II application B00847906-I1. No change in use occupancy or egress.
B00862080-I1
11/03/2023
Signed off — Alteration
Installation of new gas fired equipment and plumbing fixtures as per plans, files in conjunction with ALT II application B00860249-I1. No change in use occupancy or egress.
B00863089-I1
11/03/2023
Signed off — Alteration
Proposed renovation works for kitchen & bathrooms, minor partition, interior finished works, & new exterior stair for rear yard access as per plan. No change in use, egress & occupancy.
B00860249-I1
11/01/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/31/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/21/2023
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
10/21/2023
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
10/21/2023
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
10/21/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
10/21/2023
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
10/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
10/18/2023
Filed — Alteration
Installation of new gas fired equipment and plumbing fixtures as per plans, files in conjunction with ALT II application B00847906-I1. No change in use occupancy or egress.
B00862080-P1
10/17/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/17/2023
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
10/17/2023
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
10/17/2023
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
10/17/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
10/17/2023
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
10/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
10/11/2023
Permit issued — Plumbing
B00862080-I1-PL
10/11/2023
Permit issued — Plumbing
B00863089-I1-PL
10/04/2023
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
10/04/2023
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
10/04/2023
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
10/04/2023
Special inspection requirement — Final
CHRISTIAN LOZADA
10/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
10/03/2023
Objection resolved — Addressed
10/03/2023
Objection resolved — Addressed
10/03/2023
Objection resolved — Addressed
10/03/2023
Objection resolved — Addressed
09/28/2023
Objection raised — Other
09/28/2023
Objection raised — Fire_Protection
09/28/2023
Objection raised — Other
09/28/2023
Objection raised — Inspections
09/22/2023
Filed — Alteration
PROPOSED KITCHEN RENOVATION, BATHROOM WORKS, MINOR PARTITION, INTERIOR FINISHED WORK AT BASEMENT ONLY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. PL WORK FILED SEPARATELY.
B00847906-P1
09/22/2023
Filed — Alteration
Proposed renovation works for kitchen & bathrooms, minor partition, interior finished works, & new exterior stair for rear yard access as per plan. No change in use, egress & occupancy.
B00860249-P1
09/20/2023
Special inspection requirement — Insulation placement and R values
CHRISTIAN LOZADA
09/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
09/20/2023
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
09/20/2023
Special inspection requirement — Final
CHRISTIAN LOZADA
09/20/2023
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
09/20/2023
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
09/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
09/20/2023
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
09/20/2023
Special inspection requirement — Final
CHRISTIAN LOZADA
09/20/2023
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
09/20/2023
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
09/20/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
09/20/2023
Special inspection requirement — Air barrier - visual inspection
CHRISTIAN LOZADA
07/28/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/28/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/26/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/26/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/11/2023
Permit issued — Plumbing
B00863089-I1-PL
05/11/2023
Permit issued — Plumbing
B00862080-I1-PL
05/03/2023
Permit issued — General Construction
B00860249-I1-GC
04/27/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/20/2023
Filed — Alteration
Installation of new gas fired equipment and plumbing fixtures as per plans, files in conjunction with ALT II application B00847906-I1. No change in use occupancy or egress.
B00862080-I1
04/20/2023
Filed — Alteration
Installation of new gas fired equipment and plumbing fixtures as per plans, files in conjunction with ALT II application B00860249-I1. No change in use occupancy or egress.
B00863089-I1
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT10/11/2023
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT10/11/2023
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT05/11/2023
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT05/11/2023
DOB NOWGeneral ConstructionSigned-offSTATE CONTRACTING INC05/03/2023
DOB NOWGeneral ConstructionSigned-offSTATE CONTRACTING INC04/11/2023
1 project · most recent 12/18/2023
General Wiring
FiledStatusContractorScope
12/18/2023CompleteSELECT ELECTRICAL GROUP IGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
11/01/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/31/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/28/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/26/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/26/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
10/21/2023Permanent certificateCHRISTIAN LOZADAenergy_progress
10/21/2023HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
10/21/2023HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
10/21/2023HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
10/21/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
10/21/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
10/17/2023Permanent certificateCHRISTIAN LOZADAenergy_progress
10/17/2023HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
10/17/2023HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
10/17/2023HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
10/17/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
10/17/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
10/04/2023Interior lighting powerCHRISTIAN LOZADAenergy_progress
10/04/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
10/04/2023Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
10/04/2023FinalCHRISTIAN LOZADAprogress
10/04/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
09/20/2023Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
09/20/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
09/20/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
09/20/2023FinalCHRISTIAN LOZADAprogress
09/20/2023Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
09/20/2023Interior lighting powerCHRISTIAN LOZADAenergy_progress
09/20/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
09/20/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
Latest 25 of 51.
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/28/2026B08030477-I1Request digital key ↗
08/27/2026B00847906-P1Request digital key ↗
08/27/2026B00862080-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits6
▸DOB NOWLPC Approval/Permit6
08/13/2026B00862080-P1Open ↗
08/13/2026B00863089-I1Open ↗
08/13/2026B00847906-I1Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature16
09/02/2026B00863089-I1Open ↗
09/02/2026B00863089-I1Open ↗
08/31/2026B00847906-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/28/2026B08030477-I1Open ↗
08/27/2026B00847906-I1Open ↗
08/27/2026B00847906-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026B00863089-I1Open ↗
08/31/2026B00847906-P1Open ↗
08/29/2026B00862080-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/28/2026B08030477-I1Open ↗
08/27/2026B00847906-P1Open ↗
08/27/2026B00862080-I1Open ↗
Showing 3 of 7 on file for this type