← Back
Primarily 4 family with 1 store or office
98-07 37 AVENUE
QUEENS · BIN 4043169
💬 Discuss this project
1930Year Built
3Stories
S4Building Class
R6BZoning
3,600 sfGross Floor Area
5Units
Rent Stabilized6 Open Violations ▸
Primarily 4 family with 1 store or office · Owner of record: 37TH AVE BAPAZ LLC · 2,500 sf lot · 1.44 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 1 filing · 20 docs
Floor 3Under Construction6p · 1 filing · 20 docs
Floor 2Under Construction6p · 1 filing · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MEYERSON MANAGEMENT707/08/2026
37TH AVE BAPAZ LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/17/2024$1.2M—Private party → 37TH AVE BAPAZ LLC$340/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CQ&J CORPORATION311/12/2025
NEW YORK ENGINEERING ASSOC., P.C.102/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WM ARCH603/21/2026
NEW YORK ENGINEERING ASSOCIATES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MORELL BUILDERS INCGeneral Contractor207/08/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SIMON7555211/12/2025
NEW YORK ENGINEERING ASSO851102/07/2022
Building Lifecycle
All (62)Filed (4)Permit Issued (4)Signed Off (2)Violation (25)Inspection (4)Special Inspection (23)
08/10/2026
Signed off — Alteration
EXISTING 3 STORY MIXED USE BUILDING WITH MECHANICAL WORK AT 2ND & 3RD FLOOR IN CONJUNCTION WITH ALT2 JOB # Q01279585-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY
Q01279585-I1
06/12/2026
Permit issued — Mechanical Systems
Q01279585-S2-MS
03/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/17/2026
Permit issued — Plumbing
Q01279585-S1-PL
02/04/2026
Permit issued — General Construction
Q01279585-I1-GC
01/23/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/21/2025
Violation issued (HPD, closed)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/12/2025
Filed — Alteration
EXISTING 3 STORY MIXED USE BUILDING WITH MECHANICAL WORK AT 2ND & 3RD FLOOR IN CONJUNCTION WITH ALT2 JOB # Q01279585-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY
Q01279585-I1
11/12/2025
Filed — Alteration
EXISTING 3 STORY MIXED USE BUILDING WITH MECHANICAL WORK AT 2ND & 3RD FLOOR IN CONJUNCTION WITH ALT2 JOB # Q01279585-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY
Q01279585-S1
11/12/2025
Filed — Alteration
EXISTING 3 STORY MIXED USE BUILDING WITH MECHANICAL WORK AT 2ND & 3RD FLOOR IN CONJUNCTION WITH ALT2 JOB # Q01279585-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY
Q01279585-S2
09/05/2025
Special inspection requirement — Maintenance information
CALVIN TRAN
09/05/2025
Special inspection requirement — Duct leakage testing, insulation and design
CALVIN TRAN
09/05/2025
Special inspection requirement — Fire-Resistance Rated Construction
CALVIN TRAN
09/05/2025
Special inspection requirement — Lighting in dwelling units
CALVIN TRAN
09/05/2025
Special inspection requirement — Lighting controls
CALVIN TRAN
09/05/2025
Special inspection requirement — Metering
CALVIN TRAN
09/05/2025
Special inspection requirement — Interior lighting power
CALVIN TRAN
09/05/2025
Special inspection requirement — Energy Code Compliance Inspections
CALVIN TRAN
09/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
CALVIN TRAN
09/05/2025
Special inspection requirement — Maintenance information
CALVIN TRAN
09/05/2025
Special inspection requirement — Energy Code Compliance Inspections
CALVIN TRAN
09/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SIMON JIANG
09/05/2025
Special inspection requirement — Energy Code Compliance Inspections
CALVIN TRAN
09/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
CALVIN TRAN
09/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
CALVIN TRAN
09/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
CALVIN TRAN
08/29/2025
Special inspection requirement — Final
CALVIN TRAN
08/29/2025
Special inspection requirement — Mechanical Systems
SIMON JIANG
06/11/2025
Violation issued (HPD, closed)
A
12/02/2024
Violation issued (HPD, closed)
I
04/12/2024
Violation issued (HPD, closed)
A
01/11/2024
Violation issued (HPD, open)
B
01/11/2024
Violation issued (HPD, open)
C
01/11/2024
Violation issued (HPD, open)
B
11/24/2023
Violation issued (HPD, closed)
I
03/27/2023
Violation issued (HPD, closed)
A
12/02/2022
Signed off — Alteration
REPLACE BOILER AND OIL BURNER
Q00656898-I1
11/15/2022
Violation issued (HPD, closed)
I
08/31/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/22/2022
Permit issued — Boiler Equipment
Q00656898-I1-BE
03/03/2022
Violation issued (HPD, closed)
A
03/03/2022
Violation issued (HPD, closed)
I
02/07/2022
Filed — Alteration
REPLACE BOILER AND OIL BURNER
Q00656898-I1
01/24/2022
Special inspection requirement — Heating Systems
LOUIS ARENA
01/04/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
01/04/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
01/04/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
01/04/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
04/14/2021
Violation issued (HPD, closed)
I
04/14/2021
Violation issued (HPD, closed)
A
11/01/2019
Violation issued (HPD, closed)
I
10/22/2018
Violation issued (HPD, closed)
I
07/31/2012
Violation issued (ECB, closed)
Construction
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/28/2003
Violation issued (DOB, open)
VPW-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-ACTIVE
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedMORELL BUILDERS INC06/12/2026
DOB NOWPlumbingPermit IssuedALL PRO PLBG & HTG INC02/17/2026
DOB NOWGeneral ConstructionSigned-offMORELL BUILDERS INC02/04/2026
DOB NOWBoiler EquipmentSigned-offALLISON A. HEANEY03/22/2022
BISEQISSUEDMSS CONSTRUCTION CORP07/23/2007
1 project · most recent 11/12/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/12/2025Permit IssuedMORELL BUILDERS INCHeating and Air Conditioning Systems
Heat / Cool
Cooper & Hunter CH-HPR36M 37,000 BTU · Condensing Unit ×4
1 project · most recent 11/12/2025
Gas Water/Sanitary
FiledStatusContractorScope
11/12/2025Permit IssuedALL PRO PLBG & HTG INCGas, Water/Sanitary
1 project · most recent 02/18/2026
General Wiring
FiledStatusContractorScope
02/18/2026Permit IssuedACCURATE ELEC'L CORP.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/23/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/31/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
09/05/2025Maintenance informationCALVIN TRANenergy_progress
09/05/2025Duct leakage testing, insulation and designCALVIN TRANenergy_progress
09/05/2025Fire-Resistance Rated ConstructionCALVIN TRANprogress
09/05/2025Lighting in dwelling unitsCALVIN TRANenergy_progress
09/05/2025Lighting controlsCALVIN TRANenergy_progress
09/05/2025MeteringCALVIN TRANenergy_progress
09/05/2025Interior lighting powerCALVIN TRANenergy_progress
09/05/2025Energy Code Compliance InspectionsCALVIN TRANprogress
09/05/2025HVAC-R and service water piping design and insulationCALVIN TRANenergy_progress
09/05/2025Maintenance informationCALVIN TRANenergy_progress
09/05/2025Energy Code Compliance InspectionsCALVIN TRANprogress
09/05/2025Fire-Resistant Penetrations and JointsSIMON JIANGspecial
09/05/2025Energy Code Compliance InspectionsCALVIN TRANprogress
09/05/2025HVAC-R and service water heating equipmentCALVIN TRANenergy_progress
09/05/2025HVAC-R and service water piping design and insulationCALVIN TRANenergy_progress
09/05/2025HVAC-R and service water heating system controlsCALVIN TRANenergy_progress
08/29/2025FinalCALVIN TRANprogress
08/29/2025Mechanical SystemsSIMON JIANGspecial
01/24/2022Heating SystemsLOUIS ARENAspecial
01/04/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
01/04/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
01/04/2022Maintenance informationLOUIS ARENAenergy_progress
01/04/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/26/2026Q00656898-I1Request digital key ↗
08/18/2026Q01279585-I1Request digital key ↗
08/18/2026Q01279585-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature10
09/29/2026Q01279585-I1Open ↗
09/29/2026Q01279585-I1Open ↗
09/23/2026Q00656898-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/18/2026Q01279585-I1Open ↗
08/18/2026Q01279585-S2Open ↗
08/18/2026Q01279585-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/29/2026Q01279585-I1Open ↗
09/23/2026Q00656898-I1Open ↗
08/29/2026Q01279585-S2Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/18/2026Q01279585-S2Open ↗
08/18/2026Q01279585-P2Open ↗
08/18/2026Q01279585-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00656898-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00656898-I1Open ↗