2023Year Built
2Stories
B2Building Class
R4-1Zoning
2,094 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 2,850 sf lot · 0.73 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionCivilOther
Roof3p · 3 filings · 20 docs
Floor 234p · 1 filing · 20 docs
Floor 135p · 2 filings · 20 docs
Cellar33p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
URENA CONSTRUCTION & DESIGN607/08/2026
JRY CONSTRUCTION INC GC 6103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FANG ARCHITECT305/20/2025
YOU GAO204/04/2025
ALPHA HOME DESIGN LLC311/06/2024
ANTHONY CUCICH ARCHITECT507/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INDESIGN STUDIO1203/21/2026
ANTHONY CUCICH ARCHITECT503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JRY CONSTRUCTION INCGeneral Contractor807/08/2026
FIRST WORLD DEVELOPMENTGeneral Contractor303/21/2026
URENA CONST & DESIGN INCGeneral Contractor207/08/2026
WASOFF PLBG & UTILITY COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FANG ARCHITECT5513205/20/2025
YAN GAO6619311/06/2024
ANTHONY CUCICH ARCHITECT6081307/24/2023
Building Lifecycle
All (99)Filed (13)Permit Issued (8)Signed Off (4)Violation (1)Inspection (12)Objection (31)Special Inspection (30)
07/28/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/19/2025
Signed off — New Building
NEW 2 STORY WITH CELLAR RESIDENTIAL BUILDING - 2 FAMILY
Q00832969-I1
06/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/11/2025
Special inspection requirement — Subgrade Inspections
DEZHANG FANG
06/11/2025
Special inspection requirement — Concrete - Cast-In-Place
DEZHANG FANG
06/11/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
DEZHANG FANG
06/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
06/11/2025
Special inspection requirement — Structural Cold-Formed Steel
DEZHANG FANG
06/11/2025
Special inspection requirement — Air barrier — testing
DEZHANG FANG
06/11/2025
Special inspection requirement — Insulation placement and R values
DEZHANG FANG
06/11/2025
Special inspection requirement — Fenestration areas
DEZHANG FANG
06/11/2025
Special inspection requirement — Air barrier - visual inspection
DEZHANG FANG
06/11/2025
Special inspection requirement — Fenestration air leakage
DEZHANG FANG
06/11/2025
Special inspection requirement — Masonry
DEZHANG FANG
06/11/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
DEZHANG FANG
06/11/2025
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
06/11/2025
Special inspection requirement — Final
DEZHANG FANG
06/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
06/11/2025
Special inspection requirement — Footing and Foundation
DEZHANG FANG
06/11/2025
Special inspection requirement — Permanent certificate
DEZHANG FANG
06/11/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
DEZHANG FANG
05/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/22/2025
Objection resolved — Addressed
05/22/2025
Objection resolved — Addressed
05/21/2025
Objection raised — Admin
05/21/2025
Objection raised — Admin
05/20/2025
Filed — New Building
NEW 2 STORY WITH CELLAR RESIDENTIAL BUILDING - 2 FAMILY
Q00832969-P2
05/20/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/05/2025
Signed off — Alteration
INSTALLATION OF (1) 18' SHARED CURB CUT.
Q01199950-I1
05/02/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/17/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
04/11/2025
Signed off — Alteration
TO FILE EXTERIOR PLUMBING WORK IN CONJUNCTION WITH HCQ-1300/24-1.
Q01046327-I1
04/07/2025
Permit issued — Curb Cut
Q01199950-I1-CC
04/04/2025
Filed — Alteration
INSTALLATION OF (1) 18' SHARED CURB CUT.
Q01199950-I1
03/26/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
03/26/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/24/2025
Signed off — Alteration
8'-0" HIGH WOOD FENCE.
Q00288521-I1
03/19/2025
Objection raised — Scope
03/14/2025
Filed — Alteration
INSTALLATION OF (1) 18' SHARED CURB CUT.
Q01193928-I1
01/30/2025
Filed — Alteration
TO FILE EXTERIOR PLUMBING WORK IN CONJUNCTION WITH HCQ-1300/24-1.
Q01046327-S1
12/10/2024
Permit issued — Earth Work
Q00832969-I1-GC-CX
12/09/2024
Permit issued — Construction Fence
Q00288521-I1-FN
11/06/2024
Filed — Alteration
TO FILE EXTERIOR PLUMBING WORK IN CONJUNCTION WITH HCQ-1300/24-1.
Q01046327-P2
11/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
YAN GAO
11/06/2024
Special inspection requirement — Energy Code Compliance Inspections
YAN GAO
11/06/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
YAN GAO
11/06/2024
Special inspection requirement — HVAC-R and service water heating system controls
YAN GAO
11/06/2024
Special inspection requirement — HVAC-R and service water heating equipment
YAN GAO
11/06/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
YAN GAO
11/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
YAN GAO
11/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
YAN GAO
11/05/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
YAN GAO
11/05/2024
Special inspection requirement — Energy Code Compliance Inspections
YAN GAO
11/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
YAN GAO
11/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
YAN GAO
06/14/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/14/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/14/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/10/2024
Filed — Alteration
TO FILE EXTERIOR PLUMBING WORK IN CONJUNCTION WITH HCQ-1300/24-1.
Q01046327-P1
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offJRY CONSTRUCTION INC04/07/2025
DOB NOWEarth WorkPermit IssuedJRY CONSTRUCTION INC12/10/2024
DOB NOWConstruction FenceSigned-offJRY CONSTRUCTION INC12/09/2024
DOB NOWPlumbingSigned-offWASOFF PLBG & UTILITY CO06/06/2024
DOB NOWEarth WorkPermit IssuedJRY CONSTRUCTION INC02/21/2024
DOB NOWConstruction FenceSigned-offURENA CONST & DESIGN INC09/13/2023
DOB NOWGeneral ConstructionPermit IssuedFIRST WORLD DEVELOPMENT08/30/2023
DOB NOWConstruction FenceSigned-offURENA CONST & DESIGN INC05/12/2021
BIS—ISSUEDFIRST WORLD DEVELOPMENT10/04/2021
1 project · most recent 05/27/2022
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/27/2022——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Fujitsu ASU9RLF 12,000 BTU · Split System ×7
AOU36RLXFZ 36,000 BTU · Condensing Unit ×2
ASU12RLF 12,000 BTU · Split System ×1
Heating
A.O. Smith GCV-50 20,460 BTU · Water Heater ×2
Navien NPE-180 150,000 BTU · Boiler ×2
Ventilation
Panasonic FV-05VQ5 150 CFM · Exhaust Fan ×5
FV-15VQ5 150 BTU · Kitchen Exhaust ×2
1 project · most recent 01/30/2025
FiledStatusContractorScope
01/30/2025——23 heads
2 projects · most recent 01/30/2025
Water/Sanitary Plumbing-Sprinkler Storm Gas
FiledStatusContractorScope
01/30/2025Signed-offWASOFF PLBG & UTILITY COPlumbing-Sprinkler, Storm, Water/Sanitary
06/24/2022——Gas, Water/Sanitary
1 project · most recent 03/21/2024
General Wiring
FiledStatusContractorScope
03/21/2024CompleteKJK ELECTRIC INCGeneral Wiring
1 project · most recent 05/20/2025
FiledStatusContractorScope
05/20/2025Permit IssuedJRY CONSTRUCTION INC3 scope_items
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
07/28/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/22/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/20/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/02/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
04/17/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
03/26/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
03/26/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/14/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/14/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/14/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
06/11/2025Subgrade InspectionsDEZHANG FANGspecial
06/11/2025Concrete - Cast-In-PlaceDEZHANG FANGspecial
06/11/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDEZHANG FANGspecial
06/11/2025Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
06/11/2025Structural Cold-Formed SteelDEZHANG FANGspecial
06/11/2025Air barrier — testing DEZHANG FANGenergy_progress
06/11/2025Insulation placement and R valuesDEZHANG FANGenergy_progress
06/11/2025Fenestration areasDEZHANG FANGenergy_progress
06/11/2025Air barrier - visual inspectionDEZHANG FANGenergy_progress
06/11/2025Fenestration air leakageDEZHANG FANGenergy_progress
06/11/2025MasonryDEZHANG FANGspecial
06/11/2025Excavations - Sheeting, Shoring, and BracingDEZHANG FANGspecial
06/11/2025Energy Code Compliance InspectionsDEZHANG FANGprogress
06/11/2025FinalDEZHANG FANGprogress
06/11/2025Fire-Resistance Rated ConstructionDEZHANG FANGprogress
06/11/2025Footing and FoundationDEZHANG FANGprogress
06/11/2025Permanent certificateDEZHANG FANGenergy_progress
06/11/2025Fenestration and door U-factor and product ratingsDEZHANG FANGenergy_progress
11/06/2024Fire-Resistant Penetrations and JointsYAN GAOspecial
11/06/2024Energy Code Compliance InspectionsYAN GAOprogress
11/06/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYAN GAOspecial
11/06/2024HVAC-R and service water heating system controlsYAN GAOenergy_progress
11/06/2024HVAC-R and service water heating equipmentYAN GAOenergy_progress
11/06/2024HVAC-R and service water piping design and insulationYAN GAOenergy_progress
11/05/2024HVAC-R and service water piping design and insulationYAN GAOenergy_progress
Latest 25 of 54.
▾Documents — 145 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch10
08/26/2026Q00670286-I1Request digital key ↗
08/22/2026Q01046327-S1Request digital key ↗
08/22/2026Q01046327-P2Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Curb Cut1
08/25/2026Q00349495-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00288521-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/15/2026Q00288550-I1Request digital key ↗
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION9
04/24/2025421755700Open ↗
02/27/2025421756415Open ↗
04/18/2022421755700Open ↗
Showing 3 of 9 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
03/18/2025421756415Open ↗
06/02/2020421756415Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
07/03/2025421756415Open ↗
▸BISWORK PERMIT APPLICATION1
10/07/2021421788541Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/20/2026Q00832969-P1Open ↗
08/15/2026Q00832969-I1Open ↗
08/13/2026Q00832969-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/20/2026Q00832969-P1Open ↗
08/15/2026Q00832969-I1Open ↗
08/13/2026Q00832969-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00832969-I1Open ↗
▸Seals & Professional Certifications48
▸DOB NOWSpecial Inspector Seal & Signature18
09/02/2026Q01046327-P2Open ↗
09/01/2026Q00832969-I1Open ↗
09/01/2026Q00832969-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/02/2026Q01046327-P2Open ↗
09/02/2026Q01046327-P2Open ↗
09/01/2026Q00832969-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/25/2026Q00349495-I1Open ↗
08/22/2026Q01046327-P1Open ↗
08/22/2026Q01046327-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/04/2020421755700Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/20/2026Q00832969-P1Open ↗
08/15/2026Q00832969-I1Open ↗
08/13/2026Q00832969-P2Open ↗
▸BISGAS CUT-OFF1
10/07/2021421788541Open ↗
▸BISELECTRIC CUT-OFF1
10/12/2021421788541Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
10/07/2021421788541Open ↗
▸Safety & Tenant Protection14
▸DOB NOWStreet Tree Checklist3
08/20/2026Q00832969-P1Open ↗
08/15/2026Q00832969-I1Open ↗
08/13/2026Q00832969-P2Open ↗
▸BISSTREET TREE CHECKLIST2
05/27/2020421756415Open ↗
03/04/2020421755700Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
10/07/2021421788541Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
10/07/2021421788541Open ↗
▸BISSTREET TREE SIGNOFF1
07/01/2025421756415Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
10/07/2021421788541Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
10/07/2021421788541Open ↗
▸BISSTREET TREES SITE PLAN1
07/01/2025421756415Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00832969-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00832969-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00832969-I1Open ↗
▸Environmental & Asbestos2
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
10/07/2021421788541Open ↗
▸BISRODENT CONTROL1
10/12/2021421788541Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/04/2020421755700Open ↗
▸Inspections & Test Reports4
▸DOB NOWGeotechnical Report (BC 1803.6)3
08/20/2026Q00832969-P1Open ↗
08/15/2026Q00832969-I1Open ↗
08/13/2026Q00832969-P2Open ↗
▸BISBPP: FIELD INSPECTION1
07/03/2025421756415Open ↗
▸Approvals, Objections & Sign-offs8
▸BISSCHEDULE A - OCCUPANCY / USE4
02/23/2021421755700Open ↗
08/18/2020421755700Open ↗
04/20/2020421755700Open ↗
Showing 3 of 4 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM1
10/07/2021421788541Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
07/03/2025421756415Open ↗
▸BISCURB CUT (CC) SIGNOFF1
07/01/2025421756415Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/07/2021421788541Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
10/07/2021421788541Open ↗
▸BISBPP: ENGINEERS AFFIDAVIT1
07/03/2025421756415Open ↗
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET3
06/03/2021421788541Open ↗
05/26/2020421756415Open ↗
03/04/2020421755700Open ↗
▸BISBOROUGH INTAKE FORM3
06/03/2021421788541Open ↗
05/26/2020421756415Open ↗
04/20/2020421755700Open ↗
▸BISADDITIONAL INFORMATION2
07/03/2025421756415Open ↗
03/18/2025421756415Open ↗
▸Other Documents19
▸BISBPP - SUPPORTING DOCUMENTATION4
07/03/2025421756415Open ↗
06/02/2020421756415Open ↗
06/02/2020421756415Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/15/2026Q00832969-I1Open ↗
08/13/2026Q00832969-P1Open ↗
08/13/2026Q00832969-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/20/2026Q00832969-P1Open ↗
08/15/2026Q00832969-I1Open ↗
08/13/2026Q00832969-P2Open ↗
▸DOB NOWSite Survey: Initial3
08/20/2026Q00832969-P1Open ↗
08/15/2026Q00832969-I1Open ↗
08/13/2026Q00832969-P2Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
07/03/2025421756415Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
07/03/2025421756415Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
07/03/2025421756415Open ↗
▸BISPLOT DIAGRAM1
03/04/2020421755700Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00832969-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00832969-I1Open ↗