← Back
Three families
972 BAY RIDGE PARKWAY
BROOKLYN · Dyker Heights · BIN 3148955
💬 Discuss this project
1930Year Built
2Stories
C0Building Class
R4-1Zoning
2,160 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · 2,550 sf lot · 0.85 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Permit Issued — active, not yet Signed-off
Floor 2Under Construction2p · 1 filing · 8 docs
Floor 1Under Construction2p · 1 filing · 8 docs
CellarUnder Construction2p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW AIR SOLUTION INC.210/27/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WELLDONE INSPECTIONS INCGeneral Contractor104/09/2026
Building Lifecycle
All (16)Filed (2)Permit Issued (1)Violation (10)Special Inspection (3)
05/01/2026
Violation issued (HPD, closed)
A
10/28/2025
Permit issued — General Construction
B01308784-I1-GC
10/27/2025
Filed — Alteration
Interior renovation including new partition work at the cellar, first, and second floors of an existing two-family dwelling. No change in use, egress, or occupancy.
B01308784-I1
10/27/2025
Filed — Alteration
Interior renovation including new partition work at the cellar, first, and second floors of an existing two-family dwelling. No change in use, egress, or occupancy.
B01308784-S1
10/26/2025
Special inspection requirement — Energy Code Compliance Inspections
zhixin deng
10/26/2025
Special inspection requirement — Final
zhixin deng
10/26/2025
Special inspection requirement — Energy Code Compliance Inspections
zhixin deng
06/06/2025
Violation issued (HPD, closed)
A
11/29/2024
Violation issued (HPD, closed)
I
04/08/2024
Violation issued (HPD, closed)
A
03/21/2023
Violation issued (HPD, closed)
A
02/22/2022
Violation issued (HPD, closed)
A
04/06/2021
Violation issued (HPD, closed)
A
10/29/2019
Violation issued (HPD, closed)
I
10/07/2015
Violation issued (HPD, closed)
I
02/17/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedWELLDONE INSPECTIONS INC10/28/2025
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
10/26/2025Energy Code Compliance Inspectionszhixin dengprogress
10/26/2025Finalzhixin dengprogress
10/26/2025Energy Code Compliance Inspectionszhixin dengprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026B01308784-S1Request digital key ↗
08/20/2026B01308784-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/20/2026B01308784-S1Open ↗
08/20/2026B01308784-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026B01308784-I1Open ↗
08/26/2026B01308784-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/20/2026B01308784-S1Open ↗
08/20/2026B01308784-I1Open ↗