← Back
Two family converted from one family
98-29 ALBERT ROAD
QUEENS · BIN 4248952
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R3XZoning
2,524 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · Owner of record: SOUTH OZONE BUILDER AND RENOVATION INC · 2,094 sf lot · 1.21 FAR built · Flood zone X
Locations of Work
Architecture
Floor 28p · 1 filing · 20 docs
Floor 18p · 1 filing · 20 docs
Cellar8p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KAIETEUR CONSTRUCTION203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/04/2025$520K—Private party → SOUTH OZONE BUILDER AND RENOVATION INC$206/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TABRIZ GROUP ENTERPRISES310/14/2025
TABRIZ DESIGN GROUP310/03/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TABRIZ GROUP ENTERPRISE603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KAIETEUR CONSTRUCTION INC.General Contractor304/09/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TABRIZ GROUP ENTERPRISES3275510/14/2025
IP CONCRETE TESTING AND I6252210/03/2025
Building Lifecycle
All (51)Filed (6)Permit Issued (3)Signed Off (2)Violation (3)Inspection (7)Special Inspection (30)
04/02/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/04/2025
Signed off — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT# Q01188195.
Q01217974-I1
11/07/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/20/2025
Special inspection requirement — Insulation placement and R values
BAKHTIAR SHAMLOO
10/20/2025
Special inspection requirement — Masonry
BAKHTIAR SHAMLOO
10/20/2025
Special inspection requirement — Concrete - Cast-In-Place
BAKHTIAR SHAMLOO
10/20/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
BAKHTIAR SHAMLOO
10/20/2025
Special inspection requirement — Energy Code Compliance Inspections
BAKHTIAR SHAMLOO
10/20/2025
Special inspection requirement — Interior lighting power
BAKHTIAR SHAMLOO
10/20/2025
Special inspection requirement — Footing and Foundation
BAKHTIAR SHAMLOO
10/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
BAKHTIAR SHAMLOO
10/20/2025
Special inspection requirement — Final
HARI SONI
10/20/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
INDARDEO PARBHUNATH
10/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
10/20/2025
Special inspection requirement — Air barrier — testing
BAKHTIAR SHAMLOO
10/20/2025
Special inspection requirement — Electric vehicle service equipment requirements
BAKHTIAR SHAMLOO
10/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
10/20/2025
Special inspection requirement — Air barrier - visual inspection
BAKHTIAR SHAMLOO
10/20/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
BAKHTIAR SHAMLOO
10/20/2025
Special inspection requirement — Fenestration air leakage
BAKHTIAR SHAMLOO
10/20/2025
Special inspection requirement — Metering
BAKHTIAR SHAMLOO
10/20/2025
Special inspection requirement — Maintenance information
BAKHTIAR SHAMLOO
10/20/2025
Special inspection requirement — Permanent certificate
BAKHTIAR SHAMLOO
10/20/2025
Special inspection requirement — Fenestration areas
BAKHTIAR SHAMLOO
10/14/2025
Filed — Alteration CO
Q01188195-P2
10/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
10/14/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
BAKHTIAR SHAMLOO
10/14/2025
Special inspection requirement — Masonry
BAKHTIAR SHAMLOO
10/14/2025
Special inspection requirement — Concrete - Cast-In-Place
BAKHTIAR SHAMLOO
10/14/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
10/14/2025
Special inspection requirement — Energy Code Compliance Inspections
BAKHTIAR SHAMLOO
10/14/2025
Special inspection requirement — Final
HARI SONI
10/14/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
INDARDEO PARBHUNATH
10/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
BAKHTIAR SHAMLOO
10/09/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/03/2025
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT# Q01188195.
Q01217974-P1
09/16/2025
Filed — Alteration CO
Q01188195-P1
09/16/2025
Signed off — Alteration
Q01188220-I1
07/14/2025
Violation issued (ECB, closed)
Construction
07/14/2025
Violation issued (ECB, closed)
Unknown
07/02/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/02/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
07/02/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/13/2025
Permit issued — Plumbing
Q01217974-I1-PL
05/08/2025
Permit issued — Construction Fence
Q01188220-I1-FN
05/08/2025
Permit issued — General Construction
Q01188195-I1-GC-CX
05/05/2025
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT# Q01188195.
Q01217974-I1
05/05/2025
Filed — Alteration
Q01188220-I1
03/11/2025
Filed — Alteration CO
Q01188195-I1
10/16/1993
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR05/13/2025
DOB NOWConstruction FenceSigned-offKAIETEUR CONSTRUCTION INC05/08/2025
DOB NOWGeneral ConstructionPermit IssuedKAIETEUR CONSTRUCTION INC05/08/2025
2 projects · most recent 03/20/2026
General Wiring
FiledStatusContractorScope
03/20/2026CompleteINFINITI ELECTRIC CORP4 meters, 1 new_meters
05/16/2025CompleteINDY ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/02/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/07/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/09/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/02/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/02/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/02/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 69
DateRequirementInspectorRole
10/20/2025Excavations - Sheeting, Shoring, and BracingBAKHTIAR SHAMLOOspecial
10/20/2025Subsurface Investigations (Borings/Test Pits)INDARDEO PARBHUNATHspecial
10/20/2025Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
10/20/2025Concrete - Cast-In-PlaceBAKHTIAR SHAMLOOspecial
10/20/2025MasonryBAKHTIAR SHAMLOOspecial
10/20/2025Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
10/20/2025Energy Code Compliance InspectionsBAKHTIAR SHAMLOOprogress
10/20/2025Footing and FoundationBAKHTIAR SHAMLOOprogress
10/20/2025Fire-Resistance Rated ConstructionBAKHTIAR SHAMLOOprogress
10/20/2025FinalHARI SONIprogress
10/20/2025Fenestration areasBAKHTIAR SHAMLOOenergy_progress
10/20/2025Interior lighting powerBAKHTIAR SHAMLOOenergy_progress
10/20/2025Electric vehicle service equipment requirementsBAKHTIAR SHAMLOOenergy_progress
10/20/2025Air barrier — testing BAKHTIAR SHAMLOOenergy_progress
10/20/2025Insulation placement and R valuesBAKHTIAR SHAMLOOenergy_progress
10/20/2025Air barrier - visual inspectionBAKHTIAR SHAMLOOenergy_progress
10/20/2025Fenestration and door U-factor and product ratingsBAKHTIAR SHAMLOOenergy_progress
10/20/2025Fenestration air leakageBAKHTIAR SHAMLOOenergy_progress
10/20/2025MeteringBAKHTIAR SHAMLOOenergy_progress
10/20/2025Maintenance informationBAKHTIAR SHAMLOOenergy_progress
10/20/2025Permanent certificateBAKHTIAR SHAMLOOenergy_progress
10/14/2025FinalHARI SONIprogress
10/14/2025Concrete - Cast-In-PlaceBAKHTIAR SHAMLOOspecial
10/14/2025Excavations - Sheeting, Shoring, and BracingBAKHTIAR SHAMLOOspecial
10/14/2025Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
Latest 25 of 69.
▾Documents — 66 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/20/2026Q01188220-I1Request digital key ↗
08/20/2026Q01217974-I1Request digital key ↗
08/20/2026Q01217974-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
08/18/2026Q01188195-P2Open ↗
08/13/2026Q01188195-I1Open ↗
08/13/2026Q01188195-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/18/2026Q01188195-P2Open ↗
08/13/2026Q01188195-I1Open ↗
08/13/2026Q01188195-P1Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature12
08/31/2026Q01188195-P2Open ↗
08/31/2026Q01188195-P2Open ↗
08/31/2026Q01188195-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
08/31/2026Q01188195-P2Open ↗
08/31/2026Q01188195-P2Open ↗
08/30/2026Q01217974-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/20/2026Q01188220-I1Open ↗
08/20/2026Q01217974-I1Open ↗
08/20/2026Q01217974-P1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/18/2026Q01188195-P2Open ↗
08/18/2026Q01188195-P1Open ↗
08/18/2026Q01188195-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/20/2026Q01217974-P1Open ↗
08/20/2026Q01217974-I1Open ↗
08/18/2026Q01188195-I1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/18/2026Q01188195-P2Open ↗
08/13/2026Q01188195-P1Open ↗
08/13/2026Q01188195-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01188195-I1Open ↗
▸Other Documents14
▸DOB NOWSite Survey: Initial3
08/18/2026Q01188195-P2Open ↗
08/13/2026Q01188195-I1Open ↗
08/13/2026Q01188195-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/18/2026Q01188195-P2Open ↗
08/13/2026Q01188195-P1Open ↗
08/13/2026Q01188195-I1Open ↗
▸DOB NOWPlot Diagram3
08/18/2026Q01188195-P2Open ↗
08/13/2026Q01188195-I1Open ↗
08/13/2026Q01188195-P1Open ↗
▸DOB NOWProperty Ownership Certification3
08/18/2026Q01188195-P2Open ↗
08/18/2026Q01188195-P1Open ↗
08/18/2026Q01188195-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01188195-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01188195-I1Open ↗