← Back
BuildNYC
Two family frame
97-52 BRISTOL AVENUE
QUEENS · Ozone Park · BIN 4541372
💬 Discuss this project
2021Year Built
2Stories
B2Building Class
R3XZoning
3,080 sfGross Floor Area
2Units
Rent StabilizedFDNY Report ↗
Two family frame · Owner of record: Bristol Ozone · 5,201 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSolar panel installation on roof2 filings · 14 docs
Floor 26p · 1 filing · 18 docs
Floor 1Proposed 9 feet curb cut7p · 2 filings · 20 docs
Cellar7p · 1 filing · 18 docs
Site & exteriorROPD drop curb construction8p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Bristol Ozone103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Gerald Caliendo Architects208/11/2026
Tabriz Design Group707/29/2024
RAS PE Consulting Engineers103/10/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Tabriz Design Group203/21/2026
Tabriz Group Enterprise203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
W.R. Plumbing and HeatingPlumbing407/08/2026
Kaieteur ConstructionScaffold203/21/2026
Kaieteur ConstructionGeneral Contractor207/08/2026
Impact Buildersspecialty_contractor108/30/2026
All Pro Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA Building & Inspection1519208/11/2026
Tabriz Group Enterprises3275407/29/2024
Triangle Inspection & Tes7495407/29/2024
Building Lifecycle
09/23/2026
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON THE EXISTING ROOF OF THE EXISTING (2) TWO STORY TWO FAMILY BUILDING
Q01421304-I1
08/28/2026
Permit issued — Solar
Q01421304-I1-SL
08/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
08/19/2026
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
08/19/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
49 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offImpact Builders08/28/2026
DOB NOWPlumbingSigned-offAll Pro Plumbing & Heating10/10/2024
DOB NOWPlumbingSigned-offW.R. Plumbing and Heating09/11/2024
DOB NOWPlumbingSigned-offW.R. Plumbing and Heating07/25/2023
DOB NOWCurb CutSigned-offKaieteur Construction12/17/2021
DOB NOWPlumbingSigned-offW.R. Plumbing and Heating08/24/2021
DOB NOWPlumbingSigned-offW.R. Plumbing and Heating07/22/2021
DOB NOWConstruction FenceSigned-offKaieteur Construction05/19/2021
BIS—ISSUEDKaieteur Construction04/04/2022
2 projects · most recent 04/21/2026
General Wiring
FiledStatusContractorScope
04/21/2026CompleteVillage Electl Contractors—
02/17/2023CompleteAyyub ElectricGeneral Wiring
1 project · most recent 03/10/2022
Wood
FiledStatusContractorScope
03/10/2022——Wood
1 project · most recent 08/11/2026
FiledStatusContractorScope
08/11/2026Signed-offImpact Builders—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/29/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/29/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/29/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/21/2021Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/21/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
08/19/2026Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
08/19/2026Air barrier - visual inspectionYounes Abouyaalaenergy_progress
08/19/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
08/19/2026FinalNAVEEN KUMARprogress
08/19/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/11/2026Air barrier - visual inspectionYounes Abouyaalaenergy_progress
08/11/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/11/2026Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
08/11/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
08/11/2026FinalNAVEEN KUMARprogress
07/09/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBAKHTIAR SHAMLOOspecial
07/09/2024Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
07/09/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
01/24/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBAKHTIAR SHAMLOOspecial
01/24/2024Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
01/24/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
10/21/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBAKHTIAR SHAMLOOspecial
10/21/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
10/21/2021Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
159 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account