← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Rego Tower 64th Road Condominium
97-29 64TH ROAD · BIN 4622920
💬 Discuss this project
2019Year Built
9Stories
RMBuilding Class
C4-2Zoning
69,578 sfGross Floor Area
38Units
LL97 CoveredRent Stabilized8 Open Violations ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 64 ROAD LLC · 14,000 sf lot · 4.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Floor 78p · 1 filing · 7 docs
Floor 68p · 1 filing · 7 docs
Floor 58p · 1 filing · 7 docs
Floor 410p · 2 filings · 11 docs
Floor 318p · 5 filings · 20 docs
Floor 216p · 5 filings · 20 docs
Floor 113p · 6 filings · 20 docs
Mezzanine16p · 5 filings · 20 docs
Cellar11p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRI BOROUGH SCAFFOLDING707/08/2026
SUNLIGHT CONSTRUCTION AA1807/08/2026
64 ROAD803/22/2026
QUINCY REALTY1503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HPL ENGINEERING P.C.610/05/2021
HRM ENGINEERING SERVICES, PC608/10/2021
KZ ENGINEERING, P.C208/21/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H Z BUILDING NY603/21/2026
L Z CONSTRUCTION NY203/21/2026
SYNERGY BUILDING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRI BOROUGH SCAFFOLDINGGeneral Contractor607/08/2026
RIGHTWAY ELECTRICAL INCElectrical403/22/2026
SUNLIGHT CONSTRUCTION AAGeneral Contractor307/08/2026
H&Z BUILDING CONSULTING IGeneral Contractor307/08/2026
GRUSHINSKY PIPNG & HTG INFire Protection307/08/2026
KWONG MING ELECTRIC INCElectrical103/22/2026
FULL CIRCLE PLUMBING CORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC5613908/10/2021
Building Lifecycle
All (135)Filed (14)Permit Issued (12)Signed Off (8)Violation (38)Inspection (4)Objection (40)Special Inspection (19)
06/16/2025
Violation issued (HPD, closed)
A
10/01/2024
Violation issued (ECB, open)
Construction
08/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/07/2024
Violation issued (FDNY_NOV, closed)
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/25/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/13/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/24/2021
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/28/2021
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/20/2021
Objection resolved — Addressed
10/20/2021
Special inspection requirement — Public Assembly Emergency Lighting
Fran Huang
10/13/2021
Objection raised — Structural
10/05/2021
Filed — No Work
Q00494793-P1
09/08/2021
Signed off — Alteration
PROPOSED SPRINKLER SYSTEMS WORK ON 1ST FLOOR, MZ1, 2ND, 3RD FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. IN CONJUNCTION WITH GENERAL CONSTRUCTION JOB#Q00470356.
Q00484826-I1
09/08/2021
Permit issued — General Construction
Q00510975-I1-GC
09/07/2021
Signed off — Alteration
Q00477578-I1
08/23/2021
Signed off — Alteration
Q00470356-I1
08/20/2021
Signed off — Alteration
Q00484770-I1
08/11/2021
Permit issued — Mechanical Systems
Q00484770-I1-MS
08/10/2021
Filed — Alteration
Q00484770-I1
06/15/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fran Huang
06/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
06/15/2021
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
06/15/2021
Special inspection requirement — Fire-Resistance Rated Construction
Fran Huang
06/15/2021
Special inspection requirement — Interior lighting power
Fran Huang
06/15/2021
Special inspection requirement — Lighting controls
Fran Huang
06/14/2021
Filed — Alteration
Q00470356-P1
06/14/2021
Objection raised — Other
06/14/2021
Objection resolved — Addressed
06/14/2021
Objection raised — Other
06/14/2021
Objection resolved — Addressed
06/14/2021
Special inspection requirement — Fire-Resistance Rated Construction
Fran Huang
06/14/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
06/14/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fran Huang
06/14/2021
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
06/10/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
06/10/2021
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
06/10/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
06/10/2021
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
06/10/2021
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
06/07/2021
Filed — Alteration
PROPOSED SPRINKLER SYSTEMS WORK ON 1ST FLOOR, MZ1, 2ND, 3RD FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. IN CONJUNCTION WITH GENERAL CONSTRUCTION JOB#Q00470356.
Q00484826-P1
06/07/2021
Filed — Alteration
Q00477578-P3
05/26/2021
Objection raised — Other
05/26/2021
Objection resolved — Addressed
05/26/2021
Objection raised — Other
05/26/2021
Objection resolved — Addressed
04/27/2021
Filed — ALT-CO - New Building with Existing Elements to Remain
ADD OCCUPANCY GROUP A-3 TO 1ST FLOOR AND CHANGE NUMBER OF OCCUPANT ON 1ST, 2ND & 3RD FLOOR FOR EXISTING SCHOOL USE. OBTAIN NEW C/O.
Q00510975-I1
04/27/2021
Special inspection requirement — Fire-Resistance Rated Construction
Fran Huang
04/27/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
04/26/2021
Permit issued — Sprinklers
Q00484826-I1-EW-SP
04/05/2021
Objection raised — Other
04/05/2021
Objection resolved — Addressed
04/05/2021
Objection raised — Inspections
04/05/2021
Objection resolved — Addressed
04/05/2021
Objection raised — Structural
Latest 60 of 135 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedH&Z BUILDING CONSULTING I09/08/2021
DOB NOWMechanical SystemsSigned-offH&Z BUILDING CONSULTING I08/11/2021
DOB NOWSprinklersSigned-offGRUSHINSKY PIPNG & HTG IN04/26/2021
DOB NOWPlumbingSigned-offFULL CIRCLE PLUMBING CORP03/05/2021
DOB NOWGeneral ConstructionSigned-offSUNLIGHT CONSTRUCTION AA02/18/2021
DOB NOWStandpipeSigned-offGRUSHINSKY PIPNG & HTG IN01/05/2021
DOB NOWCurb CutSigned-offSUNLIGHT CONSTRUCTION AA11/27/2020
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING07/30/2020
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING04/02/2020
DOB NOWStandpipeSigned-offGRUSHINSKY PIPNG & HTG IN10/25/2019
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING08/22/2019
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING08/22/2019
BIS—ISSUEDSUNLIGHT CONSTRUCTION AA02/08/2021
BIS—ISSUEDSUNLIGHT CONSTRUCTION AA10/27/2020
BIS—ISSUEDSUNLIGHT CONSTRUCTION AA08/25/2020
BISPLISSUEDFULL CIRCLE PLUMBING CORP.08/20/2020
BISPLISSUEDFULL CIRCLE PLUMBING CORP.07/06/2020
BISEQISSUEDSUNLIGHT CONSTRUCTION AA02/06/2020
BIS—ISSUEDSUNLIGHT CONSTRUCTION AA12/27/2019
BIS—ISSUEDSUNLIGHT CONSTRUCTION AA10/23/2019
BIS—ISSUEDSUNLIGHT CONSTRUCTION AA08/19/2019
BIS—ISSUEDSUNLIGHT CONSTRUCTION AA06/14/2019
BIS—ISSUEDSUNLIGHT CONSTRUCTION AA06/14/2019
BISPLISSUEDFULL CIRCLE PLUMBING CORP.06/14/2019
BIS—ISSUEDSUNLIGHT CONSTRUCTION AA01/29/2019
BIS—ISSUEDSUNLIGHT CONSTRUCTION AA01/29/2019
BISEQISSUEDSUNLIGHT CONSTRUCTION AA01/29/2019
7 projects · most recent 06/18/2021
General Wiring
FiledStatusContractorScope
06/18/2021CompleteRIGHTWAY ELECTRICAL INCGeneral Wiring
05/17/2021CompleteRIGHTWAY ELECTRICAL INC—
11/06/2020CompleteRIGHTWAY ELECTRICAL INCGeneral Wiring
11/06/2020CompleteRIGHTWAY ELECTRICAL INC50 meters, 50 new_meters
11/01/2019CompleteKWONG MING ELECTRIC INC—
09/30/2019CompleteKWONG MING ELECTRIC INC—
09/03/2019CompleteRIGHTWAY ELECTRICAL INC—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/25/2022Pass-Final CND-Occupancy InspectionPassView ↗
01/13/2022Pass-Final CND-Occupancy InspectionPassView ↗
11/24/2021Pass-Final CND-Occupancy InspectionPassView ↗
10/28/2021Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
10/20/2021Public Assembly Emergency LightingFran Huangprogress
06/15/2021Structural Stability – Alterations of existing buildingsFran Huangspecial
06/15/2021Fire-Resistant Penetrations and JointsFran Huangspecial
06/15/2021Energy Code Compliance InspectionsFran Huangprogress
06/15/2021Fire-Resistance Rated ConstructionFran Huangprogress
06/15/2021Interior lighting powerFran Huangenergy_progress
06/15/2021Lighting controlsFran Huangenergy_progress
06/14/2021Fire-Resistance Rated ConstructionFran Huangprogress
06/14/2021Fire-Resistant Penetrations and JointsFran Huangspecial
06/14/2021Structural Stability – Alterations of existing buildingsFran Huangspecial
06/14/2021Energy Code Compliance InspectionsFran Huangprogress
06/10/2021HVAC-R and service water piping design and insulationFran Huangenergy_progress
06/10/2021HVAC-R and service water heating system controlsFran Huangenergy_progress
06/10/2021Fire-Resistant Penetrations and JointsFran Huangspecial
06/10/2021Energy Code Compliance InspectionsFran Huangprogress
06/10/2021HVAC-R and service water heating equipmentFran Huangenergy_progress
04/27/2021Fire-Resistance Rated ConstructionFran Huangprogress
04/27/2021Fire-Resistant Penetrations and JointsFran Huangspecial
08/09/2019FinalKarol Zdancewiczprogress
▾Documents — 307 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch6
08/27/2026Q00477578-P3Request digital key ↗
08/27/2026Q00477578-I1Request digital key ↗
08/27/2026Q00484826-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
08/27/2026Q00470356-P1Request digital key ↗
08/27/2026Q00470356-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly2
08/15/2026Q00494793-I1Request digital key ↗
08/14/2026Q00494793-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe1
08/28/2026Q00233325-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00208333-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/28/2026Q00208375-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/28/2026Q00199779-I1Request digital key ↗
▸Applications & Permits52
▸BISPLAN / WORK APPROVAL APPLICATION37
09/20/2022421811150Open ↗
03/23/2022421806237Open ↗
06/02/2021421789265Open ↗
Showing 3 of 37 on file for this type
▸BISWORK PERMIT APPLICATION11
03/25/2021421558102Open ↗
11/17/2020421558102Open ↗
11/17/2020421558102Open ↗
Showing 3 of 11 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
07/18/2020421722103Open ↗
03/24/2020421722103Open ↗
01/25/2019421722103Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/22/2020421558102Open ↗
▸Zoning, Tax Lot & Property Records23
▸BISADDRESS: NEW HOUSE NUMBER APPROVED4
08/05/2022421811150Open ↗
11/02/2021421806237Open ↗
05/04/2021421789265Open ↗
Showing 3 of 4 on file for this type
▸BISTAX LOT: FINAL LOT NUMBER ISSUED3
05/04/2021421789265Open ↗
01/25/2019421722103Open ↗
Showing 2 of 3 on file for this type
▸BISZONING DIAGRAM3
12/10/2020421558102Open ↗
12/30/2019421558102Open ↗
02/08/2019421558102Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED3
08/04/2022421811150Open ↗
11/02/2021421806237Open ↗
05/04/2021421789265Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
08/05/2022421811150Open ↗
11/02/2021421806237Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION2
08/05/2022421811150Open ↗
11/02/2021421806237Open ↗
▸BISVERIFY TAX LOT1
02/03/2021421558102Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
02/03/2021421558102Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00510975-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026Q00510975-I1Open ↗
▸Seals & Professional Certifications47
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/28/2026Q00199779-I1Open ↗
08/28/2026Q00208333-I1Open ↗
08/28/2026Q00208375-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
08/30/2026Q00510975-I1Open ↗
08/29/2026Q00494793-I1Open ↗
08/26/2026Q00470356-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/30/2026Q00510975-I1Open ↗
08/26/2026Q00470356-P1Open ↗
08/26/2026Q00470356-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
01/31/2019421558102Open ↗
01/25/2019421558102Open ↗
01/25/2019421558102Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
11/04/2019440572863Open ↗
06/06/2019440551136Open ↗
Showing 2 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
11/04/2019440572863Open ↗
06/06/2019440551136Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
11/04/2019440572863Open ↗
06/06/2019440551136Open ↗
Showing 2 of 3 on file for this type
▸Trade Schedules & Equipment31
▸BISEQUIPMENT USE APPLICATION/PERMIT12
02/03/2021421558102Open ↗
02/03/2021421558102Open ↗
02/03/2021421558102Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
12/20/2019421558102Open ↗
12/13/2019421558102Open ↗
11/29/2019421558102Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING7
11/05/2020421558102Open ↗
11/05/2020421558102Open ↗
10/29/2020421558102Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE PERMITS1
02/03/2021421558102Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
10/27/2020421558102Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST4
03/24/2020421722103Open ↗
01/25/2019421722103Open ↗
Showing 2 of 4 on file for this type
▸BISSTREET TREES SITE PLAN1
12/10/2020421558102Open ↗
▸BISSTREET TREE SIGNOFF1
12/10/2020421558102Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
01/31/2019421558102Open ↗
Showing 1 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
11/18/2020421558102Open ↗
06/06/2019440551136Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026Q00470356-I1Open ↗
08/13/2026Q00477578-I1Open ↗
08/13/2026Q00484770-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
06/06/2019440551136Open ↗
Showing 1 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/03/2021421558102Open ↗
▸BISNYCECC ANALYSIS1
06/06/2019440551136Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00484770-I1Open ↗
▸Inspections & Test Reports23
▸BISTECHNICAL REPORT: RESPONSIBILITY10
12/30/2020421558102Open ↗
12/08/2020440572863Open ↗
12/08/2020440572863Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
01/31/2019421558102Open ↗
01/31/2019421558102Open ↗
01/31/2019421558102Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS3
01/25/2019421558102Open ↗
01/25/2019421558102Open ↗
01/25/2019421558102Open ↗
▸BISHYDRO FLOW TEST LETTER3
01/25/2019421558102Open ↗
Showing 1 of 3 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF1
02/03/2021421558102Open ↗
▸BISSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
01/25/2019421558102Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
02/01/2019421558102Open ↗
▸Approvals, Objections & Sign-offs49
▸BISLETTERS - SUPPORTING DOCUMENTATION22
08/05/2022421811150Open ↗
08/05/2022421811150Open ↗
08/05/2022421811150Open ↗
Showing 3 of 22 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE21
12/09/2020421558102Open ↗
12/05/2020421558102Open ↗
10/29/2020421558102Open ↗
Showing 3 of 21 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
02/09/2021421558102Open ↗
02/03/2021421558102Open ↗
12/30/2020421558102Open ↗
Showing 3 of 6 on file for this type
▸Cost, Insurance & Ownership5
▸BISPROJECT-SPECIFIC GL INSURANCE2
03/25/2021421558102Open ↗
01/03/2020421558102Open ↗
▸BISCOST AFFIDAVIT2
06/06/2019440551136Open ↗
Showing 1 of 2 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
01/31/2019421558102Open ↗
▸Filing & Intake Forms33
▸BISADDITIONAL INFORMATION16
01/11/2021421558102Open ↗
12/10/2020421558102Open ↗
11/24/2020421558102Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING COVER SHEET10
09/20/2022421811150Open ↗
03/23/2022421806237Open ↗
06/02/2021421789265Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
11/04/2019440572863Open ↗
06/06/2019440551136Open ↗
Showing 2 of 3 on file for this type
▸BISBOROUGH INTAKE FORM3
06/02/2021421789265Open ↗
10/29/2020421930469Open ↗
05/14/2020421558102Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents9
▸BISPLOT DIAGRAM4
08/05/2022421811150Open ↗
11/02/2021421806237Open ↗
Showing 2 of 4 on file for this type
▸BISRECORDS MGMT FEE PAYMENT RECEIPT3
08/05/2022421811150Open ↗
11/03/2021421806237Open ↗
05/04/2021421789265Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
03/24/2020421722103Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00510975-I1Open ↗