← Back
Miscellaneous two family
97 MONROE STREET
BROOKLYN · BIN 3057028
💬 Discuss this project
1899Year Built
2Stories
B9Building Class
R6BZoning
2,340 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Miscellaneous two family · Owner of record: BEDSTUY GROUP CAPITAL LLC · 1,800 sf lot · 1.3 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Roof1p · 1 filing · 20 docs
Cellar4p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BROOKLYN B COMPANY GROUP807/08/2026
BEDSTUY GROUP CAPITAL LLC103/22/2026
420 EAST 75 STREET203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/16/2024$1.3M—Private party → BEDSTUY GROUP CAPITAL LLC$573/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CQ&J CORPORATION510/24/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WM ARCH1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
POWER SURGE ELECTRIC, INCElectrical103/22/2026
AB PLUS R CONSTRUCTION INGeneral Contractor104/09/2026
IK MGNT LLCGeneral Contractor107/08/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244310/24/2025
Building Lifecycle
All (48)Filed (5)Permit Issued (3)Signed Off (3)Violation (1)Inspection (6)Special Inspection (30)
05/05/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2026
Signed off — Alteration
INTERIOR RENOVATION ON EXISTING 3-STORY ,2-FAMILY DWELLING UNIT. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01082587-I1
02/12/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/23/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/12/2025
Signed off — Alteration
INTERIOR RENOVATION ON EXISTING 3-STORY ,2-FAMILY DWELLING UNIT. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01082587-S1
12/12/2025
Permit issued — Construction Fence
B01082587-S1-FN
11/24/2025
Signed off — Alteration
INTERIOR RENOVATION ON EXISTING 3-STORY ,2-FAMILY DWELLING UNIT. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01082587-S2
10/27/2025
Special inspection requirement — Permanent certificate
CALVIN TRAN
10/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
10/27/2025
Special inspection requirement — Energy Code Compliance Inspections
CALVIN TRAN
10/27/2025
Special inspection requirement — Insulation placement and R values
CALVIN TRAN
10/27/2025
Special inspection requirement — Fenestration areas
CALVIN TRAN
10/27/2025
Special inspection requirement — Fenestration air leakage
CALVIN TRAN
10/27/2025
Special inspection requirement — Interior lighting power
CALVIN TRAN
10/27/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
CALVIN TRAN
10/27/2025
Special inspection requirement — Metering
CALVIN TRAN
10/24/2025
Filed — Alteration
INTERIOR RENOVATION ON EXISTING 3-STORY ,2-FAMILY DWELLING UNIT. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01082587-P2
10/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
10/16/2025
Special inspection requirement — Fenestration areas
CALVIN TRAN
10/16/2025
Special inspection requirement — Metering
CALVIN TRAN
10/16/2025
Special inspection requirement — Interior lighting power
CALVIN TRAN
10/16/2025
Special inspection requirement — Permanent certificate
CALVIN TRAN
10/16/2025
Special inspection requirement — Insulation placement and R values
CALVIN TRAN
10/16/2025
Special inspection requirement — Fenestration air leakage
CALVIN TRAN
10/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
CALVIN TRAN
10/16/2025
Special inspection requirement — Energy Code Compliance Inspections
CALVIN TRAN
09/29/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/01/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/01/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/01/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/14/2025
Permit issued — Plumbing
B01082587-S2-PL
10/16/2024
Filed — Alteration
INTERIOR RENOVATION ON EXISTING 3-STORY ,2-FAMILY DWELLING UNIT. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01082587-S2
10/16/2024
Filed — Alteration
INTERIOR RENOVATION ON EXISTING 3-STORY ,2-FAMILY DWELLING UNIT. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01082587-P1
10/09/2024
Special inspection requirement — HVAC-R and service water heating system controls
CALVIN TRAN
10/09/2024
Special inspection requirement — Energy Code Compliance Inspections
CALVIN TRAN
10/09/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CALVIN TRAN
10/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
CALVIN TRAN
10/07/2024
Special inspection requirement — Interior lighting power
CALVIN TRAN
10/07/2024
Special inspection requirement — Insulation placement and R values
CALVIN TRAN
10/07/2024
Special inspection requirement — Fenestration air leakage
CALVIN TRAN
10/07/2024
Special inspection requirement — Fenestration areas
CALVIN TRAN
10/07/2024
Special inspection requirement — Energy Code Compliance Inspections
CALVIN TRAN
10/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
10/07/2024
Special inspection requirement — Permanent certificate
CALVIN TRAN
10/07/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
CALVIN TRAN
08/19/2024
Filed — Alteration
INTERIOR RENOVATION ON EXISTING 3-STORY ,2-FAMILY DWELLING UNIT. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01082587-S1
08/16/2024
Permit issued — General Construction
B01082587-I1-GC
08/12/2024
Filed — Alteration
INTERIOR RENOVATION ON EXISTING 3-STORY ,2-FAMILY DWELLING UNIT. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01082587-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offIK MGNT LLC12/12/2025
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC02/14/2025
DOB NOWGeneral ConstructionSigned-offAB PLUS R CONSTRUCTION IN08/16/2024
BISOTISSUEDN/A03/23/1994
2 projects · most recent 03/05/2026
General Wiring
FiledStatusContractorScope
03/05/2026CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
12/12/2025CompletePOWER SURGE ELECTRIC, INC3 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/12/2026Pass-Final General Construction Non-Directive 14PassView ↗
12/23/2025Fail-Final General Construction Non-Directive 14FailView ↗
09/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/01/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/01/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
10/27/2025Permanent certificateCALVIN TRANenergy_progress
10/27/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
10/27/2025Energy Code Compliance InspectionsCALVIN TRANprogress
10/27/2025Insulation placement and R valuesCALVIN TRANenergy_progress
10/27/2025Fenestration areasCALVIN TRANenergy_progress
10/27/2025Fenestration air leakageCALVIN TRANenergy_progress
10/27/2025Interior lighting powerCALVIN TRANenergy_progress
10/27/2025Fenestration and door U-factor and product ratingsCALVIN TRANenergy_progress
10/27/2025MeteringCALVIN TRANenergy_progress
10/16/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
10/16/2025Fenestration areasCALVIN TRANenergy_progress
10/16/2025MeteringCALVIN TRANenergy_progress
10/16/2025Interior lighting powerCALVIN TRANenergy_progress
10/16/2025Permanent certificateCALVIN TRANenergy_progress
10/16/2025Insulation placement and R valuesCALVIN TRANenergy_progress
10/16/2025Fenestration air leakageCALVIN TRANenergy_progress
10/16/2025Fenestration and door U-factor and product ratingsCALVIN TRANenergy_progress
10/16/2025Energy Code Compliance InspectionsCALVIN TRANprogress
10/09/2024HVAC-R and service water heating system controlsCALVIN TRANenergy_progress
10/09/2024Energy Code Compliance InspectionsCALVIN TRANprogress
10/09/2024HVAC-R and service water piping design and insulationCALVIN TRANenergy_progress
10/09/2024HVAC-R and service water heating equipmentCALVIN TRANenergy_progress
10/07/2024Interior lighting powerCALVIN TRANenergy_progress
10/07/2024Insulation placement and R valuesCALVIN TRANenergy_progress
10/07/2024Fenestration air leakageCALVIN TRANenergy_progress
Latest 25 of 31.
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026B01082587-I1Request digital key ↗
08/23/2026B01082587-S1Request digital key ↗
08/23/2026B01082587-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature8
08/31/2026B01082587-S2Open ↗
08/31/2026B01082587-S2Open ↗
08/28/2026B01082587-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/23/2026B01082587-S2Open ↗
08/23/2026B01082587-I1Open ↗
08/23/2026B01082587-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026B01082587-P1Open ↗
08/26/2026B01082587-P2Open ↗
08/23/2026B01082587-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026B01082587-I1Open ↗
08/23/2026B01082587-P2Open ↗
08/23/2026B01082587-S2Open ↗
Showing 3 of 4 on file for this type