← Back
Office with commercial, 1-6 stories
Morris Park Branch Library
975 MORRIS PARK AVENUE · Morris Park · BIN 2045398
💬 Discuss this project
1929Year Built
2Stories
O5Building Class
R4Zoning
19,948 sfGross Floor Area
4Units
4 Open Violations ▸
Office with commercial, 1-6 stories · Owner of record: MORRIS PARTNERS GROUP LLC · 10,000 sf lot · 1.99 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Roof7p · 2 filings · 20 docs
Floor 26p · 3 filings · 12 docs
Floor 17p · 2 filings · 20 docs
Cellar7p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GROUP GJONAJ2307/08/2026
PLATINUM SERVICES NY407/08/2026
MORRIS PARTNERS GROUP LLC303/22/2026
975 MORRIS PARK AVE LLC103/22/2026
975 MORRIS PARK2303/22/2026
OWNER OF BUILDING AT 975203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/05/2020$4.2M—— → —$211/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MARIO MENDOZA BLANCO1301/03/2024
ASHRAF CORP108/18/2021
DENNIS V. PANETTIERI, ARCHITECT103/03/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PRAXIS WORKSHOP2603/21/2026
ALBA CONSULTANTS203/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GJUSHI CONSTRUCTION CO LLGeneral Contractor403/21/2026
ZICKLIN CONTRACTING CORPGeneral Contractor303/21/2026
ARS RESTORATION INCGeneral Contractor307/08/2026
A.M. SAGE PLG & HTG LLCPlumbing207/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor107/08/2026
A & A RESTORATION INCGeneral Contractor107/08/2026
WATER DYNAMIC P & H CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DM ENGINEERS PLLC64271001/03/2024
Building Lifecycle
All (101)Filed (15)Permit Issued (9)Signed Off (1)Violation (31)Inspection (5)Objection (10)Special Inspection (30)
01/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
Ronald Diaz
01/09/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Ronald Diaz
01/09/2024
Special inspection requirement — HVAC-R and service water heating system controls
Ronald Diaz
01/09/2024
Special inspection requirement — Fenestration areas
Ronald Diaz
01/09/2024
Special inspection requirement — Final
Ronald Diaz
01/09/2024
Special inspection requirement — Mechanical Systems
Ronald Diaz
01/09/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Ronald Diaz
01/09/2024
Special inspection requirement — Fenestration air leakage
Ronald Diaz
01/09/2024
Special inspection requirement — Interior lighting power
Ronald Diaz
01/09/2024
Special inspection requirement — Lighting controls
Ronald Diaz
01/09/2024
Special inspection requirement — Air barrier - visual inspection
Ronald Diaz
01/09/2024
Special inspection requirement — Energy Code Compliance Inspections
Ronald Diaz
01/09/2024
Special inspection requirement — Fire-Resistance Rated Construction
Ronald Diaz
01/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ronald Diaz
01/09/2024
Special inspection requirement — Maintenance information
Ronald Diaz
01/03/2024
Filed — Alteration
PROPOSED RENOVATION OF AN EXISTING COMMERCIAL SPACE THAT INCLUDES COSMETIC IMPROVEMENTS, SEPARATION OF A PORTION OF SPACE TO CREATE A SEPARATE COMMERCIAL SPACE & THE INSTALLATION OF A COMMERCIAL HOOD W/ DUCT WORK ON AN EXISTING KITCHEN AT THE 1ST FL.
X00820295-P3
01/03/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Ronald Diaz
01/03/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Ronald Diaz
01/03/2024
Special inspection requirement — Fenestration air leakage
Ronald Diaz
01/03/2024
Special inspection requirement — HVAC-R and service water heating equipment
Ronald Diaz
01/03/2024
Special inspection requirement — Air barrier - visual inspection
Ronald Diaz
01/03/2024
Special inspection requirement — Interior lighting power
Ronald Diaz
01/03/2024
Special inspection requirement — Lighting controls
Ronald Diaz
01/03/2024
Special inspection requirement — Energy Code Compliance Inspections
Ronald Diaz
01/03/2024
Special inspection requirement — Mechanical Systems
Ronald Diaz
01/03/2024
Special inspection requirement — Final
Ronald Diaz
01/03/2024
Special inspection requirement — Fire-Resistance Rated Construction
Ronald Diaz
01/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ronald Diaz
01/03/2024
Special inspection requirement — Maintenance information
Ronald Diaz
01/03/2024
Special inspection requirement — HVAC-R and service water heating system controls
Ronald Diaz
01/03/2024
Special inspection requirement — Fenestration areas
Ronald Diaz
12/01/2023
Filed — Alteration
PROPOSED PLUMBING WORK PART OF RENOVATION OF AN EXISTING COMMERCIAL SPACE FILED IN CONJUNCTION WITH ALTERATION DOB#X00820295
X00820309-P4
12/01/2023
Filed — Alteration
PROPOSED RENOVATION OF AN EXISTING COMMERCIAL SPACE THAT INCLUDES COSMETIC IMPROVEMENTS, SEPARATION OF A PORTION OF SPACE TO CREATE A SEPARATE COMMERCIAL SPACE & THE INSTALLATION OF A COMMERCIAL HOOD W/ DUCT WORK ON AN EXISTING KITCHEN AT THE 1ST FL.
X00820295-P2
11/03/2023
Filed — Alteration
PROPOSED PLUMBING WORK PART OF RENOVATION OF AN EXISTING COMMERCIAL SPACE FILED IN CONJUNCTION WITH ALTERATION DOB#X00820295
X00820309-P3
10/19/2023
Filed — Alteration
PROPOSED RENOVATION OF AN EXISTING COMMERCIAL SPACE THAT INCLUDES COSMETIC IMPROVEMENTS, SEPARATION OF A PORTION OF SPACE TO CREATE A SEPARATE COMMERCIAL SPACE & THE INSTALLATION OF A COMMERCIAL HOOD W/ DUCT WORK ON AN EXISTING KITCHEN AT THE 1ST FL.
X00820295-P1
10/16/2023
Filed — Alteration
PROPOSED PLUMBING WORK PART OF RENOVATION OF AN EXISTING COMMERCIAL SPACE FILED IN CONJUNCTION WITH ALTERATION DOB#X00820295
X00820309-P2
10/03/2023
Violation issued (ECB, closed)
Elevators
08/17/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/09/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/03/2023
Filed — Alteration
PROPOSED PLUMBING WORK PART OF RENOVATION OF AN EXISTING COMMERCIAL SPACE FILED IN CONJUNCTION WITH ALTERATION DOB#X00820295
X00820309-P1
06/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/03/2023
Permit issued — Plumbing
X00820309-I1-PL
03/02/2023
Permit issued — General Construction
X00820295-I1-GC-CX
01/31/2023
Filed — Alteration
PROPOSED PLUMBING WORK PART OF RENOVATION OF AN EXISTING COMMERCIAL SPACE FILED IN CONJUNCTION WITH ALTERATION DOB#X00820295
X00820309-I1
01/31/2023
Filed — Alteration
PROPOSED RENOVATION OF AN EXISTING COMMERCIAL SPACE THAT INCLUDES COSMETIC IMPROVEMENTS, SEPARATION OF A PORTION OF SPACE TO CREATE A SEPARATE COMMERCIAL SPACE & THE INSTALLATION OF A COMMERCIAL HOOD W/ DUCT WORK ON AN EXISTING KITCHEN AT THE 1ST FL.
X00820295-I1
10/28/2022
Permit issued — General Construction
X00600269-I1-GC
09/26/2022
Signed off — Alteration
X00570471-I1
08/11/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/26/2022
Objection resolved — Addressed
06/17/2022
Permit issued — General Construction
X00600269-I1-GC
06/16/2022
Objection raised — Scope
06/13/2022
Filed — Alteration
Proposed exterior renovation of an existing 2 story commercial building. Existing windows, storefronts, doors, and cavities on the exterior perimeter wall to remain. Only repairing, waterproofing, and new cladding will be installed as per the drawings.
X00600269-P1
12/02/2021
Permit issued — General Construction
X00600269-I1-GC
10/04/2021
Filed — Alteration
Proposed exterior renovation of an existing 2 story commercial building. Existing windows, storefronts, doors, and cavities on the exterior perimeter wall to remain. Only repairing, waterproofing, and new cladding will be installed as per the drawings.
X00600269-I1
09/23/2021
Permit issued — Sidewalk Shed
X00570471-I1-SH
08/18/2021
Filed — Alteration
X00570471-I1
07/02/2021
Permit issued — General Construction
X00478674-I1-GC
07/02/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/16/2021
Permit issued — Plumbing
X00503191-I1-PL
06/01/2021
Permit issued — Mechanical Systems
X00503185-I1-MS
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offA.M. SAGE PLG & HTG LLC03/03/2023
DOB NOWGeneral ConstructionPermit IssuedARS RESTORATION03/02/2023
DOB NOWGeneral ConstructionPermit IssuedARS RESTORATION10/28/2022
DOB NOWGeneral ConstructionPermit IssuedZICKLIN CONTRACTING CORP06/17/2022
DOB NOWGeneral ConstructionPermit IssuedA & A RESTORATION INC12/02/2021
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC09/23/2021
DOB NOWGeneral ConstructionPermit IssuedGJUSHI CONSTRUCTION CO LL07/02/2021
DOB NOWPlumbingSigned-offHYDRO PLBG & HTG CORP06/16/2021
DOB NOWMechanical SystemsPermit IssuedGJUSHI CONSTRUCTION CO LL06/01/2021
BISOTISSUEDAWL INDUSTRIES INC06/15/2006
BISOTISSUEDAWL INDUSTRIES INC06/15/2006
BISSPISSUEDASHLAR MECHANICAL CORP04/25/2006
BISPLISSUEDARISTA PLUIMBING & HEATING CORP.04/13/2006
BISPLISSUEDPROTO P & H SERVICES CORP07/26/2005
BISOTISSUEDAWL INDUSTRIES INC07/05/2005
BISEQISSUEDL & B CONSTRUCTIOIN INC05/23/2005
BISEQISSUEDL&B CONSTRUCTION INC.05/17/2005
BISPLISSUEDPROTO P & H SERVICES CORP04/13/2005
BISPLISSUEDARISTA PLUIMBING & HEATING CORP.04/08/2005
BISMHISSUEDCAMAC ASTOR LEASING LLC03/16/2005
BIS—ISSUEDCAMAC ASTOR LEASING, LLC03/14/2005
BISOTISSUEDAWL INDUSTRIES, INC.01/12/2005
BISOTISSUEDAWL INDUSTRIES INC01/12/2005
BISEQISSUEDAWL INDUSTRIES INC01/12/2005
BISEQISSUEDTWIN & SWING SCAFFOLDING06/11/2004
BISEQISSUEDTWIN & SWING SCAFFOLDING06/11/2004
BISPLISSUEDARISTA PLUIMBING & HEATING CORP.05/18/2004
BISOTISSUEDAWL INDUSTRIES INC04/06/2004
BISEQISSUEDAWL INDUSTRIES INC04/06/2004
BISOTISSUEDAWL INDUSTRIES, INC.04/06/2004
BISMHISSUEDCAMAC ASTOR LEASING LLC04/24/2002
BISOTISSUEDCAMAC ASTOR LEASING LLC12/04/2001
BISPLISSUEDTHE RIGHT CONNECTION P&H04/08/1998
BISOTISSUEDTALC CONTRACTING CORP.02/04/1998
BISFPISSUEDIDEAL FIRE CONTROL03/12/1997
BISOTISSUEDTALC CONTRACTING CORP.12/11/1995
BISEQISSUEDTALC CONTRACTING CORP.12/11/1995
BISOTISSUEDOIUSEPPE FANELLI10/29/1993
BISMHISSUEDOIUSEPPE FANELLI10/29/1993
BISEQISSUEDACTL CONTRACTING CORP08/03/1992
+ 4 more permits on file
2 projects · most recent 01/03/2024
Ventilation Systems Air Conditioning Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
01/03/2024Permit IssuedARS RESTORATION INCAir Conditioning Systems, Ventilation Systems
Cooling
Lg FTXS18LVJU 18,000 BTU · Fan Coil Indoor ×6
PUZ-HA42NKA1 42,000 BTU · Condensing Unit ×6
LMU36CHV 34,000 BTU · Condensing Unit ×3
Daikin PEAD-A42AA7 48,000 BTU · Vrf Indoor ×6
Ventilation
Greenheck BSQ-200 5,400 CFM · Makeup Air ×2
IDHC 75 kW · Electric Heater ×2
Captiveaire NCA16FA 5,400 CFM · Kitchen Exhaust ×2
Indeeco QUA 10 kW · Electric Heater ×3
Solar & Palau TR300 300 CFM ×3
04/20/2021Permit IssuedGJUSHI CONSTRUCTION CO LLAssociated Ducts and Piping, Ventilation Systems
Ventilation
Greenheck SP-A200 210 CFM · Exhaust Fan ×3
Ducts & Piping
N/A N/A ×1
1 project · most recent 12/01/2023
Gas Water/Sanitary
FiledStatusContractorScope
12/01/2023Signed-offA.M. SAGE PLG & HTG LLCGas, Water/Sanitary
6 projects · most recent 09/15/2025
General Wiring
FiledStatusContractorScope
09/15/2025Permit IssuedEMPIRE LIC ELECL CONTRS1 meters, 1 new_meters
09/07/2023Permit IssuedAL ELECTRICAL GROUP INCGeneral Wiring
05/02/2023Permit IssuedGOTHAM WIRING LICENSEDGeneral Wiring
03/24/2023Permit IssuedGOTHAM WIRING LICENSEDGeneral Wiring
06/17/2021Permit IssuedAL ELECTRICAL GROUP INCGeneral Wiring
02/16/2021Permit IssuedAL ELECTRICAL GROUP INC—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/09/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/11/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/02/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 88
DateRequirementInspectorRole
01/09/2024Fenestration and door U-factor and product ratingsRonald Diazenergy_progress
01/09/2024Maintenance informationRonald Diazenergy_progress
01/09/2024Mechanical SystemsRonald Diazspecial
01/09/2024Fire-Resistant Penetrations and JointsRonald Diazspecial
01/09/2024Fire-Resistance Rated ConstructionRonald Diazprogress
01/09/2024FinalRonald Diazprogress
01/09/2024Energy Code Compliance InspectionsRonald Diazprogress
01/09/2024Air barrier - visual inspectionRonald Diazenergy_progress
01/09/2024HVAC-R and service water heating equipmentRonald Diazenergy_progress
01/09/2024Fenestration areasRonald Diazenergy_progress
01/09/2024Lighting controlsRonald Diazenergy_progress
01/09/2024Interior lighting powerRonald Diazenergy_progress
01/09/2024HVAC-R and service water heating system controlsRonald Diazenergy_progress
01/09/2024Fenestration air leakageRonald Diazenergy_progress
01/09/2024HVAC-R and service water piping design and insulationRonald Diazenergy_progress
01/03/2024Fenestration areasRonald Diazenergy_progress
01/03/2024HVAC-R and service water heating system controlsRonald Diazenergy_progress
01/03/2024Maintenance informationRonald Diazenergy_progress
01/03/2024Lighting controlsRonald Diazenergy_progress
01/03/2024Fenestration air leakageRonald Diazenergy_progress
01/03/2024HVAC-R and service water piping design and insulationRonald Diazenergy_progress
01/03/2024Fenestration and door U-factor and product ratingsRonald Diazenergy_progress
01/03/2024Interior lighting powerRonald Diazenergy_progress
01/03/2024HVAC-R and service water heating equipmentRonald Diazenergy_progress
01/03/2024Fire-Resistant Penetrations and JointsRonald Diazspecial
Latest 25 of 88.
▾Documents — 71 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/25/2026X00478674-I1Request digital key ↗
08/25/2026X00503191-I1Request digital key ↗
08/25/2026X00570471-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸Seals & Professional Certifications42
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/25/2026X00478674-I1Open ↗
08/25/2026X00503191-I1Open ↗
08/25/2026X00570471-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
08/29/2026X00570471-I1Open ↗
08/29/2026X00820295-P2Open ↗
08/29/2026X00820295-P2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
08/29/2026X00820295-P2Open ↗
08/29/2026X00600269-P1Open ↗
08/26/2026X00503185-I1Open ↗
Showing 3 of 12 on file for this type
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/25/2026X00478674-I1Open ↗
08/25/2026X00503191-I1Open ↗
08/24/2026X00600269-I1Open ↗
Showing 3 of 14 on file for this type