← Back
Over six families without stores
970 ANDERSON AVENUE
BRONX · BIN 2003046
💬 Discuss this project
1909Year Built
5Stories
C1Building Class
R7-1Zoning
12,160 sfGross Floor Area
9Units
Rent Stabilized5 Open Violations 3 unresolved · 2 paperwork only ▸
Over six families without stores · Owner of record: MBD NEW HEIGHTS APTS HOUSING DEV. FUND C O., INC. · 4,619 sf lot · 2.63 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof9p · 4 filings · 20 docs
Bulkhead1p · 1 filing · 4 docs
Floor 22p · 1 filing · 4 docs
Floor 14p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MBD COMMUNITY HOUSING CORP.1303/22/2026
MBD NEW HEIGHTS APTS HOUSING DEV. FUND C O., INC.103/22/2026
HOUSING PRESERVATION AND DEV.403/22/2026
HPD103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROSENTHAL ENGINEERING PLLC801/23/2025
STAT ARCHITECTURE PC206/14/2024
JOEL PHAGOO P.E. PLLC103/30/2023
OLD STRUCTURES ENGINEERING, P.C.103/09/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING2203/21/2026
A1 EXPEDITING SERVICE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NOTIAS CONSTRUCTION INCGeneral Contractor607/08/2026
AKM CONSTRUCTION NY CORPGeneral Contractor203/21/2026
J-J PLUMBING CORPPlumbing207/08/2026
DELTEX ELECTRICAL CONT. IElectrical103/22/2026
VINCENT LOGOZZOElectrical103/21/2026
PEREIRA, EURIPEDESElectrical103/21/2026
THORNE, LAWRENCEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONCRETE SOLUTIONS LAB CO5344701/23/2025
Building Lifecycle
All (142)Filed (12)Permit Issued (7)Signed Off (4)Violation (60)Inspection (5)Objection (24)Special Inspection (30)
04/29/2026
Violation issued (HPD, open)
A
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/07/2025
Violation issued (HPD, closed)
B
10/07/2025
Violation issued (HPD, closed)
C
10/07/2025
Violation issued (HPD, closed)
B
10/07/2025
Violation issued (HPD, closed)
C
10/07/2025
Violation issued (HPD, closed)
C
10/07/2025
Violation issued (HPD, closed)
B
03/10/2025
Signed off — Alteration
EXTERIOR REPAIR WORK FOR EXISTING ROOF & FACADES, MINOR INTERIOR APARTMENTS RENOVATION. NEW FLOORING AT LOBBY & HALLWAYS PER PLAN. NO CHANGE USE, EGRESS AND OCCUPANCY OF THE EXISTING BUILDING.
X08002374-S2
03/10/2025
Signed off — Alteration
EXTERIOR REPAIR WORK FOR EXISTING ROOF & FACADES, MINOR INTERIOR APARTMENTS RENOVATION. NEW FLOORING AT LOBBY & HALLWAYS PER PLAN. NO CHANGE USE, EGRESS AND OCCUPANCY OF THE EXISTING BUILDING.
X08002374-S1
03/07/2025
Signed off — Alteration
EXTERIOR REPAIR WORK FOR EXISTING ROOF & FACADES, MINOR INTERIOR APARTMENTS RENOVATION. NEW FLOORING AT LOBBY & HALLWAYS PER PLAN. NO CHANGE USE, EGRESS AND OCCUPANCY OF THE EXISTING BUILDING.
X08002374-I1
02/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
02/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
MINA HANNA
02/03/2025
Special inspection requirement — Final
MINA HANNA
02/03/2025
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
02/03/2025
Special inspection requirement — Mechanical Systems
MINA HANNA
01/29/2025
Violation issued (HPD, closed)
B
01/29/2025
Violation issued (HPD, closed)
C
01/29/2025
Violation issued (HPD, closed)
C
01/29/2025
Violation issued (HPD, closed)
C
01/29/2025
Violation issued (HPD, closed)
B
01/29/2025
Violation issued (HPD, closed)
A
01/29/2025
Violation issued (HPD, closed)
C
01/29/2025
Violation issued (HPD, closed)
C
01/23/2025
Filed — Alteration
EXTERIOR REPAIR WORK FOR EXISTING ROOF & FACADES, MINOR INTERIOR APARTMENTS RENOVATION. NEW FLOORING AT LOBBY & HALLWAYS PER PLAN. NO CHANGE USE, EGRESS AND OCCUPANCY OF THE EXISTING BUILDING.
X08002374-P4
01/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
MINA HANNA
01/16/2025
Special inspection requirement — Final
MINA HANNA
01/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
01/16/2025
Special inspection requirement — Mechanical Systems
MINA HANNA
01/16/2025
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
01/10/2025
Violation issued (HPD, closed)
A
01/10/2025
Violation issued (HPD, closed)
A
01/10/2025
Violation issued (HPD, closed)
A
01/10/2025
Violation issued (HPD, closed)
A
01/10/2025
Violation issued (HPD, closed)
C
01/10/2025
Violation issued (HPD, closed)
A
01/10/2025
Violation issued (HPD, closed)
A
01/10/2025
Violation issued (HPD, closed)
A
12/11/2024
Permit issued — General Construction
X08002374-I1-GC
10/17/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/17/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/06/2024
Violation issued (HPD, closed)
A
06/28/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
MINA HANNA
06/28/2024
Special inspection requirement — Fenestration air leakage
MINA HANNA
06/28/2024
Special inspection requirement — Air barrier - visual inspection
MINA HANNA
06/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
06/28/2024
Special inspection requirement — Fire-Resistance Rated Construction
MINA HANNA
06/28/2024
Special inspection requirement — Final
MINA HANNA
06/28/2024
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
06/28/2024
Special inspection requirement — Insulation placement and R values
MINA HANNA
06/25/2024
Objection resolved — Addressed
06/24/2024
Permit issued — Mechanical Systems
X08002374-S2-MS
06/20/2024
Objection raised — Other
06/14/2024
Filed — Alteration
EXTERIOR REPAIR WORK FOR EXISTING ROOF & FACADES, MINOR INTERIOR APARTMENTS RENOVATION. NEW FLOORING AT LOBBY & HALLWAYS PER PLAN. NO CHANGE USE, EGRESS AND OCCUPANCY OF THE EXISTING BUILDING.
X08002374-P3
05/28/2024
Permit issued — Plumbing
X08002374-S1-PL
02/06/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
01/15/2024
Filed — Alteration
EXTERIOR REPAIR WORK FOR EXISTING ROOF & FACADES, MINOR INTERIOR APARTMENTS RENOVATION. NEW FLOORING AT LOBBY & HALLWAYS PER PLAN. NO CHANGE USE, EGRESS AND OCCUPANCY OF THE EXISTING BUILDING.
X08002374-P2
01/05/2024
Signed off — Alteration
X00814893-I1
Latest 60 of 142 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNOTIAS CONSTRUCTION INC12/11/2024
DOB NOWMechanical SystemsSigned-offNOTIAS CONSTRUCTION INC06/24/2024
DOB NOWPlumbingSigned-offJ-J PLUMBING CORP05/28/2024
DOB NOWPlumbingSigned-offJ-J PLUMBING CORP06/26/2023
DOB NOWGeneral ConstructionSigned-offNOTIAS CONSTRUCTION INC06/20/2023
DOB NOWMechanical SystemsSigned-offNOTIAS CONSTRUCTION INC06/20/2023
DOB NOWSidewalk ShedSigned-offAKM CONSTRUCTION NY04/05/2023
BISPLISSUEDKINGS PLAZA P & H INC05/07/2016
BISBLISSUEDKINGS PLAZA P & H INC05/07/2016
BISBLISSUEDKINGS PLAZA P & H INC09/29/2014
BISPLISSUEDKINGS PLAZA P & H INC09/29/2014
BISEQISSUEDHES CONTRACTING CORP12/19/2000
BISOTISSUEDHES CONTRACTING CORP12/19/2000
BISEQISSUEDATLANTIC SCAFFOLDING04/28/1997
3 projects · most recent 10/27/2025
FiledStatusContractorScope
10/27/2025Permit IssuedABILENE ELECTRIC INC—
01/18/2023Permit IssuedHIGH QUALITY ELECTRIC OF—
12/19/2018CompleteDELTEX ELECTRICAL CONT. I—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/17/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/17/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/06/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
02/03/2025Fire-Resistant Penetrations and JointsMINA HANNAspecial
02/03/2025HVAC-R and service water heating system controlsMINA HANNAenergy_progress
02/03/2025FinalMINA HANNAprogress
02/03/2025Energy Code Compliance InspectionsMINA HANNAprogress
02/03/2025Mechanical SystemsMINA HANNAspecial
01/16/2025HVAC-R and service water heating system controlsMINA HANNAenergy_progress
01/16/2025FinalMINA HANNAprogress
01/16/2025Fire-Resistant Penetrations and JointsMINA HANNAspecial
01/16/2025Mechanical SystemsMINA HANNAspecial
01/16/2025Energy Code Compliance InspectionsMINA HANNAprogress
06/28/2024Fenestration and door U-factor and product ratingsMINA HANNAenergy_progress
06/28/2024Fenestration air leakageMINA HANNAenergy_progress
06/28/2024Air barrier - visual inspectionMINA HANNAenergy_progress
06/28/2024Fire-Resistant Penetrations and JointsMINA HANNAspecial
06/28/2024Fire-Resistance Rated ConstructionMINA HANNAprogress
06/28/2024FinalMINA HANNAprogress
06/28/2024Energy Code Compliance InspectionsMINA HANNAprogress
06/28/2024Insulation placement and R valuesMINA HANNAenergy_progress
01/18/2024Fire-Resistant Penetrations and JointsMINA HANNAspecial
08/22/2023Fire-Resistant Penetrations and JointsMINA HANNAspecial
01/13/2021Heating Systems—special
01/13/2021HVAC and service water heating equipment —energy_progress
01/13/2021Maintenance information—energy_progress
01/13/2021Shutoff dampers—energy_progress
01/13/2021HVAC and service water heating system controls —energy_progress
Latest 25 of 38.
▾Documents — 107 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch8
08/23/2026X00814893-I1Request digital key ↗
08/21/2026X08002374-S1Request digital key ↗
08/21/2026X08002374-P4Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Structural1
08/25/2026X00407809-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
08/25/2026X00402096-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/25/2026X00402080-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/25/2026X00402075-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/25/2026X00402080-I1Request digital key ↗
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION10
05/12/2022210181578Open ↗
12/22/2020210181578Open ↗
10/30/2020210181578Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION2
09/29/2014220392475Open ↗
09/29/2014220392475Open ↗
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026X08002374-I1Open ↗
09/01/2026X08002374-I1Open ↗
09/01/2026X08002374-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/25/2026X00407809-I1Open ↗
08/23/2026X00814893-I1Open ↗
08/21/2026X08002374-P4Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026X08002374-I1Open ↗
09/01/2026X08002374-S1Open ↗
08/29/2026X08002374-S2Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
09/23/2014220392475Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
09/23/2014220392475Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
09/23/2014220392475Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
09/25/2020210181578Open ↗
09/23/2014220392475Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/21/2026X08002374-S1Open ↗
08/15/2026X08002374-I1Open ↗
08/15/2026X08002374-S2Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/23/2014220392475Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/23/2014220392475Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/25/2020210181578Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/25/2020210181578Open ↗
▸Approvals, Objections & Sign-offs30
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/25/2026X00407809-I1Open ↗
08/23/2026X00814893-I1Open ↗
08/13/2026X08002374-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)8
08/13/2026X08002374-P4Open ↗
08/13/2026X08002374-P2Open ↗
08/13/2026X08002374-S1Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
10/29/2020210181578Open ↗
09/25/2020210181578Open ↗
09/25/2020210181578Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
10/23/2020210181578Open ↗
10/22/2020210181578Open ↗
09/16/2020210181578Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026X00402096-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/22/2020210181578Open ↗
09/23/2014220392475Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION2
12/22/2020210181578Open ↗
09/25/2020210181578Open ↗
▸BISEFILING COVER SHEET2
06/05/2020210181578Open ↗
09/23/2014220392475Open ↗
▸DOB NOWAI1 and HPD1
08/13/2026X00402075-I1Open ↗
▸Other Documents1
▸DOB NOWAdditional documet1
08/13/2026X00402080-I1Open ↗