← Back
Zoned residential, not Manhattan
97-44 64TH AVNUE
QUEENS · BIN 4623919
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R7-1Zoning
0 sfGross Floor Area
0Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
Zoned residential, not Manhattan · Owner of record: RUOGU CAPITAL LLC · 4,900 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalFire Protection
Roof3p · 1 filing · 15 docs
Bulkhead2p · 1 filing · 15 docs
Floor 73p · 1 filing · 15 docs
Floor 61p · 1 filing · 15 docs
Floor 5
Floor 4
Floor 34p · 1 filing · 15 docs
Floor 2
Floor 11p · 1 filing · 15 docs
Cellar5p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RUOGU CAPITAL1003/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/23/2021$1.5M—— → —— not available
10/10/2019$1.9M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EJC ENGINEERING, PLLC304/20/2022
TAN ARCHITECT P.C111/16/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CHANG HWA TAN103/21/2026
Building Lifecycle
All (24)Filed (4)Objection (8)Special Inspection (12)
04/22/2022
Objection raised — Structural
04/22/2022
Objection resolved — Addressed
04/22/2022
Objection raised — Inspections
04/22/2022
Objection resolved — Addressed
04/22/2022
Objection raised — Other
04/22/2022
Objection resolved — Addressed
04/22/2022
Objection raised — Other
04/22/2022
Objection resolved — Addressed
04/20/2022
Filed — New Building
Here with installation of the new sprinkler system
Q00613315-S8
04/19/2022
Filed — New Building
Here with installation of the new sprinkler system
Q00613315-S7
04/01/2022
Special inspection requirement — Sprinkler Systems
04/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/25/2022
Filed — New Building
Here with installation of the new sprinkler system
Q00613315-S6
03/21/2022
Special inspection requirement — Heating Systems
03/21/2022
Special inspection requirement — Post-installed Anchors
03/21/2022
Special inspection requirement — Maintenance information
03/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/21/2022
Special inspection requirement — HVAC-R and service water heating equipment
03/21/2022
Special inspection requirement — HVAC-R and service water heating system controls
03/21/2022
Special inspection requirement — Energy Code Compliance Inspections
03/21/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
03/07/2022
Special inspection requirement — Final
03/07/2022
Special inspection requirement — Mechanical Systems
11/16/2021
Filed — New Building
Here with installation of the new sprinkler system
Q00613315-I1
Nothing on file for this building.
1 project · most recent 04/20/2022
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScope
04/20/2022——Air Conditioning Systems, Heating Systems, Ventilation Systems
1 project · most recent 04/20/2022
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/20/2022——Gas, Storm, Water/Sanitary
1 project · most recent 04/20/2022
FiledStatusContractorScope
04/20/2022——1 scope_items
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
04/01/2022Sprinkler Systems—special
04/01/2022Fire-Resistant Penetrations and Joints—special
03/21/2022Heating Systems—special
03/21/2022Post-installed Anchors—special
03/21/2022Maintenance information—energy_progress
03/21/2022Fire-Resistant Penetrations and Joints—special
03/21/2022HVAC-R and service water heating equipment—energy_progress
03/21/2022HVAC-R and service water heating system controls—energy_progress
03/21/2022Energy Code Compliance Inspections—progress
03/21/2022HVAC-R and service water piping design and insulation—energy_progress
03/07/2022Final—progress
03/07/2022Mechanical Systems—special
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/26/2026Q00613315-S6Request digital key ↗
08/26/2026Q00613315-S4Request digital key ↗
08/26/2026Q00613315-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q00613315-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00613315-I1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/13/2026Q00613315-I1Open ↗
08/13/2026Q00613315-S7Open ↗
08/13/2026Q00613315-S8Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026Q00613315-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00613315-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q00613315-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/26/2026Q00613315-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00613315-I1Open ↗