RoofUnder Construction1p · 1 filing · 2 docs
Structural
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
On file for this project
2 documents · 1 drawing sheet
Bulkhead1p · 1 filing · 5 docs
Architecture
APPLICATION FILED FOR EXTERIOR RENOVATION OF EXISTING STORE FRONT AND FACADE ON THE 1ST FLOOR AND THE MEZZANINE (INTERMEDIATE) LEVEL FOR STORE (DIPTYQUE) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents · 1 drawing sheet
Floor 15Under Construction17p · 1 filing · 20 docs
ArchitectureElectricalMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
REPLACE PL FXTR W/ NEW @ EXISTING ROUGHING (1SINK,1DW,1WC)@ 15TH &(1SHOWER,1LAV,2WC,1TUB)@ 14TH. RELOCATE PL FXTR W/ NEW (1 LAV)@ 15TH & (2LAV,1SHOWER)@ 14TH. CAP &REMOVE FXTR (1 SINK,1 SHOWER,1 W/M)@ 15TH. INSTALL NEW PL FXTR (1 W/M,1SHOWER,1 WC,1 LAV)14
On file for this project
44 documents · 5 drawing sheets
Floor 14Under Construction18p · 1 filing · 20 docs
ArchitectureDMMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
REPLACE PL FXTR W/ NEW @ EXISTING ROUGHING (1SINK,1DW,1WC)@ 15TH &(1SHOWER,1LAV,2WC,1TUB)@ 14TH. RELOCATE PL FXTR W/ NEW (1 LAV)@ 15TH & (2LAV,1SHOWER)@ 14TH. CAP &REMOVE FXTR (1 SINK,1 SHOWER,1 W/M)@ 15TH. INSTALL NEW PL FXTR (1 W/M,1SHOWER,1 WC,1 LAV)14
On file for this project
44 documents · 6 drawing sheets
Floor 13
Floor 121p · 1 filing · 7 docs
Architecture
Issued Permit Scope
General Construction
Obtain DOB approval for unit 12AB. Scope of work: general construction. No change in use, egress, or occupancy.
On file for this project
7 documents
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 615p · 3 filings · 15 docs
ArchitectureDMMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES TO THE 6TH FLOOR (APA AESTHETICS) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
5 documents · 1 drawing sheet
APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 6TH FLOOR (APA AESTHETICS) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents
APPLICATION FILED FOR PLUMBING MODIFICATIONS/ADDITIONS ON THE 6TH FLOOR (APA AESTHETICS) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents
Floor 5Under Construction18p · 4 filings · 20 docs
ArchitectureDMMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
APPLICATION FILED FOR PLUMBING ADDITIONS/MODIFICATIONS ON THE 5TH FLOOR (APA) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
14 documents · 4 drawing sheets
APPLICATION FILED FOR PLUMBING MODIFICATIONS/ADDITIONS ON THE 5TH FLOOR (APA AESTHETICS) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 5TH FLOOR (APA AESTHETICS) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 4
Floor 3Under Construction16p · 1 filing · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Modification to existing mechanical system as shown on drawings.
On file for this project
26 documents · 2 drawing sheets
Floor 26p · 1 filing · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
AN EXISTING MIXED USE BUILDING WITH INTERIOR RENOVATION AT A BEAUTY SALON ON PARTIAL OF 2ND FLOOR. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
On file for this project
23 documents
Floor 160p · 8 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 1ST FLOOR AND THE MEZZANINE (INTERMEDIATE) FOR STORE (DIPTYQUE) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents · 1 drawing sheet
APPLICATION FILED FOR STRUCTURAL MODIFICATIONS/ADDITIONS ON THE 1ST FLOOR AND THE MEZZANINE (INTERMEDIATE) FOR STORE (DIPTYQUE) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 1 drawing sheet
APPLICATION FILED FOR PLUMBING MODIFICATIONS/ADDITIONS ON THE 1ST FLOOR AND THE MEZZANINE (INTERMEDIATE) FOR STORE (DIPTYQUE) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Mezzanine47p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 1ST FLOOR AND THE MEZZANINE (INTERMEDIATE) FOR STORE (DIPTYQUE) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents
APPLICATION FILED FOR STRUCTURAL MODIFICATIONS/ADDITIONS ON THE 1ST FLOOR AND THE MEZZANINE (INTERMEDIATE) FOR STORE (DIPTYQUE) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 1 drawing sheet
APPLICATION FILED FOR PLUMBING MODIFICATIONS/ADDITIONS ON THE 1ST FLOOR AND THE MEZZANINE (INTERMEDIATE) FOR STORE (DIPTYQUE) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents
Latest 3 of 7 filings on this floor.
CellarUnder Construction4p · 1 filing · 16 docs
ArchitectureLandscapeMechanicalPlumbing
Issued Permit Scope
Boiler Equipment · General Construction · Plumbing
NEW HIGH PRESSURE GAS SERVICE, METER & REDUCING STATION. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
On file for this project
16 documents · 1 drawing sheet
Sub-CellarUnder Construction5p · 1 filing · 16 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Plumbing
NEW HIGH PRESSURE GAS SERVICE, METER & REDUCING STATION. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
On file for this project
16 documents · 2 drawing sheets
Site & exterior2p · 1 filing · 3 docs
ElectricalFire Alarm
Issued Permit Scope
Construction Fence
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
3 documents · 2 drawing sheets