← Back
BuildNYC
QUEENS
97 OCEAN AVENUE
QUEENS · BIN 4624922
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone AE
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofBreezy Point CooperativeUnder Construction1p · 1 filing · 15 docs
Floor 3Breezy Point CooperativeUnder Construction1p · 1 filing · 15 docs
Floor 2Breezy Point CooperativeUnder Construction2p · 1 filing · 15 docs
Floor 1Breezy Point CooperativeUnder Construction4p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Breezy Point Cooperative607/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CMC Design Architect212/28/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AC Building Consultants403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sand-Bar ContractorsGeneral Contractor106/02/2026
Joseph O'Grady P & HPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CMC Design Architect2984112/28/2023
Norman C. Lok818112/28/2023
Building Lifecycle
All (32)Filed (2)Permit Issued (2)Inspection (1)Special Inspection (27)
09/29/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/08/2026
Permit issued — Mechanical Systems
Q00970689-I1-GC-CX
05/07/2026
Permit issued — Plumbing
Q00970689-S2-PL
12/28/2023
Filed — New Building
Q00970689-S2
12/28/2023
Filed — New Building
Q00970689-I1
12/28/2023
Special inspection requirement — Electric vehicle service equipment requirements
Gary Lenhart
12/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gary Lenhart
12/28/2023
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Gary Lenhart
12/28/2023
Special inspection requirement — Subgrade Inspections
Gary Lenhart
12/28/2023
Special inspection requirement — Wood – Prefabricated I-Joists
Gary Lenhart
12/28/2023
Special inspection requirement — Interior lighting power
Gary Lenhart
12/28/2023
Special inspection requirement — Insulation placement and R values
Gary Lenhart
12/28/2023
Special inspection requirement — Ventilation and air distribution system
Gary Lenhart
12/28/2023
Special inspection requirement — Concrete - Cast-In-Place
Gary Lenhart
12/28/2023
Special inspection requirement — Energy Code Compliance Inspections
Gary Lenhart
12/28/2023
Special inspection requirement — Fire-Resistance Rated Construction
Gary Lenhart
12/28/2023
Special inspection requirement — Fenestration air leakage
Gary Lenhart
12/28/2023
Special inspection requirement — HVAC-R and service water heating system controls
Gary Lenhart
12/28/2023
Special inspection requirement — Air barrier — testing
Gary Lenhart
12/28/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Gary Lenhart
12/28/2023
Special inspection requirement — Air barrier - visual inspection
Gary Lenhart
12/28/2023
Special inspection requirement — Maintenance information
Gary Lenhart
12/28/2023
Special inspection requirement — Fenestration areas
Gary Lenhart
12/28/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Gary Lenhart
12/28/2023
Special inspection requirement — Metering
Gary Lenhart
12/28/2023
Special inspection requirement — HVAC-R and service water heating equipment
Gary Lenhart
12/28/2023
Special inspection requirement — Permanent certificate
Gary Lenhart
12/28/2023
Special inspection requirement — Duct leakage testing, insulation and design
Gary Lenhart
12/01/2023
Special inspection requirement — Mechanical Systems
Gary Lenhart
12/01/2023
Special inspection requirement — Lowest Floor Elevation
Gary Lenhart
12/01/2023
Special inspection requirement — Footing and Foundation
Gary Lenhart
12/01/2023
Special inspection requirement — Final
Gary Lenhart
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedSand-Bar Contractors05/08/2026
DOB NOWPlumbingPermit IssuedJoseph O'Grady P & H05/07/2026
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/29/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
12/28/2023Electric vehicle service equipment requirementsGary Lenhartenergy_progress
12/28/2023Fire-Resistant Penetrations and JointsGary Lenhartspecial
12/28/2023Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Gary Lenhartspecial
12/28/2023Subgrade InspectionsGary Lenhartspecial
12/28/2023Wood – Prefabricated I-JoistsGary Lenhartspecial
12/28/2023Interior lighting powerGary Lenhartenergy_progress
12/28/2023Insulation placement and R valuesGary Lenhartenergy_progress
12/28/2023Ventilation and air distribution systemGary Lenhartenergy_progress
12/28/2023Concrete - Cast-In-PlaceGary Lenhartspecial
12/28/2023Energy Code Compliance InspectionsGary Lenhartprogress
12/28/2023Fire-Resistance Rated ConstructionGary Lenhartprogress
12/28/2023Fenestration air leakageGary Lenhartenergy_progress
12/28/2023HVAC-R and service water heating system controlsGary Lenhartenergy_progress
12/28/2023Air barrier — testing Gary Lenhartenergy_progress
12/28/2023Fenestration and door U-factor and product ratingsGary Lenhartenergy_progress
12/28/2023Air barrier - visual inspectionGary Lenhartenergy_progress
12/28/2023Maintenance informationGary Lenhartenergy_progress
12/28/2023Fenestration areasGary Lenhartenergy_progress
12/28/2023HVAC-R and service water piping design and insulationGary Lenhartenergy_progress
12/28/2023MeteringGary Lenhartenergy_progress
12/28/2023HVAC-R and service water heating equipmentGary Lenhartenergy_progress
12/28/2023Permanent certificateGary Lenhartenergy_progress
12/28/2023Duct leakage testing, insulation and designGary Lenhartenergy_progress
12/01/2023Mechanical SystemsGary Lenhartspecial
12/01/2023Lowest Floor ElevationGary Lenhartprogress
Latest 25 of 27.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Breezy Point CooperativeResidentialFloors 1–3
Project Q00970689 New Building · Permit Entire · 12/28/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026Q00970689-I1Request digital key ↗
08/23/2026Q00970689-S2Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00970689-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q00970689-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWSpecial Inspector Seal & Signature3
09/05/2026Q00970689-I1Open ↗
09/05/2026Q00970689-I1Open ↗
09/05/2026Q00970689-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/05/2026Q00970689-I1Open ↗
09/05/2026Q00970689-I1Open ↗
09/05/2026Q00970689-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/23/2026Q00970689-I1Open ↗
08/23/2026Q00970689-S2Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026Q00970689-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q00970689-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/23/2026Q00970689-I1Open ↗