Two family frame
97-52 BRISTOL AVENUE
QUEENS · Ozone Park · BIN 4541372
💬 Discuss this project
2021Year Built
2Stories
B2Building Class
R3XZoning
3,080 sfGross Floor Area
2Units
Rent StabilizedFDNY Report ↗
Two family frame · Owner of record: BRISTOL OZONE, LLC · 5,201 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
StructuralPlumbing
Roof1p · 1 filing · 2 docs
Cellar1p · 1 filing · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRISTOL OZONE LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GERALD CALIENDO ARCHITECTS208/11/2026
TABRIZ DESIGN GROUP707/29/2024
RAS PE CONSULTING ENGINEERS103/10/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TABRIZ DESIGN GROUP203/21/2026
TABRIZ GROUP ENTERPRISE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
W.R. PLBG AND HTG CORPPlumbing407/08/2026
KAIETEUR CONSTRUCTION INC.General Contractor307/08/2026
IMPACT BUILDERS CORPGeneral Contractor108/30/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519208/11/2026
TABRIZ GROUP ENTERPRISES3275407/29/2024
TRIANGLE INSPECTION & TES7495407/29/2024
Building Lifecycle
All (53)Filed (10)Permit Issued (8)Signed Off (3)Inspection (7)Objection (6)Special Inspection (19)
08/28/2026
Permit issued — Solar
Q01421304-I1-SL
08/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
08/19/2026
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
08/19/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
08/19/2026
Special inspection requirement — Final
NAVEEN KUMAR
08/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/11/2026
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON THE EXISTING ROOF OF THE EXISTING (2) TWO STORY TWO FAMILY BUILDING
Q01421304-P1
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
08/11/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
08/11/2026
Special inspection requirement — Final
NAVEEN KUMAR
08/11/2026
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
07/24/2026
Objection resolved — Addressed
07/10/2026
Objection resolved — Addressed
07/10/2026
Objection resolved — Addressed
07/07/2026
Objection raised — Other
07/07/2026
Objection raised — Other
07/07/2026
Objection raised — Other
06/29/2026
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON THE EXISTING ROOF OF THE EXISTING (2) TWO STORY TWO FAMILY BUILDING
Q01421304-I1
03/26/2025
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH NEW BUILDING APPLICATION # 440662677
Q00457267-I1
10/10/2024
Permit issued — Plumbing
Q00457267-I1-PL
09/11/2024
Permit issued — Plumbing
Q00457267-I1-PL
09/10/2024
Signed off — Alteration
PROPOSED 9 FEET CURB CUT PAIRED WITH PROPOSED ADJACENT PROPERTY 9 FEET CURB CUT.
Q00457276-I1
09/09/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/02/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
07/29/2024
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH NEW BUILDING APPLICATION # 440662677
Q00457267-P3
07/09/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
BAKHTIAR SHAMLOO
07/09/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
07/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
01/29/2024
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH NEW BUILDING APPLICATION # 440662677
Q00457267-P2
01/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
01/24/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
BAKHTIAR SHAMLOO
01/24/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
07/25/2023
Permit issued — Plumbing
Q00457267-I1-PL
02/01/2023
Signed off — Alteration
TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH NB APP# 440662677
Q00505207-I1
03/10/2022
Filed — Alteration
HEREWITH FILING FOR INSTALLATION OF SOLAR PANEL ON ROOF IN CONJUNCTION TO ARCHITECT APPLICATION DOB JOB#440702562
Q00695222-I1
12/17/2021
Permit issued — Curb Cut
Q00457276-I1-CC
10/29/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/29/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/29/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/21/2021
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH NEW BUILDING APPLICATION # 440662677
Q00457267-P1
10/21/2021
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
10/21/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
10/21/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
BAKHTIAR SHAMLOO
10/15/2021
Filed — Alteration
PROPOSED 9 FEET CURB CUT PAIRED WITH PROPOSED ADJACENT PROPERTY 9 FEET CURB CUT.
Q00457276-I1
09/21/2021
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
09/21/2021
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/24/2021
Permit issued — Plumbing
Q00457267-I1-PL
07/22/2021
Permit issued — Plumbing
Q00457267-I1-PL
07/07/2021
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH NEW BUILDING APPLICATION # 440662677
Q00457267-I1
06/29/2021
Filed — Alteration
TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH NB APP# 440662677
Q00505207-P1
05/19/2021
Permit issued — Construction Fence
Q00505207-I1-FN
04/16/2021
Filed — Alteration
TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH NB APP# 440662677
Q00505207-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offIMPACT BUILDERS CORP08/28/2026
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC10/10/2024
DOB NOWPlumbingSigned-offW.R. PLBG AND HTG CORP09/11/2024
DOB NOWPlumbingSigned-offW.R. PLBG AND HTG CORP07/25/2023
DOB NOWCurb CutSigned-offKAIETEUR CONSTRUCTION INC12/17/2021
DOB NOWPlumbingSigned-offW.R. PLBG AND HTG CORP08/24/2021
DOB NOWPlumbingSigned-offW.R. PLBG AND HTG CORP07/22/2021
DOB NOWConstruction FenceSigned-offKAIETEUR CONSTRUCTION INC05/19/2021
BIS—ISSUEDKAIETEUR CONSTRUCTION INC.04/04/2022
2 projects · most recent 04/21/2026
General Wiring
FiledStatusContractorScope
04/21/2026CompleteVILLAGE ELECTL CONTRS INC—
02/17/2023CompleteAYYUB ELECTRIC CORPGeneral Wiring
1 project · most recent 03/10/2022
Wood
FiledStatusContractorScope
03/10/2022——Wood
1 project · most recent 08/11/2026
FiledStatusContractorScope
08/11/2026Signed-offIMPACT BUILDERS CORP20 panels, 8.5 kw, 1,710 roof_area_sqft
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/09/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
08/02/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
10/29/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/29/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/29/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/21/2021Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/21/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
08/19/2026Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
08/19/2026Air barrier - visual inspectionYounes Abouyaalaenergy_progress
08/19/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
08/19/2026FinalNAVEEN KUMARprogress
08/19/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/11/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/11/2026Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
08/11/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
08/11/2026FinalNAVEEN KUMARprogress
08/11/2026Air barrier - visual inspectionYounes Abouyaalaenergy_progress
07/09/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBAKHTIAR SHAMLOOspecial
07/09/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
07/09/2024Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
01/24/2024Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
01/24/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBAKHTIAR SHAMLOOspecial
01/24/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
10/21/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
10/21/2021Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
10/21/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBAKHTIAR SHAMLOOspecial
▾Documents — 159 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch5
08/27/2026Q00505207-P1Request digital key ↗
08/27/2026Q00505207-I1Request digital key ↗
08/26/2026Q00695222-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/23/2026Q00457267-P3Request digital key ↗
08/23/2026Q00457267-P2Request digital key ↗
08/23/2026Q00457267-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Curb Cut1
08/27/2026Q00457276-I1Request digital key ↗
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION9
09/29/2025440665807Open ↗
01/13/2025440702562Open ↗
03/27/2023440662677Open ↗
Showing 3 of 9 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
10/16/2025440665807Open ↗
12/19/2024440665807Open ↗
11/07/2021440665807Open ↗
▸Zoning, Tax Lot & Property Records10
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
11/07/2021440665807Open ↗
02/11/2021440662677Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP2
07/30/2024440662677Open ↗
07/30/2024440662677Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
01/28/2026440665807Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
04/15/2021440662677Open ↗
▸BISVERIFY TAX LOT1
07/30/2024440662677Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
02/11/2021440662677Open ↗
▸BISZONING DIAGRAM1
04/15/2021440662677Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
04/15/2021440662677Open ↗
▸Seals & Professional Certifications34
▸DOB NOWSpecial Inspector Seal & Signature11
09/13/2026Q00457267-P1Open ↗
09/13/2026Q00457267-P1Open ↗
09/13/2026Q00457267-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/27/2026Q00457276-I1Open ↗
08/26/2026Q00695222-I1Open ↗
08/23/2026Q00457267-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026Q01421304-I1Open ↗
09/01/2026Q01421304-I1Open ↗
09/01/2026Q01421304-I1Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
01/21/2022440702562Open ↗
11/07/2021440665807Open ↗
02/11/2021440662677Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
01/21/2022440702562Open ↗
11/07/2021440665807Open ↗
02/12/2021440662677Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
07/29/2021440662677Open ↗
▸Trade Schedules & Equipment5
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
07/31/2024440662677Open ↗
▸BISSPRINKLER SYSTEMS1
07/31/2024440662677Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
02/10/2026440662677Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SC1
01/25/2022440662677Open ↗
▸BISHEATING SYSTEMS1
07/31/2024440662677Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST2
11/07/2021440665807Open ↗
02/11/2021440662677Open ↗
▸BISSTREET TREES SITE PLAN2
01/27/2026440665807Open ↗
07/31/2024440662677Open ↗
▸BISSTREET TREE SIGNOFF2
01/27/2026440665807Open ↗
01/24/2025440662677Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
11/22/2021440662677Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
07/31/2024440662677Open ↗
01/21/2022440702562Open ↗
04/15/2021440662677Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
01/21/2022440702562Open ↗
02/12/2021440662677Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
07/31/2024440662677Open ↗
▸BISFENESTRATION AREAS1
07/31/2024440662677Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
07/31/2024440662677Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
07/31/2024440662677Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/31/2024440662677Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/29/2021440662677Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/01/2024440662677Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
07/31/2024440662677Open ↗
▸BISFENESTRATION AIR LEAKAGE1
07/31/2024440662677Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY5
07/31/2024440662677Open ↗
07/31/2024440662677Open ↗
01/21/2022440702562Open ↗
Showing 3 of 5 on file for this type
▸BISSUBGRADE INSP / SOILS-SITE PREP2
07/31/2024440662677Open ↗
07/31/2024440662677Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
07/31/2024440662677Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
07/31/2024440662677Open ↗
▸BISMASONRY1
07/31/2024440662677Open ↗
▸BISSOIL REPORT1
02/11/2021440662677Open ↗
▸BISSOIL PERC. TEST-PVT ON-SITE STORM WATER DRAINAGE DISPOSAL SYS & DET. FACL.1
08/01/2024440662677Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
07/29/2021440662677Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
02/12/2021440662677Open ↗
▸BISMECHANICAL SYSTEMS1
07/31/2024440662677Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
07/29/2021440662677Open ↗
▸Approvals, Objections & Sign-offs6
▸BISSCHEDULE A - OCCUPANCY / USE4
04/06/2021440662677Open ↗
03/30/2021440662677Open ↗
02/22/2021440662677Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
04/18/2022440702562Open ↗
03/29/2022440702562Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
04/11/2022440702562Open ↗
04/07/2022440702562Open ↗
▸Filing & Intake Forms17
▸BISADDITIONAL INFORMATION14
10/16/2025440665807Open ↗
08/07/2024440662677Open ↗
08/09/2023440662677Open ↗
Showing 3 of 14 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
01/21/2022440702562Open ↗
11/07/2021440665807Open ↗
02/12/2021440662677Open ↗
▸Other Documents14
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
04/15/2021440662677Open ↗
04/15/2021440662677Open ↗
04/15/2021440662677Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
01/25/2022440662677Open ↗
01/25/2022440662677Open ↗
▸BISPLOT DIAGRAM2
07/30/2024440662677Open ↗
02/12/2021440662677Open ↗
▸BISMAINTENANCE INFORMATION1
07/31/2024440662677Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
07/31/2024440662677Open ↗
▸BISPERMANENT CERTIFICATE1
07/31/2024440662677Open ↗
▸BISDUCT DESIGN, INSULATION AND LEAKAGE TESTING1
07/31/2024440662677Open ↗
▸BISVENTILATION AND AIR DISTRIBUTION SYSTEM1
07/31/2024440662677Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
11/07/2021440665807Open ↗
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION1
07/31/2024440662677Open ↗