← Back
Two family frame
971 RAMONA AVENUE
STATEN ISLAND · BIN 5085584
💬 Discuss this project
1984Year Built
2Stories
B2Building Class
R3-1Zoning
2,400 sfGross Floor Area
2Units
Two family frame · 5,000 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 24p · 2 filings · 20 docs
Floor 1
Cellar5p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DAWN PONISI403/21/2026
CHRIS PONISI ARCHITECT403/21/2026
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Z N J CONSTRUCTION INCGeneral Contractor1607/08/2026
A & E MECHANICAL CORPPlumbing207/08/2026
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272111/04/2025
A TECH ENGINEERING NYC, P6738512/06/2023
Building Lifecycle
All (54)Filed (7)Permit Issued (9)Signed Off (5)Inspection (3)Special Inspection (30)
01/15/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01308595-I1
11/14/2025
Permit issued — Solar
S01308595-I1-SL
11/04/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01308595-I1
11/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
10/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
10/24/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
10/24/2025
Special inspection requirement — Final
Walid Abdulla
10/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
06/21/2024
Signed off — Alteration
PROVIDE AND INSTALL HEATING, COOLING AND VENTILATION SYSTEM FOR RENOVATED TWO FAMILY HOUSE PER SUBMITTED PLANS
S08048469-I1
02/16/2024
Signed off — Alteration
APPLICATION FILED FOR PLUMBING WORK IN CONJUNCTION WITH S08048569-I1
S08048569-I1
02/15/2024
Permit issued — General Construction
S08048569-I1-FO
02/15/2024
Permit issued — General Construction
S08048569-I1-ST
02/13/2024
Permit issued — Mechanical Systems
S08048469-I1-MS
12/29/2023
Special inspection requirement — Duct leakage testing, insulation and design
anthony santoro
12/29/2023
Special inspection requirement — Heating Systems
anthony santoro
12/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
12/29/2023
Special inspection requirement — Mechanical Systems
anthony santoro
12/29/2023
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
12/29/2023
Special inspection requirement — Final
anthony santoro
12/29/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
12/29/2023
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
12/29/2023
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
12/15/2023
Signed off — Alteration
APPLICATION FILED FOR PLUMBING WORK IN CONJUNCTION WITH S08048569-I1
S08048569-S1
12/06/2023
Filed — Alteration
PROVIDE AND INSTALL HEATING, COOLING AND VENTILATION SYSTEM FOR RENOVATED TWO FAMILY HOUSE PER SUBMITTED PLANS
S08048469-P1
11/30/2023
Special inspection requirement — Mechanical Systems
anthony santoro
11/30/2023
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
11/30/2023
Special inspection requirement — Final
anthony santoro
11/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
11/30/2023
Special inspection requirement — Duct leakage testing, insulation and design
anthony santoro
11/30/2023
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
11/30/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
11/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
11/30/2023
Special inspection requirement — Heating Systems
anthony santoro
11/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
11/13/2023
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
11/13/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
11/13/2023
Special inspection requirement — Permanent certificate
anthony santoro
11/13/2023
Special inspection requirement — Metering
anthony santoro
11/13/2023
Special inspection requirement — Maintenance information
anthony santoro
11/13/2023
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
11/09/2023
Filed — Alteration
APPLICATION FILED FOR PLUMBING WORK IN CONJUNCTION WITH S08048569-I1
S08048569-P1
11/02/2023
Permit issued — Mechanical Systems
S08048469-I1-MS
11/02/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/26/2023
Signed off — Alteration
APPLICATION FILED FOR TEMPORARY CONSTRUCTION FENCE
S00826496-I1
07/25/2023
Permit issued — Plumbing
S08048569-S1-PL
04/07/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/07/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/27/2023
Permit issued — Plumbing
S08048569-S1-PL
02/24/2023
Permit issued — Foundation
S08048569-I1-GC
02/20/2023
Filed — Alteration
APPLICATION FILED FOR PLUMBING WORK IN CONJUNCTION WITH S08048569-I1
S08048569-S1
02/17/2023
Filed — Alteration
APPLICATION FILED FOR PLUMBING WORK IN CONJUNCTION WITH S08048569-I1
S08048569-I1
02/14/2023
Permit issued — Construction Fence
S00826496-I1-FN
02/13/2023
Filed — Alteration
PROVIDE AND INSTALL HEATING, COOLING AND VENTILATION SYSTEM FOR RENOVATED TWO FAMILY HOUSE PER SUBMITTED PLANS
S08048469-I1
02/13/2023
Filed — Alteration
APPLICATION FILED FOR TEMPORARY CONSTRUCTION FENCE
S00826496-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC11/14/2025
DOB NOWGeneral ConstructionPermit IssuedZ N J CONSTRUCTION INC02/15/2024
DOB NOWGeneral ConstructionPermit IssuedZ N J CONSTRUCTION INC02/15/2024
DOB NOWMechanical SystemsSigned-offZ N J CONSTRUCTION INC02/13/2024
DOB NOWMechanical SystemsSigned-offZ N J CONSTRUCTION INC11/02/2023
DOB NOWPlumbingSigned-offA & E MECHANICAL CORP07/25/2023
DOB NOWPlumbingSigned-offA & E MECHANICAL CORP03/27/2023
DOB NOWFoundationSigned-offZ N J CONSTRUCTION INC02/24/2023
DOB NOWConstruction FenceSigned-offZ N J CONSTRUCTION INC02/14/2023
2 projects · most recent 11/04/2025
General Wiring
FiledStatusContractorScope
11/04/2025CompleteSUNRUN SOLAR ELECTL CORP—
09/05/2023CompleteCONTROL ELEC'L CONT'G CORGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/02/2023Pass-Final General Construction Non-Directive 14PassView ↗
04/07/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
11/04/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/24/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/24/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
10/24/2025FinalWalid Abdullaprogress
10/24/2025Energy Code Compliance InspectionsWalid Abdullaprogress
12/29/2023Duct leakage testing, insulation and designanthony santoroenergy_progress
12/29/2023Heating Systemsanthony santorospecial
12/29/2023Fire-Resistant Penetrations and Jointsanthony santorospecial
12/29/2023Mechanical Systemsanthony santorospecial
12/29/2023Energy Code Compliance Inspectionsanthony santoroprogress
12/29/2023Finalanthony santoroprogress
12/29/2023HVAC-R and service water piping design and insulationanthony santoroenergy_progress
12/29/2023HVAC-R and service water heating equipmentanthony santoroenergy_progress
12/29/2023HVAC-R and service water heating system controlsanthony santoroenergy_progress
11/30/2023Mechanical Systemsanthony santorospecial
11/30/2023Energy Code Compliance Inspectionsanthony santoroprogress
11/30/2023Finalanthony santoroprogress
11/30/2023HVAC-R and service water heating equipmentanthony santoroenergy_progress
11/30/2023Duct leakage testing, insulation and designanthony santoroenergy_progress
11/30/2023HVAC-R and service water heating system controlsanthony santoroenergy_progress
11/30/2023HVAC-R and service water piping design and insulationanthony santoroenergy_progress
11/30/2023Fire-Resistant Penetrations and Jointsanthony santorospecial
11/30/2023Heating Systemsanthony santorospecial
11/13/2023Fire-Resistant Penetrations and Jointsanthony santorospecial
11/13/2023HVAC-R and service water heating equipmentanthony santoroenergy_progress
Latest 25 of 39.
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026S00826496-I1Request digital key ↗
08/23/2026S08048569-P1Request digital key ↗
08/23/2026S08048569-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature11
08/29/2026S08048469-P1Open ↗
08/29/2026S08048469-P1Open ↗
08/28/2026S01308595-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/23/2026S08048569-P1Open ↗
08/23/2026S08048569-S1Open ↗
08/23/2026S08048569-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/29/2026S08048469-P1Open ↗
08/28/2026S01308595-I1Open ↗
08/28/2026S01308595-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/23/2026S08048569-P1Open ↗
08/23/2026S08048569-S1Open ↗
08/23/2026S08048569-I1Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01308595-I1Open ↗