← Back
BuildNYC
Elevator apt, semi-fireproof without stores
974 SHERIDAN AVENUE
BRONX · BIN 2002710
💬 Discuss this project
1927Year Built
6Stories
D1Building Class
R7-1Zoning
47,538 sfGross Floor Area
49Units
LL97 CoveredRent Stabilized268 Active Violations 266 unresolved · 2 paperwork only ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: NYC Capital Value Fund II · 10,813 sf lot · 4.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 6Langsam Property Services3p · 2 filings · 14 docs
Floor 5Langsam Property Services3p · 2 filings · 14 docs
Floor 4Langsam Property Services3p · 2 filings · 14 docs
Floor 3Langsam Property Services3p · 2 filings · 14 docs
Floor 2Langsam Property Services3p · 2 filings · 14 docs
Floor 1Langsam Property Services3p · 3 filings · 17 docs
CellarLangsam Property Services3p · 2 filings · 14 docs
Site & exteriorHeavy duty sidewalk shedUnder Construction6p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Capital Value Fundii1203/22/2026
NYC Department of Housing Preservation and Development103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Colombo Architectural Studio304/16/2026
AP Professional Engineering109/16/2024
Syed Engineering107/09/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Expediting103/21/2026
Frank Bueno Expediting403/21/2026
Sandeep Kaur103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Coast GroupScaffold409/25/2026
Harley Plumbing & Heatingspecialty_contractor107/03/2026
Harley Plumbing & HeatingPlumbing107/08/2026
5 Boro's PlumbingPlumbing105/22/2017
A & C Heating ServicesPlumbing107/16/2013
A. L. Eastmond & SonsGeneral Contractor108/08/2007
Honor ConstructionGeneral Contractor105/22/2017
OZ Bosph ConstructionGeneral Contractor107/26/2017
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Joseph Botta, PE1139404/16/2026
Building Lifecycle
09/24/2026
Permit renewed — Sidewalk Shed
Renewed without changes
X01090005-I1-SH
09/12/2026
Ftm bldg exterior facade & appurtances. EXP2N,3E,4S,masonry facade was partially detached with bulging separation appox 3"from bldg & danger of…
DOB violation · open
08/06/2026
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR…
HPD violation · open
08/06/2026
§ 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT ALL PLUMBING FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th…
HPD violation · open
08/06/2026
§ 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES AT ALL PLUMBING FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th…
HPD violation · open
218 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedCoast Group09/24/2026
DOB NOWSidewalk ShedPermit IssuedCoast Group09/11/2025
DOB NOWSidewalk ShedPermit IssuedCoast Group09/19/2024
DOB NOWPlumbingSigned-offHarley Plumbing & Heating08/27/2024
DOB NOWGeneral ConstructionSigned-offHarley Plumbing & Heating08/26/2024
BISOTISSUEDOZ Bosph Construction07/26/2017
BISPLISSUEDZone Plumbing & Heating05/22/2017
BISOTISSUEDHonor Construction05/22/2017
BISPLISSUEDA & C Heating Services07/16/2013
BISFSISSUEDA&C Heating Services12/20/2012
BISOTISSUEDA. L. Eastmond & Sons08/08/2007
2 projects · most recent 08/09/2024
FiledStatusContractorScope
08/09/2024Permit IssuedHigh Quality Electric—
07/08/2020Permit IssuedRichard Neu—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/18/2025Fail-Final General Construction Non-Directive 14FailView ↗
07/03/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/24/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/28/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/15/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/11/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/28/2026Tenant Protection Plan ComplianceJOSEPH BOTTAspecial
04/28/2026Fire-Resistant Penetrations and JointsJOSEPH BOTTAspecial
09/19/2025Fire-Resistant Penetrations and JointsJOSEPH BOTTAspecial
09/19/2025Tenant Protection Plan Compliance—special
06/14/2024Tenant Protection Plan ComplianceJOSEPH BOTTAspecial
106 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account