← Back
BuildNYC
Banking facility, with or without parking
98-16 101ST AVENUE
QUEENS · BIN 4189417
💬 Discuss this project
1977Year Built
1Stories
K7Building Class
R6BZoning
3,360 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Banking facility, with or without parking · Owner of record: Ironbound Investment Company · 12,852 sf lot · 0.26 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofReplacement of two roof top packaged units3p · 1 filing · 3 docs
Site & exteriorFlagstar Bank1p · 2 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Flagstar Bank707/08/2026
Columbia Federal Savings Bank103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Leon Skvirsky PE211/17/2023
Charles G. Michel Engineering107/20/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Building Brothers403/21/2026
JMV Associates203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ultimate Signs & Designs CoSign hanger207/08/2026
New York Community BancorGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Charles G Michel Engineering2871107/20/2020
Building Lifecycle
All (13)Filed (3)Permit Issued (3)Signed Off (3)Violation (3)Special Inspection (1)
04/11/2024
Signed off — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (FLAGSTAR)
Q00931730-I1
04/11/2024
Signed off — Alteration
INSTALL EXTERIOR NON-ILLUMINATED WALL SIGN (FLAGSTAR)
Q00931731-I1
11/30/2023
Permit issued — Sign
Q00931731-I1-SG
11/30/2023
Permit issued — Sign
Q00931730-I1-SG
11/17/2023
Filed — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (FLAGSTAR)
Q00931730-I1
11/17/2023
Filed — Alteration
INSTALL EXTERIOR NON-ILLUMINATED WALL SIGN (FLAGSTAR)
Q00931731-I1
09/10/2023
Special inspection requirement — Final
LEON SKVIRSKY
11/20/2020
Signed off — Alteration
THE REPLACEMENT OF TWO ROOF TOP PACKAGED UNITS.
Q00372092-I1
09/28/2020
Permit issued — Mechanical Systems
Q00372092-I1-MS
07/20/2020
Filed — Alteration
THE REPLACEMENT OF TWO ROOF TOP PACKAGED UNITS.
Q00372092-I1
10/29/2003
Violation issued (ECB, closed)
Construction
02/25/1993
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
02/25/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offUltimate Signs & Designs Co11/30/2023
DOB NOWSignSigned-offUltimate Signs & Designs Co11/30/2023
DOB NOWMechanical SystemsSigned-offNew York Community Bancor09/28/2020
BISMHISSUEDLane Associates04/17/1997
1 project · most recent 04/09/2024
FiledStatusContractorScope
04/09/2024CompleteRainbow Electric Co—
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
09/10/2023FinalLEON SKVIRSKYprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Flagstar BankBank / Financial branchFloor 1
Project Q00931730 Alteration · LOC Issued · 11/17/2023
Project Q00931731 Alteration · LOC Issued · 11/17/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
08/23/2026Q00931731-I1Request digital key ↗
08/23/2026Q00931730-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/28/2026Q00372092-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/23/2026Q00931730-I1Open ↗
08/13/2026Q00372092-I1Open ↗
08/13/2026Q00931731-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026Q00931731-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q00372092-I1Open ↗