ECB08/13/2013WORK W/O PERMIT. WORK NOTED: AT EXPOSURE #1 AT 1ST FL EXISTING METAL CANOPY WAS REMOVED AT FRONT PORCH & NEW FRAME CANOPY INSTALLED W/BRICK COLUMNS ATTACH TO FRONT MANSONARY PORCH. INSTALLED NEW ELECTRICAL FORNothing owed — awaiting certificate of correction
Three families · 4,000 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)