← Back
BuildNYC
Public elementary, junior or senior high
South Bronx Classical Charter School V
977 FOX STREET · BIN 2005660
💬 Discuss this project
1973Year Built
5Stories
W1Building Class
R7-1Zoning
220,180 sfGross Floor Area
1Units
LL97 Covered20 Active Violations 1 unresolved · 19 paperwork only 2 likely answered ▸
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 112,000 sf lot · 1.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofI.S. 217Under Construction29p · 2 filings · 20 docs
BulkheadI.S. 217Under Construction1p · 1 filing · 20 docs
Floor 4I.S. 217Under Construction19p · 1 filing · 20 docs
Floor 3I.S. 217Under Construction19p · 1 filing · 20 docs
Floor 2I.S. 217Under Construction19p · 1 filing · 20 docs
Floor 1I.S. 217Under Construction31p · 2 filings · 20 docs
CellarI.S. 217Under Construction20p · 1 filing · 20 docs
Site & exteriorI.S. 217Under Construction39p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority9210/10/2026
NYC Department of Design and Construction1203/21/2026
NYC Department of Education403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NYC School Construction Authority510/09/2026
Dseny Engineering Services406/02/2026
Giuseppe Tulumello, AIA503/07/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC School Construction Authority403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Gilston Electrical ContngElectrical1003/21/2026
Akm Construction Service*Scaffold407/23/2026
ABC Construction ContGeneral Contractor304/09/2026
Pulsar ElectricElectrical203/21/2026
Bharat Mechanicalspecialty_contractor209/19/2026
Akm Construction Service*General Contractor109/13/2026
Triumph Plumbing & HeatingPlumbing109/13/2026
WDFPlumbing107/08/2026
Charan Electrical Enterp'sElectrical103/22/2026
L&B Electrical InternationalElectrical103/21/2026
E.N.E.L. ElectricalElectrical103/21/2026
J.M.J. ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons106710/09/2026
MP Engineers & Architects1438203/24/2025
Twin Peaks317102/22/2023
Building Lifecycle
All (115)Filed (14)Permit Issued (11)Signed Off (2)Violation (60)Inspection (2)Objection (8)Special Inspection (18)
10/09/2026
Filed — Alteration
Remove and replace 27 roof drains, 1 corner drain, relocate 6 vent stacks, 35 vent stack extensions, Remove 6 gas vents. One yard drain to be removed and replaced
X01108281-P1
10/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
10/09/2026
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
09/18/2026
Permit issued — Mechanical Systems
X01108281-S4-MS
09/18/2026
Permit issued — Mechanical Systems
X01108281-S1-MS
09/11/2026
Permit issued — General Construction
X01108281-I1-GC-CX
09/11/2026
Permit issued — Plumbing
X01108281-S2-PL
07/23/2026
Violation issued (ECB, open)
Construction
07/23/2026
Violation issued (ECB, open)
Construction
07/23/2026
Violation issued (ECB, open)
Construction
07/22/2026
Permit issued — Sidewalk Shed
X01398024-I1-SH
07/10/2026
Permit issued — Supported Scaffold
X01398032-I1-SF
07/10/2026
Permit issued — Construction Fence
X01397478-I1-FN
06/23/2026
Permit issued — Protection and Mechanical Methods
X01398039-I1-PMM
06/02/2026
Filed — Alteration
SH/IS217X- FOR TEMPORARY CONSTRUCTION EQUIPMENT (SHED)SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO DOB#X01108281, NO CHANGE IN USE, OCCUPANCY OR EGRESS
X01398024-I1
06/02/2026
Filed — Alteration
FN/IS217X- FOR TEMPORARY CONSTRUCTION EQUIPMENT (FENCE)SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO DOB#X01108281, NO CHANGE IN USE, OCCUPANCY OR EGRESS
X01397478-I1
06/02/2026
Filed — Alteration
CH/IS217X- FOR TEMPORARY CONSTRUCTION EQUIPMENT (CHUTE)SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO DOB#X01108281, NO CHANGE IN USE, OCCUPANCY OR EGRESS
X01398039-I1
06/02/2026
Filed — Alteration
SF/IS217X- FOR TEMPORARY CONSTRUCTION EQUIPMENT (SCAFFOLD)SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO DOB#X01108281, NO CHANGE IN USE, OCCUPANCY OR EGRESS
X01398032-I1
04/01/2026
Signed off — Alteration
Replacement of auditorium seating, provide wheelchair accessible seating areas and associated companion seats, provide LED seat aisle lighting, provide an induction loop system, and replacing existing drinking fountain with accessible drinking fountains
X08023124-I1
04/01/2026
Signed off — Alteration
Replacement of auditorium seating, provide wheelchair accessible seating areas and associated companion seats, provide LED seat aisle lighting, provide an induction loop system, and replacing existing drinking fountain with accessible drinking fountains
X08023124-S2
03/25/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/02/2026
Violation issued (ECB, open)
Elevators
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/29/2025
Violation issued (ECB, closed)
Construction
08/29/2025
Violation issued (ECB, open)
Construction
08/29/2025
Violation issued (ECB, closed)
Construction
08/29/2025
Violation issued (ECB, closed)
Construction
08/29/2025
Violation issued (ECB, open)
Construction
08/29/2025
Violation issued (ECB, closed)
Construction
08/29/2025
Violation issued (ECB, open)
Construction
08/29/2025
Violation issued (ECB, closed)
Construction
04/03/2025
Permit issued — General Construction
X08023124-I1-GC
03/24/2025
Filed — Alteration
Remove and replace 27 roof drains, 1 corner drain, relocate 6 vent stacks, 35 vent stack extensions, Remove 6 gas vents. One yard drain to be removed and replaced
X01108281-S4
03/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
GEORGE GHEBRYAL
02/14/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/10/2025
Filed — Alteration
Remove and replace 27 roof drains, 1 corner drain, relocate 6 vent stacks, 35 vent stack extensions, Remove 6 gas vents. One yard drain to be removed and replaced
X01108281-S1
01/10/2025
Filed — Alteration
Remove and replace 27 roof drains, 1 corner drain, relocate 6 vent stacks, 35 vent stack extensions, Remove 6 gas vents. One yard drain to be removed and replaced
X01108281-I1
01/10/2025
Filed — Alteration
Remove and replace 27 roof drains, 1 corner drain, relocate 6 vent stacks, 35 vent stack extensions, Remove 6 gas vents. One yard drain to be removed and replaced
X01108281-S2
01/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
01/10/2025
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
01/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
01/10/2025
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
01/10/2025
Special inspection requirement — Masonry
GEORGE GHEBRYAL
01/10/2025
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
01/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
01/10/2025
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
01/02/2025
Violation issued (ECB, open)
Elevators
11/07/2024
Violation issued (ECB, closed)
Construction
11/07/2024
Violation issued (ECB, open)
Construction
11/07/2024
Violation issued (ECB, open)
Construction
11/07/2024
Violation issued (ECB, open)
Construction
11/07/2024
Violation issued (ECB, closed)
Construction
09/09/2024
Special inspection requirement — Final
GEORGE GHEBRYAL
09/09/2024
Special inspection requirement — Mechanical Systems
JAMES WILSON
09/09/2024
Special inspection requirement — Final
GEORGE GHEBRYAL
09/09/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
05/21/2024
Permit issued — Plumbing
X08023124-S2-PL
05/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/28/2024
Permit issued — General Construction
X08023124-I1-GC
Latest 60 of 115 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedBharat Mechanical09/18/2026
DOB NOWMechanical SystemsPermit IssuedBharat Mechanical09/18/2026
DOB NOWGeneral ConstructionPermit IssuedAkm Construction Service*09/11/2026
DOB NOWPlumbingPermit IssuedTriumph Plumbing & Heating09/11/2026
DOB NOWSidewalk ShedPermit IssuedAkm Construction Service*07/22/2026
DOB NOWSupported ScaffoldPermit IssuedAkm Construction Service*07/10/2026
DOB NOWConstruction FencePermit IssuedAkm Construction Service*07/10/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedAkm Construction Service*06/23/2026
DOB NOWGeneral ConstructionSigned-offABC Construction Cont04/03/2025
DOB NOWPlumbingSigned-offWDF05/21/2024
DOB NOWGeneral ConstructionSigned-offABC Construction Cont03/28/2024
BISOTISSUEDLawrence's Contractor12/30/2024
BISOTISSUEDLawrence's Contractor08/19/2024
BISOTISSUEDLawrence's Contractor04/14/2023
BISOTISSUEDLawrence's Contractor01/20/2023
BISOTISSUEDLawrence's Contractor01/04/2022
BISOTISSUEDLawrence's Contractor10/22/2021
BISOTISSUEDTarasis Electric06/22/2015
BISOTISSUEDTarasis Electric04/09/2015
BISOTISSUEDAdam's European Contracting03/23/2015
BISOTISSUEDAdam's European Contracting08/04/2014
BISEQISSUEDAdam's European Contracting07/31/2014
BISOTISSUEDAdam's European Contracting03/21/2014
BISOTISSUEDAdam's European Contracting12/05/2013
BISMHISSUEDMidtown HVAC Enterprises04/27/2012
BISOTISSUEDMidtown HVAC Enterprises04/27/2012
BISEQISSUEDMidtown HVAC Enterprises04/27/2012
BISOTISSUEDMidtown HVAC Enterprises04/27/2012
BISOTISSUEDMidtown HVAC Enterprises04/27/2012
BISEQISSUEDMidtown HVAC Enterprises04/17/2012
BISOTISSUEDMidtown HVAC Enterprises04/11/2012
BISOTISSUEDMidtown HVAC Enterprises04/11/2012
BISOTISSUEDMidtown HVAC Enterprises04/11/2012
BISMHISSUEDMidtown HVAC Enterprises04/11/2012
BISMHISSUEDTomco Mechanical03/21/2012
BISOTISSUEDTomco Mechanical03/21/2012
BISOTISSUEDMidtown HVAC Enterprises03/06/2012
BISBLISSUEDVarsity Plumbing and Heating03/06/2012
BISPLISSUEDVarsity Plumbing and Heating03/06/2012
BISOTISSUEDMidtown HVAC Enterprises03/06/2012
+ 21 more permits on file
1 project · most recent 02/22/2023
Associated Ducts and Piping Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
02/22/2023Signed-offABC Construction ContAssociated Ducts and Piping, Heating Systems
Heating
N/A Manufacturer: Berko Model# GFR2004G Unit Heater ×1
Ventilation
N/A N/A
Ducts & Piping
N/A N/A ×1
2 projects · most recent 10/09/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/09/2026Permit IssuedTriumph Plumbing & HeatingGas, Storm
02/22/2023Signed-offWDFWater/Sanitary
14 projects · most recent 07/20/2026
General Wiring
FiledStatusContractorScope
07/20/2026Permit IssuedStanco System Electrical Cont—
03/16/2026CompleteAnco Electl Contctng—
12/18/2025CompleteGilston Electrical ContngGeneral Wiring
11/26/2025CompleteAnco Electl Contctng—
07/09/2024CancelledGilston Electrical ContngGeneral Wiring
12/21/2023CompleteSpice Electric CompanyGeneral Wiring
12/05/2023CompleteAnco Electl Contctng—
11/16/2023CompleteAnco Electl Contctng—
04/14/2023CompleteCharan Electrical Enterp'sGeneral Wiring
05/27/2020CompleteCharan Electrical Enterp's—
02/29/2020Permit IssuedLaser Electrical ContractingGeneral Wiring
08/09/2019Permit IssuedR.M.F. ElectricGeneral Wiring
04/30/2019CompleteCharan Electrical Enterp's—
12/26/2017CompleteCharan Electrical Enterp's—
3 projects · most recent 06/02/2026
Sidewalk Shed Fence Scaffold
FiledStatusContractorScope
06/02/2026Permit IssuedAkm Construction Service*Sidewalk Shed
06/02/2026Permit IssuedAkm Construction Service*Fence
06/02/2026Permit IssuedAkm Construction Service*Scaffold
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/25/2026Pass-Final General Construction Non-Directive 14PassView ↗
02/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
10/09/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
10/09/2026Post-installed AnchorsGEORGE GHEBRYALspecial
03/16/2025Fire-Resistance Rated ConstructionGEORGE GHEBRYALprogress
01/10/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
01/10/2025Post-installed AnchorsGEORGE GHEBRYALspecial
01/10/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
01/10/2025Post-installed AnchorsGEORGE GHEBRYALspecial
01/10/2025MasonryGEORGE GHEBRYALspecial
01/10/2025Structural Steel - DetailsGEORGE GHEBRYALspecial
01/10/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
01/10/2025Post-installed AnchorsGEORGE GHEBRYALspecial
09/09/2024FinalGEORGE GHEBRYALprogress
09/09/2024Mechanical SystemsJAMES WILSONspecial
09/09/2024FinalGEORGE GHEBRYALprogress
09/09/2024Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
03/24/2023Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
02/27/2023Public Assembly Emergency LightingGEORGE GHEBRYALprogress
02/17/2023Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
I.S. 217EducationCellar, Floors 1–4, Roof
Project X01108281 Alteration · Permit Entire · 01/10/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 93 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch13
08/23/2026X08023124-I1Request digital key ↗
08/23/2026X08023124-S1Request digital key ↗
08/23/2026X08023124-S2Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/23/2026X00835839-I1Request digital key ↗
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature15
10/11/2026X01108281-P1Open ↗
08/23/2026X08023124-S2Open ↗
08/23/2026X08023124-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
10/11/2026X01108281-P1Open ↗
09/02/2026X01108281-I1Open ↗
08/24/2026X01108281-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026X01108281-I1Open ↗
08/24/2026X01108281-S1Open ↗
08/24/2026X00835839-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWNYCSCA - Approved Site Safety Plans3
08/16/2026X01398024-I1Open ↗
08/16/2026X01397478-I1Open ↗
08/16/2026X01398032-I1Open ↗
▸Approvals, Objections & Sign-offs34
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter15
10/11/2026X01108281-P1Open ↗
08/23/2026X08023124-I1Open ↗
08/23/2026X08023124-S2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)14
10/11/2026X01108281-P1Open ↗
08/23/2026X08023124-I1Open ↗
08/23/2026X08023124-S2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/23/2026X08023124-S2Open ↗
08/23/2026X08023124-I1Open ↗
08/13/2026X08023124-S1Open ↗
▸DOB NOWDEP Variance (V5) letter2
08/13/2026X08023124-S2Open ↗
08/13/2026X08023124-I1Open ↗
▸Other Documents18
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal15
10/11/2026X01108281-P1Open ↗
08/23/2026X08023124-S2Open ↗
08/23/2026X08023124-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWNYCSCA Exhibit 22
08/23/2026X08023124-I1Open ↗
08/23/2026X08023124-S2Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026X01108281-I1Open ↗