Condo, residential tower (mixed-use, multi-family elevator) [derived]
966 1 AVENUE
MANHATTAN · BIN 1040162
💬 Discuss this project
1958Year Built
20Stories
RMBuilding Class
R10Zoning
212,621 sfGross Floor Area
191Units
LL97 CoveredRent Stabilized33 Open Violations 31 unresolved · 2 paperwork only ▸FISP: SAFEFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 411 EAST 53 STREET CONDO ASSOCIATION · 17,473 sf lot · 12.17 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 4 filings · 20 docs
PenthouseUnder Construction10p · 1 filing · 20 docs
Floor 15Under Construction25p · 1 filing · 11 docs
Floor 14
Floor 13
Floor 12
Floor 11Under Construction3p · 1 filing · 9 docs
Floor 10
Floor 9
Floor 87p · 1 filing · 9 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Cellar1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CENTURY MANAGEMENT3009/16/2026
411 EAST 53RD STREET CODOMINUM2203/22/2026
411 E 53RD ST CONDOMINIUM1003/22/2026
BILLY ENTERPRISES403/22/2026
53 ASSOCIATES CO203/22/2026
411 E 53 ST103/22/2026
CHARLES H GREENTHAL MANAGEMENT1703/22/2026
CHARLES H GREENTHAL403/22/2026
BLOCK 1289 ASSOCIATES103/22/2026
OWNER OF 401-411 E 53103/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design, LLC903/21/2026
AK CONSULTING SERVICES803/21/2026
GANCI LOGOZZO603/21/2026
BMB BUILDING CONSULTING603/21/2026
CH CORNERSTONE DESIGN303/21/2026
EAST COAST EXPEDITING203/21/2026
BANJI ARCHITECT PC203/21/2026
HLZAE103/21/2026
EXPEDITION NYC103/21/2026
JACK JAFFA & ASSOCIATES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMSTERDAM RESTORATION LLCGeneral Contractor1007/08/2026
NEW AMSTERDAM RESTORATIONGeneral Contractor909/16/2026
TOP NOTCH REMODELING CORPGeneral Contractor303/21/2026
MORELL BUILDERS INCGeneral Contractor303/21/2026
STUDIO NYANDAK CONSTRUCTIGeneral Contractor207/08/2026
FRED SMITH PLBG & HTG CO.Fire Protection207/08/2026
LAWRENCE EXTERIOR RESTORATIONGeneral Contractor203/21/2026
POST ROAD IRON WORKS, INCElectrical103/21/2026
RUBIN, MARTINElectrical103/21/2026
BEST ZRK SERVICES INCGeneral Contractor104/08/2026
EXCELLENT BUILDERS INCGeneral Contractor104/09/2026
KUCANA CONSTRUCTION LLCGeneral Contractor104/09/2026
PALCO MECHANICAL LLCGeneral Contractor104/08/2026
T&D UNITED CONSTR CO, INCGeneral Contractor104/09/2026
ALTAIR PLUMBING AND HEATPlumbing107/08/2026
APOLLO PLBG & HTG INCPlumbing107/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing106/28/2026
FRED SMITH P&H CO INCPlumbing107/08/2026
JOHN FITZGERALD PLBG &HTGPlumbing108/27/2026
MARATHON MECHANICAL LLCPlumbing107/08/2026
P.S.I. MECHANICALPlumbing107/08/2026
ALTEC E & M, INC. ELEC'LElectrical103/22/2026
R.J.C. MECHANICAL CORPPlumbing107/08/2026
CORCIONE, JONATHANElectrical103/21/2026
DUNRITE ELECTRICAL CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KWHC CONSULTING ENGINEER9586303/19/2026
ORSAR ENGINEERING PLLC8338203/13/2026
BEYOND ARCH LLC3600302/26/2026
METRIC CONSULTING AND INS1803201/22/2026
AMR ENGINEERING CONSULTAN7449112/14/2025
DEAN MENDEZ ARCHITECT, P.8621112/14/2025
URBAN INTEGRATIONS LLC7993212/03/2025
CTHREE ARCHITECTURE + DES1124105/19/2025
AG ENGINEERING PLLC8899104/29/2025
HOWARD L ZIMMERMAN ARCHIT1712102/28/2024
Building Lifecycle
All (239)Filed (32)Permit Issued (34)Signed Off (13)Facade (FISP) (11)Violation (60)Inspection (41)Objection (18)Special Inspection (30)
09/15/2026
Permit issued — Sidewalk Shed
M01289854-I1-SH
08/26/2026
Permit issued — Plumbing
M01297668-S1-PL
08/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/10/2026
Signed off — Alteration
PLUMBING WORK TO EXISTING UNIT 11K ON THE 11TH FLOOR, FOR REMOVAL,REPLACEMENT AND INSTALLATION OF FIXTURES.NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
M01224738-S1
08/10/2026
Signed off — Alteration
PLUMBING WORK TO EXISTING UNIT 11K ON THE 11TH FLOOR, FOR REMOVAL,REPLACEMENT AND INSTALLATION OF FIXTURES.NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
M01224738-I1
07/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/18/2026
Permit issued — Structural
M01297668-S3-ST
06/18/2026
Permit issued — General Construction
M01297668-I1-GC
06/15/2026
Permit issued — Sidewalk Shed
M01289854-I1-SH
06/01/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/28/2026
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01400246-I1
05/28/2026
Permit issued — Supported Scaffold
M01400246-I1-SF
05/21/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/15/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/08/2026
Signed off — Alteration
PLUMBING RENOVATION OF UNIT 15H ON 15TH FLOOR
M01219115-I1
05/08/2026
Signed off — Alteration
PLUMBING RENOVATION OF UNIT 15H ON 15TH FLOOR
M01219115-S1
05/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/07/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/07/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/25/2026
Permit issued — General Construction
M01295614-I1-GC
04/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/21/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/16/2026
Violation issued (HPD, open)
B
04/16/2026
Violation issued (HPD, open)
B
04/16/2026
Violation issued (HPD, closed)
C
04/16/2026
Violation issued (HPD, open)
B
04/02/2026
Permit issued — Plumbing
M01342112-S1-PL
03/30/2026
Objection resolved — Addressed
03/27/2026
Permit issued — General Construction
M01342112-I1-GC
03/27/2026
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
03/25/2026
Objection raised — Scope
03/19/2026
Filed — Alteration
THIS WORK INCLUDES MODIFICATIONS TO EXISTING WINDOW AND DOOR OPENINGS OF AN EXISTING RESIDENTIAL UNIT PHC ON THE PENTHOUSE LEVEL IN A MULTI-FAMILY STRUCTURE.
M01297668-S3
03/13/2026
Filed — Alteration
THIS WORK INCLUDES MODIFICATIONS TO EXISTING WINDOW AND DOOR OPENINGS OF AN EXISTING RESIDENTIAL UNIT PHC ON THE PENTHOUSE LEVEL IN A MULTI-FAMILY STRUCTURE.
M01297668-S2
03/13/2026
Permit issued — Sidewalk Shed
M01289854-I1-SH
03/12/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/12/2026
Special inspection requirement — Maintenance information
Liad Itzhaky
03/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Hackjong Choi
03/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hackjong Choi
03/10/2026
Special inspection requirement — Energy Code Compliance Inspections
Hackjong Choi
03/09/2026
Filed — Alteration
THIS WORK INCLUDES MODIFICATIONS TO EXISTING WINDOW AND DOOR OPENINGS OF AN EXISTING RESIDENTIAL UNIT PHC ON THE PENTHOUSE LEVEL IN A MULTI-FAMILY STRUCTURE.
M01297668-S1
03/09/2026
Filed — Alteration
THIS WORK INCLUDES MODIFICATIONS TO EXISTING WINDOW AND DOOR OPENINGS OF AN EXISTING RESIDENTIAL UNIT PHC ON THE PENTHOUSE LEVEL IN A MULTI-FAMILY STRUCTURE.
M01297668-I1
03/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Liad Itzhaky
03/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
Liad Itzhaky
03/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kevin Cheng
03/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Liad Itzhaky
03/06/2026
Special inspection requirement — Post-installed Anchors
Kevin Cheng
03/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
Liad Itzhaky
03/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Liad Itzhaky
03/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Liad Itzhaky
03/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kevin Cheng
03/05/2026
Filed — Alteration
PLUMBING WORK TO EXISTING UNIT 11K ON THE 11TH FLOOR, FOR REMOVAL,REPLACEMENT AND INSTALLATION OF FIXTURES.NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
M01224738-P1
03/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Liad Itzhaky
03/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Liad Itzhaky
03/04/2026
Special inspection requirement — Fenestration air leakage
Liad Itzhaky
03/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
Liad Itzhaky
03/04/2026
Special inspection requirement — Interior lighting power
Liad Itzhaky
03/04/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Liad Itzhaky
03/04/2026
Special inspection requirement — Fenestration areas
Liad Itzhaky
03/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Liad Itzhaky
Latest 60 of 239 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedNEW AMSTERDAM RESTORATION09/15/2026
DOB NOWPlumbingPermit IssuedJOHN FITZGERALD PLBG &HTG08/26/2026
DOB NOWStructuralPermit IssuedSTUDIO NYANDAK CONSTRUCTI06/18/2026
DOB NOWGeneral ConstructionPermit IssuedSTUDIO NYANDAK CONSTRUCTI06/18/2026
DOB NOWSidewalk ShedPermit IssuedNEW AMSTERDAM RESTORATION06/15/2026
DOB NOWSupported ScaffoldPermit IssuedNEW AMSTERDAM RESTORATION05/28/2026
DOB NOWGeneral ConstructionPermit IssuedNEW AMSTERDAM RESTORATION04/25/2026
DOB NOWPlumbingPermit IssuedFLOW-RIGHT PLBG & HTG COR04/02/2026
DOB NOWGeneral ConstructionPermit IssuedT&D UNITED CONSTR CO, INC03/27/2026
DOB NOWSidewalk ShedPermit IssuedNEW AMSTERDAM RESTORATION03/13/2026
DOB NOWGeneral ConstructionPermit IssuedNEW AMSTERDAM RESTORATION01/15/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedNEW AMSTERDAM RESTORATION11/07/2025
DOB NOWSuspended ScaffoldPermit IssuedNEW AMSTERDAM RESTORATION11/03/2025
DOB NOWSidewalk ShedPermit IssuedNEW AMSTERDAM RESTORATION10/10/2025
DOB NOWGeneral ConstructionSigned-offPALCO MECHANICAL LLC10/01/2025
DOB NOWPlumbingSigned-offR.J.C. MECHANICAL CORP08/19/2025
DOB NOWGeneral ConstructionPermit IssuedEXCELLENT BUILDERS INC08/14/2025
DOB NOWPlumbingSigned-offAPOLLO PLBG & HTG INC06/11/2025
DOB NOWMechanical SystemsSigned-offLAWRENCE EXTERIOR RESTORA06/10/2025
DOB NOWGeneral ConstructionSigned-offBEST ZRK SERVICES INC05/29/2025
DOB NOWGeneral ConstructionSigned-offKUCANA CONSTRUCTION LLC05/22/2025
DOB NOWPlumbingSigned-offALTAIR PLUMBING AND HEAT05/20/2025
DOB NOWGeneral ConstructionSigned-offMORELL BUILDERS INC10/12/2023
DOB NOWStandpipeSigned-offFRED SMITH PLBG & HTG CO.10/05/2023
DOB NOWSidewalk ShedSigned-offNEW AMSTERDAM RESTORATION09/15/2023
DOB NOWStandpipeSigned-offFRED SMITH P&H CO INC11/29/2022
DOB NOWSprinklersSigned-offFRED SMITH PLBG & HTG CO.11/29/2022
DOB NOWGeneral ConstructionSigned-offTOP NOTCH REMODELING CORP12/09/2021
DOB NOWSupported ScaffoldPermit IssuedAMSTERDAM RESTORATION LLC06/11/2021
DOB NOWSidewalk ShedPermit IssuedAMSTERDAM RESTORATION LLC06/11/2021
DOB NOWPlumbingSigned-offMARATHON MECHANICAL LLC10/16/2020
DOB NOWSupported ScaffoldPermit IssuedAMSTERDAM RESTORATION LLC08/21/2020
DOB NOWSidewalk ShedPermit IssuedAMSTERDAM RESTORATION LLC08/14/2020
DOB NOWPlumbingSigned-offP.S.I. MECHANICAL11/04/2019
BISPLISSUEDAQUA BLUE PLBG SVCES CORP03/01/2023
BISOTISSUED400 CONCRETE CORP02/16/2023
BISOTISSUED400 CONCRETE CORP08/23/2022
BISPLISSUEDAQUA BLUE PLBG SVCES CORP09/28/2021
BISOTISSUED400 CONCRETE CORP09/28/2021
BISOTISSUEDSRT CONSTRUCTION INC09/24/2020
+ 44 more permits on file
1 project · most recent 03/19/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/19/2026Permit IssuedSTUDIO NYANDAK CONSTRUCTIHeating and Air Conditioning Systems
Heat / Cool
Cooper & Hunter CH-R36MES-230VO 37,000 BTU · Condensing Unit ×1
4 projects · most recent 03/19/2026
Water/Sanitary Gas
FiledStatusContractorScope
03/19/2026Permit IssuedJOHN FITZGERALD PLBG &HTGGas, Water/Sanitary
03/05/2026Signed-offR.J.C. MECHANICAL CORPGas, Water/Sanitary
01/22/2026Permit IssuedFLOW-RIGHT PLBG & HTG CORGas, Water/Sanitary
08/29/2023——Water/Sanitary
12 projects · most recent 05/15/2026
General Wiring
FiledStatusContractorScope
05/15/2026Permit IssuedICON ELECTRIC INCGeneral Wiring
10/13/2025Permit IssuedGLENDALE ELECTL CONTNG IN—
06/03/2025CompleteKINGS ELECTRIC CO., INC.—
03/09/2025CompleteACCURATE ELEC'L CORP.General Wiring
01/02/2024Permit IssuedALTEC E & M, INC. ELEC'LGeneral Wiring
07/19/2023Permit IssuedOMD ELECTRICAL CORP1 meters, 1 new_meters
08/07/2020Permit IssuedGREEN POWER ELECTRIC CORP—
07/31/2020CompleteLIPPOLIS ELECTRIC, INC.General Wiring
01/22/2020CompleteFSM ELECTRICAL CORPORATIOGeneral Wiring
08/08/2019CompleteLENS ELECTRIC, INC—
02/27/2019CompleteDUNRITE ELECTRICAL CORP—
01/21/2019CompleteS.A.L. ELECTRIC CO INC.—
1 project · most recent 03/19/2026
FiledStatusContractorScope
03/19/2026Permit IssuedJOHN FITZGERALD PLBG &HTG1 scope_items
4 projects · most recent 05/28/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
05/28/2026Permit IssuedNEW AMSTERDAM RESTORATIONScaffold
10/10/2025Permit IssuedNEW AMSTERDAM RESTORATIONSidewalk Shed
07/29/2021Permit IssuedAMSTERDAM RESTORATION LLCScaffold
08/19/2020Permit IssuedAMSTERDAM RESTORATION LLCSidewalk Shed
1 project · most recent 12/03/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
12/03/2025Permit IssuedNEW AMSTERDAM RESTORATIONSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 41
DateTypeResultReport
08/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/22/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/01/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/21/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/15/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/08/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/07/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/07/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/21/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/27/2026Pass-Final PL - More than 10 Requested FloorsPassView ↗
03/12/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/18/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/29/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/23/2026Pass-Final General Construction Non-Directive 14PassView ↗
01/16/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/16/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/09/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/09/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/31/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/22/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
12/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/08/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
Latest 25 of 41.
▾Special Inspection Requirements (DOB NOW) — 64
DateRequirementInspectorRole
03/12/2026Maintenance informationLiad Itzhakyenergy_progress
03/10/2026Fire-Resistant Penetrations and JointsHackjong Choispecial
03/10/2026Energy Code Compliance InspectionsHackjong Choiprogress
03/10/2026HVAC-R and service water piping design and insulationHackjong Choienergy_progress
03/09/2026Fire-Resistant Penetrations and JointsLiad Itzhakyspecial
03/06/2026HVAC-R and service water piping design and insulationLiad Itzhakyenergy_progress
03/06/2026Structural Stability – Alterations of existing buildingsKevin Chengspecial
03/06/2026Energy Code Compliance InspectionsLiad Itzhakyprogress
03/06/2026Post-installed AnchorsKevin Chengspecial
03/06/2026Fire-Resistant Penetrations and JointsLiad Itzhakyspecial
03/06/2026Structural Stability – Alterations of existing buildingsKevin Chengspecial
03/06/2026HVAC-R and service water heating system controlsLiad Itzhakyenergy_progress
03/06/2026HVAC-R and service water heating equipmentLiad Itzhakyenergy_progress
03/04/2026Fenestration and door U-factor and product ratingsLiad Itzhakyenergy_progress
03/04/2026Energy Code Compliance InspectionsLiad Itzhakyprogress
03/04/2026Fire-Resistance Rated ConstructionLiad Itzhakyprogress
03/04/2026Fenestration areasLiad Itzhakyenergy_progress
03/04/2026Interior lighting powerLiad Itzhakyenergy_progress
03/04/2026Fenestration air leakageLiad Itzhakyenergy_progress
03/04/2026Energy Code Compliance InspectionsLiad Itzhakyprogress
03/04/2026HVAC-R and service water piping design and insulationLiad Itzhakyenergy_progress
01/16/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
01/14/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
01/14/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
01/12/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
Latest 25 of 64.
▾Documents — 639 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch27
09/03/2026M00619724-I1Request digital key ↗
09/01/2026M08007590-I1Request digital key ↗
09/01/2026M08007590-P1Request digital key ↗
Showing 3 of 27 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00214103-I1Request digital key ↗
08/15/2026M00349258-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/04/2026M00374079-I1Request digital key ↗
08/15/2026M00374079-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/03/2026M00387711-I1Request digital key ↗
08/15/2026M00387711-P1Request digital key ↗
▸Applications & Permits105
▸BISWORK PERMIT APPLICATION54
09/28/2021123731676Open ↗
09/28/2021123731676Open ↗
09/24/2020140919059Open ↗
Showing 3 of 54 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION49
03/30/2023123731676Open ↗
03/03/2023123731676Open ↗
12/20/2021104067625Open ↗
Showing 3 of 49 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
03/30/2023123731676Open ↗
▸Seals & Professional Certifications171
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION47
02/07/2020123770561Open ↗
02/07/2020123770561Open ↗
01/29/2020123770561Open ↗
Showing 3 of 47 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature35
09/04/2026M00374079-P1Open ↗
09/04/2026M00374079-I1Open ↗
09/03/2026M00387711-I1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWProgress Inspector Seal & Signature31
09/25/2026M01000924-I1Open ↗
09/25/2026M01000924-I1Open ↗
09/19/2026M01219115-P1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature27
09/25/2026M01000924-I1Open ↗
09/25/2026M01000924-I1Open ↗
09/23/2026M08007590-I1Open ↗
Showing 3 of 27 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
08/12/2020140938476Open ↗
06/28/2019140857589Open ↗
01/30/2019140829904Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
08/12/2020140938476Open ↗
06/28/2019140857589Open ↗
01/30/2019140829904Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
08/12/2020140938476Open ↗
06/28/2019140857589Open ↗
01/30/2019140829904Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
08/03/2020140932230Open ↗
Showing 1 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment40
▸BISSELF-CERT PLUMBING NOTICE12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING9
03/30/2023123731676Open ↗
06/28/2019140857589Open ↗
01/30/2019140829904Open ↗
Showing 3 of 9 on file for this type
▸BISEQUIPMENT USE PERMITS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
05/09/2019123731676Open ↗
03/25/2019123731676Open ↗
Showing 2 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection21
▸BISTenant Protection Plan and Notes14
02/07/2020123847560Open ↗
12/10/2019123847560Open ↗
09/04/2019123770561Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWTenant Protection Plan6
08/13/2026M00374079-P1Open ↗
08/13/2026M00214103-I1Open ↗
08/13/2026M00387711-I1Open ↗
Showing 3 of 6 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos44
▸DOB NOWDEP ACP-5: Asbestos Assessment Report24
09/03/2026M00619724-I1Open ↗
09/01/2026M08007590-P1Open ↗
09/01/2026M08007590-I1Open ↗
Showing 3 of 24 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)15
08/03/2020140932230Open ↗
07/08/2020140919059Open ↗
12/10/2019123847560Open ↗
Showing 3 of 15 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance44
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS19
02/07/2020123770561Open ↗
02/07/2020123770561Open ↗
01/29/2020123770561Open ↗
Showing 3 of 19 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS11
04/19/2023123731676Open ↗
11/23/2021140932230Open ↗
08/26/2020123847560Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
04/19/2023123731676Open ↗
11/23/2021140932230Open ↗
08/26/2020123847560Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
06/28/2019140857589Open ↗
01/30/2019140829904Open ↗
▸BISNYCECC ANALYSIS1
06/28/2019140857589Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/01/2022140919059Open ↗
▸BISLIGHTING IN DWELLING UNITS1
09/01/2022140919059Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/01/2022140919059Open ↗
▸BISLIGHTING CONTROLS1
09/01/2022140919059Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: RESPONSIBILITY15
04/19/2023123731676Open ↗
03/02/2023123731676Open ↗
01/06/2022104067625Open ↗
Showing 3 of 15 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
12/15/2021104067625Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
09/01/2022140919059Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
09/01/2022140919059Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
05/24/2018122548074Open ↗
▸Approvals, Objections & Sign-offs42
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST22
04/24/2023123731676Open ↗
09/02/2022140919059Open ↗
01/06/2022104067625Open ↗
Showing 3 of 22 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
09/06/2020140932230Open ↗
08/26/2020123847560Open ↗
09/23/2019140829904Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER4
07/23/2019123731676Open ↗
03/22/2019123731676Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/17/2026M01400246-I1Open ↗
08/13/2026M01313720-I1Open ↗
08/13/2026M01289854-I1Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL1
09/01/2022140919059Open ↗
▸Cost, Insurance & Ownership55
▸BISCOST AFFIDAVIT44
01/06/2022104067625Open ↗
11/23/2021140932230Open ↗
08/26/2020123847560Open ↗
Showing 3 of 44 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST5
07/19/2019140857589Open ↗
07/16/2019140857589Open ↗
07/12/2019140857589Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
04/19/2023123731676Open ↗
09/01/2022140919059Open ↗
01/05/2022104067625Open ↗
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLL58-88 CIVIL PENALTY AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms53
▸BISEFILING COVER SHEET21
12/10/2019123847560Open ↗
09/04/2019123770561Open ↗
03/25/2019123731676Open ↗
Showing 3 of 21 on file for this type
▸BISADDITIONAL INFORMATION16
03/30/2023123731676Open ↗
12/20/2021104067625Open ↗
08/12/2021140938476Open ↗
Showing 3 of 16 on file for this type
▸BISBOROUGH INTAKE FORM8
09/28/2021123731676Open ↗
02/07/2020123770561Open ↗
01/29/2020123770561Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
08/12/2020140938476Open ↗
08/03/2020140932230Open ↗
07/08/2020140919059Open ↗
Showing 3 of 8 on file for this type
▸Other Documents11
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
08/01/2017123348181Open ↗
Showing 1 of 4 on file for this type
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWManufacturer's Specifications2
08/13/2026M01291389-I1Open ↗
08/13/2026M01291389-P1Open ↗
▸DOB NOWCalculations2
08/13/2026M01291389-P1Open ↗
08/13/2026M01291389-I1Open ↗
▸BISSupporting Document: Fee Deferment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type