← Back
Primarily 2 family with 1 store or office
97-10 32 AVENUE
QUEENS · BIN 4035022
💬 Discuss this project
1915Year Built
3Stories
S2Building Class
R4Zoning
2,783 sfGross Floor Area
3Units
Rent Stabilized36 Open Violations 31 unresolved · 5 paperwork only ▸FDNY Report ↗
Primarily 2 family with 1 store or office · 3,300 sf lot · 0.84 FAR built · Flood zone X
Locations of Work
Architecture
Floor 32p · 1 filing · 6 docs
Floor 2
Floor 1
Cellar1p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A M ENGINEERING SERVICES PC206/08/2026
Building Lifecycle
All (53)Filed (2)Violation (43)Objection (6)Special Inspection (2)
07/24/2026
Objection resolved — Resolved
07/24/2026
Objection resolved — Resolved
07/24/2026
Objection resolved — Resolved
07/02/2026
Objection raised — Cost
07/02/2026
Objection raised — Scope
07/02/2026
Objection raised — Mechanical
06/08/2026
Filed — Alteration
Legalize conditions associated with ECB Violations #35180297Z and #34876225Z. Restore attic to legal storage use by removing illegal partitions and plumbing fixtures; replace fire-damaged 2-hour rated partition; legalize existing cellar wood joist reinfor
Q01412113-S1
06/08/2026
Filed — Alteration
Legalize conditions associated with ECB Violations #35180297Z and #34876225Z. Restore attic to legal storage use by removing illegal partitions and plumbing fixtures; replace fire-damaged 2-hour rated partition; legalize existing cellar wood joist reinfor
Q01412113-I1
06/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
11/25/2025
Violation issued (HPD, closed)
I
08/13/2025
Violation issued (ECB, open)
Quality of Life
08/13/2025
Violation issued (ECB, open)
Quality of Life
08/13/2025
Violation issued (ECB, open)
Quality of Life
08/13/2025
Violation issued (ECB, open)
Quality of Life
08/13/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/25/2024
Violation issued (HPD, closed)
I
11/24/2024
Violation issued (HPD, open)
C
11/24/2024
Violation issued (HPD, closed)
B
11/24/2024
Violation issued (HPD, closed)
B
11/24/2024
Violation issued (HPD, closed)
B
11/24/2024
Violation issued (HPD, closed)
B
11/24/2024
Violation issued (HPD, open)
C
11/24/2024
Violation issued (HPD, open)
C
06/29/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/14/2016
Violation issued (ECB, open)
Construction
03/30/2016
Violation issued (ECB, open)
Construction
03/30/2016
Violation issued (ECB, open)
Construction
03/30/2016
Violation issued (ECB, open)
Construction
10/15/2010
Violation issued (ECB, open)
Construction
01/05/2006
Violation issued (HPD, open)
B
08/13/2001
Violation issued (HPD, open)
B
08/13/2001
Violation issued (HPD, open)
B
08/13/2001
Violation issued (HPD, open)
B
11/24/2000
Violation issued (HPD, open)
B
11/24/2000
Violation issued (HPD, open)
B
11/24/2000
Violation issued (HPD, open)
A
11/24/2000
Violation issued (HPD, open)
B
11/24/2000
Violation issued (HPD, open)
A
09/18/2000
Violation issued (HPD, open)
B
09/18/2000
Violation issued (HPD, open)
B
09/18/2000
Violation issued (HPD, open)
A
09/18/2000
Violation issued (HPD, open)
B
09/18/2000
Violation issued (HPD, open)
B
09/18/2000
Violation issued (HPD, open)
B
09/18/2000
Violation issued (HPD, open)
B
09/18/2000
Violation issued (HPD, open)
B
09/18/2000
Violation issued (HPD, open)
B
09/18/2000
Violation issued (HPD, open)
B
09/18/2000
Violation issued (HPD, open)
A
09/18/2000
Violation issued (HPD, open)
B
09/18/2000
Violation issued (HPD, open)
B
08/09/2000
Violation issued (HPD, open)
A
Nothing on file for this building.
1 project · most recent 06/08/2026
Water/Sanitary
FiledStatusContractorScope
06/08/2026——Water/Sanitary
2 projects · most recent 06/10/2026
General Wiring
FiledStatusContractorScope
06/10/2026Permit IssuedWCK ELECTRIC CORP.General Wiring
08/15/2025CompleteALL WAYS ELECTRIC CORP.W—
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
06/04/2026Fire-Resistant Penetrations and Joints—special
06/04/2026Fire-Resistance Rated Construction—progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026Q01412113-S1Request digital key ↗
08/15/2026Q01412113-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026Q01412113-S1Open ↗
08/16/2026Q01412113-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/16/2026Q01412113-S1Open ↗
08/15/2026Q01412113-I1Open ↗