ECB09/22/1992WORK WITHOUT A PERMIT.WORK NOTED.HAVING INSTALLED A CANOPY AT ENTRANCE TO DR.OFFICE APPROX.4'X20'FEET.REMEDY:OBTAIN A PERMIT IF FEASIBLE OR REMOVE CANOPY FROM PREMISES.Nothing owed — awaiting certificate of correction
ECB11/29/1989FAILURE TO MAINTAIN. LEADER PIPE FROM ROOF GUTTER FROM PROPER SEWER DRAINAGE TO SIDE OF BUILDING CAUSING WATER FLOW ONTO OPEN DRIVEWAY AND SIDEWALK AREA.Nothing owed — awaiting certificate of correction
ECB09/27/1989WORK WITHOUT A PERMIT. REMEDY: OBTAIN A PERMIT.Nothing owed — awaiting certificate of correction
ECB04/13/1989WORK WITHOUT A PERMIT. REMEDY: OBTAIN PERMITS IF FEASIBLE OR RETURN PREMISES TO PRIOR LEGAL CONDITION.Nothing owed — awaiting certificate of correction
Primarily 2 family with 1 store or office · 0.81 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.