One family attached or semi-detached
97 MONAHAN AVENUE
STATEN ISLAND · BIN 5175386
💬 Discuss this project
2023Year Built
2Stories
A5Building Class
R3-1Zoning
1,426 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 2,361 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
StructuralCivil
Roof1p · 1 filing · 20 docs
Floor 28p · 1 filing · 20 docs
Floor 18p · 1 filing · 20 docs
Basement8p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WALLACE AVENUE CONSTRUCTION1107/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT511/29/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L. GASS503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WALLACE AVENUE CONSTR LLCGeneral Contractor507/08/2026
DV PLUMBING INCPlumbing107/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ISLAND ENGINEERING ASSOCI264211/29/2023
Building Lifecycle
All (54)Filed (5)Permit Issued (5)Signed Off (2)Violation (1)Inspection (9)Objection (2)Special Inspection (30)
11/29/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/29/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
11/29/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/16/2024
Signed off — New Building
PROPOSED THREE STORY ONE-FAMILY SEMI-DETACHED DWELLING WITH ACCESSORY OFF-STREET PARKING FOR TWO CARS.
S00685799-S1
03/07/2024
Permit issued — Plumbing
S00685799-S1-PL
03/06/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/29/2024
Signed off — New Building
PROPOSED THREE STORY ONE-FAMILY SEMI-DETACHED DWELLING WITH ACCESSORY OFF-STREET PARKING FOR TWO CARS.
S00685799-S2
01/18/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/18/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/16/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/04/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
WILLIAM DURDEN, P.E.
12/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM DURDEN, P.E.
12/04/2023
Special inspection requirement — Mechanical Systems
WILLIAM DURDEN, P.E.
12/04/2023
Special inspection requirement — Subgrade Inspections
WILLIAM DURDEN, P.E.
12/04/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
WILLIAM DURDEN, P.E.
12/04/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM DURDEN, P.E.
12/04/2023
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM DURDEN, P.E.
12/04/2023
Special inspection requirement — Final
WILLIAM DURDEN, P.E.
12/04/2023
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM DURDEN, P.E.
12/04/2023
Special inspection requirement — Structural Wood Frame
WILLIAM DURDEN, P.E.
12/04/2023
Special inspection requirement — Footing and Foundation
WILLIAM DURDEN, P.E.
12/04/2023
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM DURDEN, P.E.
12/04/2023
Special inspection requirement — Protection of exposed foundation insulation
WILLIAM DURDEN, P.E.
12/04/2023
Special inspection requirement — Maintenance information
WILLIAM DURDEN, P.E.
12/04/2023
Special inspection requirement — Ventilation and air distribution system
WILLIAM DURDEN, P.E.
12/04/2023
Special inspection requirement — Permanent certificate
WILLIAM DURDEN, P.E.
12/04/2023
Special inspection requirement — Air barrier — testing
WILLIAM DURDEN, P.E.
12/04/2023
Special inspection requirement — Fenestration air leakage
WILLIAM DURDEN, P.E.
12/04/2023
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM DURDEN, P.E.
12/04/2023
Special inspection requirement — Fenestration areas
WILLIAM DURDEN, P.E.
12/04/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM DURDEN, P.E.
12/04/2023
Special inspection requirement — Interior lighting power
WILLIAM DURDEN, P.E.
12/04/2023
Special inspection requirement — Air barrier - visual inspection
WILLIAM DURDEN, P.E.
12/04/2023
Special inspection requirement — Electric vehicle service equipment requirements
WILLIAM DURDEN, P.E.
12/04/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM DURDEN, P.E.
12/04/2023
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM DURDEN, P.E.
12/04/2023
Special inspection requirement — Duct leakage testing, insulation and design
WILLIAM DURDEN, P.E.
12/04/2023
Special inspection requirement — Insulation placement and R values
WILLIAM DURDEN, P.E.
11/29/2023
Filed — New Building
PROPOSED THREE STORY ONE-FAMILY SEMI-DETACHED DWELLING WITH ACCESSORY OFF-STREET PARKING FOR TWO CARS.
S00685799-P2
11/29/2023
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM DURDEN, P.E.
11/29/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
WILLIAM DURDEN, P.E.
11/27/2023
Filed — New Building
PROPOSED THREE STORY ONE-FAMILY SEMI-DETACHED DWELLING WITH ACCESSORY OFF-STREET PARKING FOR TWO CARS.
S00685799-P1
09/07/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/24/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/30/2023
Permit issued — Earth Work
S00685799-I1-GC-CX
04/24/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/27/2023
Permit issued — Plumbing
S00685799-S1-PL
10/04/2022
Permit issued — Curb Cut
S00685799-S2-CC
09/21/2022
Filed — New Building
PROPOSED THREE STORY ONE-FAMILY SEMI-DETACHED DWELLING WITH ACCESSORY OFF-STREET PARKING FOR TWO CARS.
S00685799-S2
07/13/2022
Filed — New Building
PROPOSED THREE STORY ONE-FAMILY SEMI-DETACHED DWELLING WITH ACCESSORY OFF-STREET PARKING FOR TWO CARS.
S00685799-S1
06/30/2022
Permit issued — Structural
S00685799-I1-GC-CX
06/20/2022
Objection resolved — Addressed
05/13/2022
Objection raised — Scope
04/25/2022
Filed — New Building
PROPOSED THREE STORY ONE-FAMILY SEMI-DETACHED DWELLING WITH ACCESSORY OFF-STREET PARKING FOR TWO CARS.
S00685799-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDV PLUMBING INC03/07/2024
DOB NOWEarth WorkPermit IssuedWALLACE AVENUE CONSTR LLC06/30/2023
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR03/27/2023
DOB NOWCurb CutSigned-offWALLACE AVENUE CONSTR LLC10/04/2022
DOB NOWStructuralPermit IssuedWALLACE AVENUE CONSTR LLC06/30/2022
1 project · most recent 11/29/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
11/29/2023Signed-offDV PLUMBING INCGas, Storm, Water/Sanitary
1 project · most recent 08/14/2023
General Wiring
FiledStatusContractorScope
08/14/2023CompleteA. J. CARUSO ELECTRICAL IGeneral Wiring
1 project · most recent 11/29/2023
Concrete Wood
FiledStatusContractorScope
11/29/2023Signed-offDV PLUMBING INCConcrete, Wood
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
11/29/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/29/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/29/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/18/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/18/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
01/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/07/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/24/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
12/04/2023Exterior Insulation and Finish Systems (EIFS)WILLIAM DURDEN, P.E.special
12/04/2023Fire-Resistant Penetrations and JointsWILLIAM DURDEN, P.E.special
12/04/2023Mechanical SystemsWILLIAM DURDEN, P.E.special
12/04/2023Subgrade InspectionsWILLIAM DURDEN, P.E.special
12/04/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM DURDEN, P.E.special
12/04/2023Subsurface Investigations (Borings/Test Pits)WILLIAM DURDEN, P.E.special
12/04/2023Concrete - Cast-In-PlaceWILLIAM DURDEN, P.E.special
12/04/2023FinalWILLIAM DURDEN, P.E.progress
12/04/2023Fire-Resistance Rated ConstructionWILLIAM DURDEN, P.E.progress
12/04/2023Structural Wood FrameWILLIAM DURDEN, P.E.progress
12/04/2023Footing and FoundationWILLIAM DURDEN, P.E.progress
12/04/2023Energy Code Compliance InspectionsWILLIAM DURDEN, P.E.progress
12/04/2023Protection of exposed foundation insulationWILLIAM DURDEN, P.E.energy_progress
12/04/2023Maintenance informationWILLIAM DURDEN, P.E.energy_progress
12/04/2023Ventilation and air distribution systemWILLIAM DURDEN, P.E.energy_progress
12/04/2023Permanent certificateWILLIAM DURDEN, P.E.energy_progress
12/04/2023Air barrier — testing WILLIAM DURDEN, P.E.energy_progress
12/04/2023Fenestration air leakageWILLIAM DURDEN, P.E.energy_progress
12/04/2023HVAC-R and service water heating system controlsWILLIAM DURDEN, P.E.energy_progress
12/04/2023Fenestration areasWILLIAM DURDEN, P.E.energy_progress
12/04/2023Fenestration and door U-factor and product ratingsWILLIAM DURDEN, P.E.energy_progress
12/04/2023Interior lighting powerWILLIAM DURDEN, P.E.energy_progress
12/04/2023Air barrier - visual inspectionWILLIAM DURDEN, P.E.energy_progress
12/04/2023Electric vehicle service equipment requirementsWILLIAM DURDEN, P.E.energy_progress
12/04/2023HVAC-R and service water piping design and insulationWILLIAM DURDEN, P.E.energy_progress
Latest 25 of 56.
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/24/2026S00685799-P2Request digital key ↗
08/24/2026S00685799-P1Request digital key ↗
08/24/2026S00685799-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S00685799-I1Open ↗
08/13/2026S00685799-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S00685799-I1Open ↗
08/13/2026S00685799-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00685799-I1Open ↗
▸Seals & Professional Certifications15
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026S00685799-P2Open ↗
09/01/2026S00685799-P2Open ↗
09/01/2026S00685799-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/24/2026S00685799-I1Open ↗
08/24/2026S00685799-P2Open ↗
08/24/2026S00685799-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026S00685799-P2Open ↗
09/01/2026S00685799-P2Open ↗
08/23/2026S00685799-I1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S00685799-I1Open ↗
08/13/2026S00685799-P2Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/24/2026S00685799-P2Open ↗
08/14/2026S00685799-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00685799-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00685799-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00685799-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00685799-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026S00685799-P2Open ↗
08/13/2026S00685799-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00685799-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00685799-I1Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/13/2026S00685799-P2Open ↗
08/13/2026S00685799-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00685799-P2Open ↗
08/13/2026S00685799-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/24/2026S00685799-P2Open ↗
08/14/2026S00685799-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00685799-I1Open ↗