← Back
Elevator apt, semi-fireproof without stores
9747 SHORE ROAD
BROOKLYN · BIN 3155912
💬 Discuss this project
1935Year Built
6Stories
D1Building Class
R7AZoning
71,346 sfGross Floor Area
60Units
LL97 CoveredRent Stabilized7 Open Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: BRIDGEVIEW ASSOC LLC · 16,600 sf lot · 4.3 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 313p · 1 filing · 13 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
APEX GROUP NY407/08/2026
T-MOBILE407/08/2026
BRIDGEVIEW ASSOC1203/22/2026
BRIDGEVIEW ASSOC LLC / DI303/22/2026
ROCK GROUP NY103/22/2026
MCFAR CONTRACTING INC103/22/2026
MC FAR CONTRACTORS103/22/2026
SHORELINE ARMS OWNER C303/22/2026
DITMAS MANAGEMENT703/22/2026
P.J.B. CONTRACTING INC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES203/21/2026
JENNY FLORES EXPEDITING703/21/2026
SANDEEP KAUR103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
REAL DEAL DECORATION LLCGeneral Contractor307/08/2026
CARRERAS HOME IMPROV INCPlumbing207/08/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
APEX GROUP NY CORPGeneral Contractor107/08/2026
SYED-NAQVI ALTAFElectrical103/21/2026
WATCH HILL WIRELESS SOLUGeneral Contractor107/08/2026
ADVANCED PLUMBING MECHPlumbing107/08/2026
IRVING BAPTISTEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A2 ARCHITECT, PC2504907/23/2026
PARTRIDGE VENTURE ENGINEE7690408/02/2024
MOORE ASSOCIATES, LLC3408208/09/2023
GRANT ENGINEERING CONSULT3512208/01/2023
Building Lifecycle
All (109)Filed (14)Permit Issued (7)Signed Off (3)Violation (60)Inspection (12)Special Inspection (13)
07/23/2026
Filed — Alteration
HEREBY FILING FOR THE INTERIOR RENOVATION OF EXISTING APARTMENT #D4, LOCATED ON THE FOURTH FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B01428134-I1
07/23/2026
Filed — Alteration
HEREBY FILING FOR THE INTERIOR RENOVATION OF EXISTING APARTMENT #D4, LOCATED ON THE FOURTH FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B01428134-S1
07/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
07/08/2026
Special inspection requirement — Tenant Protection Plan Compliance
12/01/2025
Violation issued (HPD, closed)
C
12/01/2025
Violation issued (HPD, closed)
C
10/13/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/13/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/20/2025
Filed — Alteration
HEREBY FILING FOR THE INTERIOR RENOVATION OF EXISTING APARTMENT #C7 LOCATED ON THE THIRD FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B01079562-P2
08/20/2025
Filed — Alteration
HEREBY FILING FOR THE REMOVAL, REPLACEMENT AND INSTALLATION OF FIXTURES IN APARTMENT #F9 LOCATED ON THE SIXTH FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B01079475-P1
08/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
08/20/2025
Special inspection requirement — Tenant Protection Plan Compliance
David Sivin
08/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
08/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/08/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/13/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/09/2024
Filed — Alteration
HEREBY FILING FOR THE INTERIOR RENOVATION OF EXISTING APARTMENT #C7 LOCATED ON THE THIRD FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B01079562-P1
09/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/14/2024
Permit issued — Plumbing
B01079475-S1-PL
08/13/2024
Permit issued — General Construction
B01079562-I1-GC
08/12/2024
Permit issued — Plumbing
B01079562-S1-PL
08/12/2024
Permit issued — General Construction
B01079475-I1-GC
08/02/2024
Filed — Alteration
HEREBY FILING FOR THE REMOVAL, REPLACEMENT AND INSTALLATION OF FIXTURES IN APARTMENT #F9 LOCATED ON THE SIXTH FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B01079475-S1
08/02/2024
Filed — Alteration
HEREBY FILING FOR THE REMOVAL, REPLACEMENT AND INSTALLATION OF FIXTURES IN APARTMENT #F9 LOCATED ON THE SIXTH FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B01079475-I1
08/02/2024
Special inspection requirement — Lighting in dwelling units
Ann Macklin
07/25/2024
Filed — Alteration
HEREBY FILING FOR THE INTERIOR RENOVATION OF EXISTING APARTMENT #C7 LOCATED ON THE THIRD FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B01079562-S1
07/25/2024
Filed — Alteration
HEREBY FILING FOR THE INTERIOR RENOVATION OF EXISTING APARTMENT #C7 LOCATED ON THE THIRD FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B01079562-I1
07/18/2024
Signed off — Alteration
B01062439-I1
07/11/2024
Special inspection requirement — Final
Ann Macklin
07/11/2024
Special inspection requirement — Tenant Protection Plan Compliance
David Sivin
07/11/2024
Special inspection requirement — Energy Code Compliance Inspections
Ann Macklin
07/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
06/06/2024
Filed — Alteration
B01062439-I1
06/06/2024
Permit issued — Sidewalk Shed
B01062439-I1-SH
08/23/2023
Signed off — Alteration
INSTALL WASHER AND DRYERS FOR BUILDING TENANT'S ACCESSORY USE AT CELLAR. WORK INCLUDES PLUMBING PIPING FOR WASHER AND DRYERS, NEW SPRINKLER HEADS OFF DOMESTIC WATER, AND DRYER VENTING. ALL AS PER PLAN. NO CHANGE IN EGRESS USE OR OCCUPANCY.
B07999973-I1
08/21/2023
Signed off — Alteration
Decommission of existing Sprint site. Remove antennas and equipment from the roof. Interior conduits to remain. Initial installation approved under application #300837726
B00618623-I1
08/17/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/09/2023
Filed — Alteration
INSTALL WASHER AND DRYERS FOR BUILDING TENANT'S ACCESSORY USE AT CELLAR. WORK INCLUDES PLUMBING PIPING FOR WASHER AND DRYERS, NEW SPRINKLER HEADS OFF DOMESTIC WATER, AND DRYER VENTING. ALL AS PER PLAN. NO CHANGE IN EGRESS USE OR OCCUPANCY.
B07999973-P1
08/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES MOORE
08/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES MOORE
08/01/2023
Filed — Alteration
Decommission of existing Sprint site. Remove antennas and equipment from the roof. Interior conduits to remain. Initial installation approved under application #300837726
B00618623-P1
07/31/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/28/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/19/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/17/2023
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
05/22/2023
Violation issued (HPD, closed)
A
05/22/2023
Violation issued (HPD, closed)
A
05/22/2023
Violation issued (HPD, open)
C
04/07/2023
Violation issued (HPD, closed)
A
04/07/2023
Violation issued (HPD, closed)
A
04/07/2023
Violation issued (HPD, open)
C
04/07/2023
Violation issued (HPD, open)
C
04/07/2023
Violation issued (HPD, closed)
B
04/07/2023
Violation issued (HPD, open)
C
04/07/2023
Violation issued (HPD, closed)
B
01/22/2023
Violation issued (HPD, closed)
C
01/22/2023
Violation issued (HPD, closed)
C
01/05/2023
Violation issued (HPD, closed)
C
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCARRERAS HOME IMPROV INC08/14/2024
DOB NOWGeneral ConstructionPermit IssuedWISE CONSTRUCTION SAFETY08/13/2024
DOB NOWPlumbingPermit IssuedCARRERAS HOME IMPROV INC08/12/2024
DOB NOWGeneral ConstructionSigned-offWISE CONSTRUCTION SAFETY08/12/2024
DOB NOWSidewalk ShedSigned-offAPEX GROUP NY CORP06/06/2024
DOB NOWPlumbingSigned-offADVANCED PLUMBING MECH10/27/2022
DOB NOWAntennaSigned-offWATCH HILL WIRELESS SOLU01/04/2022
BISOTISSUEDA & G MAINTENANCE INC09/15/2017
BISOTISSUEDRELIABLE GENERAL CONTRACT09/13/2017
BISEQISSUEDROCK GROUP NY CORP04/04/2017
BISOTISSUEDMC FAR CONTRACTORS INC11/22/2016
BISOTISSUEDSQUAN CONSTRUCTION SERVIC10/06/2016
BISEQISSUEDROCK GROUP NY CORP04/05/2016
BISOTISSUEDMC FAR CONTRACTORS INC03/31/2016
BISBLISSUEDABILENE, INC02/04/2016
BISPLISSUEDBELL FUEL OIL, LLC12/30/2015
BISOTISSUEDSQUAN CONSTRUCTION SERVIC10/15/2015
BISEQISSUEDROCK GROUP NY CORP03/27/2015
BISOTISSUEDSQUAN CONSTRUCTION SERVIC03/12/2015
BISEQISSUEDROCK GROUP NY CORP03/25/2014
BISEQISSUEDROCK GROUP NY CORP10/03/2013
BISEQISSUEDP.J.B. CONTRACTING CORP08/16/2011
3 projects · most recent 07/23/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/23/2026——Gas, Water/Sanitary
08/20/2025Permit IssuedCARRERAS HOME IMPROV INCGas, Water/Sanitary
08/20/2025Signed-offCARRERAS HOME IMPROV INCGas, Water/Sanitary
5 projects · most recent 05/20/2026
General Wiring
FiledStatusContractorScope
05/20/2026Permit IssuedABILENE ELECTRIC INC—
11/25/2024CompleteWISE ELECTRIC SOLUTIONSGeneral Wiring
08/06/2024Permit IssuedWISE ELECTRIC SOLUTIONSGeneral Wiring
06/07/2024Permit IssuedHIGH QUALITY ELECTRIC OF—
01/29/2020CompleteNEW PHASE ELEC'L CONTR'S—
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
10/13/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/31/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/28/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/19/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/17/2023Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
07/08/2026Fire-Resistant Penetrations and JointsAnn Macklinspecial
07/08/2026Tenant Protection Plan Compliance—special
08/20/2025Fire-Resistant Penetrations and JointsAnn Macklinspecial
08/20/2025Tenant Protection Plan ComplianceDavid Sivinspecial
08/12/2025Fire-Resistant Penetrations and JointsAnn Macklinspecial
08/12/2025Tenant Protection Plan Compliance—special
08/02/2024Lighting in dwelling unitsAnn Macklinenergy_progress
07/11/2024FinalAnn Macklinprogress
07/11/2024Tenant Protection Plan ComplianceDavid Sivinspecial
07/11/2024Energy Code Compliance InspectionsAnn Macklinprogress
07/11/2024Fire-Resistant Penetrations and JointsAnn Macklinspecial
08/09/2023Fire-Resistant Penetrations and JointsJAMES MOOREspecial
08/09/2023Fire-Resistant Penetrations and JointsJAMES MOOREspecial
▾Documents — 151 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/27/2026B00618623-P1Request digital key ↗
08/27/2026B00618623-I1Request digital key ↗
08/27/2026B07999973-P1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits30
▸BISWORK PERMIT APPLICATION15
09/21/2017321653769Open ↗
09/19/2017321653769Open ↗
04/14/2017320904759Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION10
04/26/2019321092358Open ↗
09/19/2017321653769Open ↗
09/15/2017340283892Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION5
05/14/2019321092358Open ↗
09/01/2017340283892Open ↗
07/23/2016320904759Open ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
06/17/2016320904759Open ↗
▸Seals & Professional Certifications39
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/27/2026B07999973-I1Open ↗
08/27/2026B07999973-P1Open ↗
08/24/2026B01062439-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
09/28/2019321092358Open ↗
09/22/2017340283892Open ↗
09/22/2017340283892Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026B01079475-S1Open ↗
09/01/2026B07999973-I1Open ↗
08/25/2026B01079562-P2Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
09/19/2017321653769Open ↗
12/29/2015340340189Open ↗
08/14/2015340283892Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
09/19/2017321653769Open ↗
10/15/2013320904759Open ↗
08/18/2011320348771Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
12/29/2015340340189Open ↗
08/14/2015340283892Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/29/2015340340189Open ↗
08/14/2015340283892Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026B01079475-I1Open ↗
08/24/2026B01079475-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/18/2011320348771Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
12/29/2015340340189Open ↗
▸BISSCHEDULE B - PLUMBING1
12/29/2015340340189Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
09/19/2017321653769Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/27/2026B07999973-P1Open ↗
08/27/2026B07999973-I1Open ↗
08/24/2026B01079562-P1Open ↗
Showing 3 of 11 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
03/02/2015321092358Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
03/31/2016340283892Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/19/2017321653769Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
09/28/2019321092358Open ↗
09/22/2017340283892Open ↗
09/19/2017321653769Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
03/31/2016340283892Open ↗
12/29/2015340340189Open ↗
08/14/2015340283892Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
12/29/2015340340189Open ↗
08/14/2015340283892Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
09/28/2019321092358Open ↗
09/22/2017340283892Open ↗
▸BISTR8: Energy Code Progress Inspections1
03/02/2015321092358Open ↗
▸BISNYCECC ANALYSIS1
08/14/2015340283892Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00618623-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY3
03/31/2016340283892Open ↗
12/29/2015340340189Open ↗
08/14/2015340283892Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
08/14/2015340283892Open ↗
▸Approvals, Objections & Sign-offs13
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
10/28/2019321092358Open ↗
09/28/2019321092358Open ↗
09/22/2017340283892Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
03/02/2015321092358Open ↗
10/15/2013320904759Open ↗
08/18/2011320348771Open ↗
▸BISSHED LETTER2
04/21/2016320904759Open ↗
04/10/2015320904759Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
04/21/2016320904759Open ↗
08/14/2015340283892Open ↗
▸BISSUPERSEDING LETTER2
09/21/2017321653769Open ↗
04/10/2015320904759Open ↗
▸BISFINAL1
08/14/2015340283892Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
10/28/2019321092358Open ↗
09/28/2019321092358Open ↗
05/22/2019321092358Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms15
▸BISADDITIONAL INFORMATION6
05/22/2019321092358Open ↗
09/15/2017340283892Open ↗
07/26/2016320904759Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET4
09/19/2017321653769Open ↗
03/02/2015321092358Open ↗
10/15/2013320904759Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
10/28/2019321092358Open ↗
09/28/2019321092358Open ↗
09/22/2017340283892Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
12/29/2015340340189Open ↗
08/14/2015340283892Open ↗