DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB06/13/2018FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB05/30/2018FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB05/30/2018FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB05/30/2018FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB04/06/2018VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB10/01/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
DOB02/09/2011FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB12/02/2010FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB01/03/2008V-DOB VIOLATION - ACTIVE
DOB01/19/2007V-DOB VIOLATION - ACTIVE
DOB01/06/2006V-DOB VIOLATION - ACTIVE
DOB01/06/2006V-DOB VIOLATION - ACTIVE
ECB03/23/2018FAILURE TO FILE A SPECIAL INSPECTION STATEMENT OF RESPONSIBILITY PRIOR TO PERMIT INSURANCE AND PRIOR TO START OF WORK UNDER SPECIAL INSPECTION REQS.AT TIME OF INSPECTION IT WAS OBSERVED THAT THE CONTRACTORS WERNothing owed — awaiting certificate of correction
ECB03/05/2018FAILURE TO NOTIFY DOB 24-48HRS OF THE START OF EXCAVATION. AT THE TIME OF INSPECTION IT WAS OBSERVED THAT THE CONTRACTORS WERE IN THE EXCAVATION & SOE PHASE. CONTRACTORS CALLED FOR A RULE 52 ON 12-14-17 & GIVENNothing owed — awaiting certificate of correction
ECB03/05/2018SEC. 3309.6;1814.3 FAILURE TO MONITOR ADJOINING STRUCTURES FOR MOVEMENT IN ALL DIRECTIONS DURING EXCAVATION-RELATED ACTIVITY THAT MAY ADVESLEY AFFECT ADJOINING STRUCTURES. AT THE TIME OF INSPECTION IT WAS OBSERNothing owed — awaiting certificate of correction
ECB03/05/2018FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY CHAPTER 33. AT THE TIME OF INSPECTION IT WAS OBSERVED THAT THE CONTRACTORS COULD NOT PRODUCE THE SITE SAFETY PLAN FOR THE ABOVE SITE AS PER LOCAL LAW 81Nothing owed — awaiting certificate of correction
ECB11/10/2010OPERATION OF PA W/O A CURRENT C/O. (AT CAFE RUBIO) NOTED: TABLES/CHAIRS W/SEATING ARRANGED FOR 83 PERSONS (IN FRONT & REAR SECTIONS) W/ADDITIONAL SEATING IN ADJACENT REAR YARD FOR 6-10 PERSONS NOW EXCEEDING MAXNothing owed — awaiting certificate of correction
ECB09/01/2010OPERATION OF A PLACE OF ASSEMBLY W/O A CURRENT C OF O NOTED: AN EATING & DRINKING ESTABLISHMENT NAMES "RUBIO CAFE LOUNGE" W/ A SEATING CAPACITY OF APPROX 100 PERSONS IS IN OPERATION @ THE 1ST FL OF THE BLDG W/ONothing owed — awaiting certificate of correction
ECB09/01/2010FAILURE TO COMPLY WITH THE ORDER OF THE COMMISSIONER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS. NOTED: RESPONDENT FAILED TO COMPLY WITH THE COMMISSIONER'S ORDER TO CORRECT THE VIOLATINGNothing owed — awaiting certificate of correction
ECB07/22/199118B,36Nothing owed — awaiting certificate of correction
Primarily 2 family with 1 store or office · 2,000 sf lot · 2.3 FAR built · Flood zone X