← Back
Primarily 2 family with 1 store or office
97 BELMONT AVENUE
BROOKLYN · BIN 3083883
💬 Discuss this project
1930Year Built
3Stories
S2Building Class
R6Zoning
2,700 sfGross Floor Area
3Units
15 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 97 BELMONT AVENUE REALTY CORP · 1,000 sf lot · 2.7 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 3Under Construction2p · 2 filings · 12 docs
Floor 2Under Construction1p · 1 filing · 4 docs
Floor 1
CellarUnder Construction3p · 2 filings · 8 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/07/2025$950K—97 BELMONT AVENUE REALTY CORP → 97 BELMONTEE LLC$352/sf building
03/08/2016$136K—Private party → 97 BELMONT AVENUE REALTY CORP$50/sf building
06/17/2014$450K—Private party → Private party$167/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FARHAD BASSIRI-TEHRANI607/09/2026
ARQUITECTURA VARELA111/06/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALPHA SCAFFOLDING INCGeneral Contractor407/03/2026
JOHN FITZGERALD PLBG &HTGPlumbing207/08/2026
KALE CONSTRUCTION INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394207/08/2026
Building Lifecycle
All (44)Filed (7)Permit Issued (5)Violation (30)Inspection (2)
08/26/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/09/2026
Filed — Alteration
INSTALL (3) NEW BOILERS FOR EXISTING 2-FAMILY DWELLING AND COMMERCIAL STORE IN CELLAR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01328327-P1
07/09/2026
Filed — Alteration
RENOVATION OF EXISTING CELLAR, 2ND AND 3RD FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01328325-P1
07/08/2026
Filed — Alteration
RENOVATION OF EXISTING CELLAR, 2ND AND 3RD FLOOR WITH GENERAL CONSTRUCTION:NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01328323-P1
06/24/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/13/2026
Violation issued (FDNY_NOV, closed)
02/13/2026
Violation issued (FDNY_NOV, closed)
02/13/2026
Violation issued (FDNY_NOV, closed)
12/29/2025
Violation issued (FDNY_ORDER, closed)
12/29/2025
Violation issued (FDNY_NOV, closed)
12/29/2025
Violation issued (FDNY_NOV, closed)
12/29/2025
Violation issued (FDNY_ORDER, closed)
12/29/2025
Violation issued (FDNY_ORDER, closed)
12/23/2025
Permit issued — Boiler Equipment
B01328327-I1-BE
12/11/2025
Permit issued — Plumbing
B01328325-I1-PL
12/08/2025
Permit issued — General Construction
B01328323-I1-GC
12/04/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, 2ND AND 3RD FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01328325-I1
12/04/2025
Filed — Alteration
INSTALL (3) NEW BOILERS FOR EXISTING 2-FAMILY DWELLING AND COMMERCIAL STORE IN CELLAR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01328327-I1
12/04/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, 2ND AND 3RD FLOOR WITH GENERAL CONSTRUCTION:NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01328323-I1
11/07/2025
Permit issued — Sidewalk Shed
B01138070-I1-SH
12/04/2024
Violation issued (HPD, open)
B
12/04/2024
Violation issued (HPD, open)
C
12/04/2024
Violation issued (HPD, open)
A
12/04/2024
Violation issued (HPD, open)
C
12/04/2024
Violation issued (HPD, open)
C
12/04/2024
Violation issued (HPD, open)
C
12/04/2024
Violation issued (HPD, open)
C
12/04/2024
Violation issued (HPD, open)
A
12/04/2024
Violation issued (HPD, open)
C
12/04/2024
Violation issued (HPD, open)
A
12/04/2024
Violation issued (HPD, open)
A
12/04/2024
Violation issued (HPD, open)
A
11/07/2024
Permit issued — Sidewalk Shed
B01138070-I1-SH
11/06/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01138070-I1
07/31/2024
Violation issued (FDNY_NOV, closed)
03/06/2024
Violation issued (HPD, open)
I
03/01/2024
Violation issued (HPD, open)
B
03/01/2024
Violation issued (HPD, open)
C
11/16/2006
Violation issued (FDNY_NOV, closed)
10/22/2003
Violation issued (FDNY_NOV, closed)
10/22/2003
Violation issued (FDNY_NOV, closed)
03/31/2003
Violation issued (FDNY_NOV, closed)
09/11/2002
Violation issued (FDNY_NOV, closed)
07/07/1992
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedJOHN FITZGERALD PLBG &HTG12/23/2025
DOB NOWPlumbingPermit IssuedJOHN FITZGERALD PLBG &HTG12/11/2025
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC12/08/2025
DOB NOWSidewalk ShedPermit IssuedALPHA SCAFFOLDING INC11/07/2025
DOB NOWSidewalk ShedPermit IssuedALPHA SCAFFOLDING INC11/07/2024
1 project · most recent 07/09/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/09/2026Permit IssuedJOHN FITZGERALD PLBG &HTGGas, Water/Sanitary
2 projects · most recent 12/19/2025
General Wiring
FiledStatusContractorScope
12/19/2025Permit IssuedKJK ELECTRIC INCGeneral Wiring
11/07/2024Permit IssuedRICHARD NEU—
1 project · most recent 11/06/2024
Sidewalk Shed
FiledStatusContractorScope
11/06/2024Permit IssuedALPHA SCAFFOLDING INCSidewalk Shed
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/26/2026Fail-Final General Construction Non-Directive 14FailView ↗
06/24/2026Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
07/10/2026Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
07/10/2026Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
07/10/2026Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
07/08/2026Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
07/08/2026Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
07/08/2026Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026B01138070-I1Request digital key ↗
08/19/2026B01328325-I1Request digital key ↗
08/19/2026B01328325-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/19/2026B01328325-P1Open ↗
08/19/2026B01328327-P1Open ↗
08/19/2026B01328323-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/02/2026B01328323-P1Open ↗
08/28/2026B01328323-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026B01328323-P1Open ↗
08/28/2026B01328323-I1Open ↗