← Back
BuildNYC
Elevator cooperative
98-33 64TH AVENUE
QUEENS · Rego Park · BIN 4431972
💬 Discuss this project
1949Year Built
8Stories
D4Building Class
R7-1Zoning
141,920 sfGross Floor Area
144Units
LL97 CoveredRent Stabilized51 Active Violations 49 unresolved · 2 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: Walden Terrace · 32,400 sf lot · 4.38 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofWalden Terrace INC.4p · 1 filing · 13 docs
CellarWalden Terrace, INC.Under Construction8p · 2 filings · 11 docs
Sub-CellarWalden Terrace, INC.Under Construction6p · 1 filing · 8 docs
BasementWalden Terrace INC.1p · 1 filing · 13 docs
Filed — no permit issuedAras Properties3p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Walden Terrace4307/04/2026
Aras Properties203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Chun Engineering Consultant307/23/2026
NY Building Associates210/04/2024
Carusone & Cherres Architects204/22/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S R Solar Design403/21/2026
AB Works Processing203/21/2026
Cavalry203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Power Surge ElectricElectrical303/21/2026
Voltair SolarGeneral Contractor303/21/2026
Maxwell Plumbing MechanicalFire Protection207/03/2026
Maxwell Plumbing MechanicalPlumbing207/04/2026
M & S Electrical Contng Services IElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Chun Engineering Consulta9605307/23/2026
NKM Engineering6244210/04/2024
Building Lifecycle
All (101)Filed (7)Permit Issued (5)Signed Off (1)Facade (FISP) (12)Violation (60)Special Inspection (16)
07/24/2026
Special inspection requirement — Post-installed Anchors
JAMES CHUN
07/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES CHUN
07/23/2026
Filed — Alteration
PLUMBING FILING TO PROPOSE 4 NEW WASHING MACHINES, 3 NEW GAS DRYERS, 3 NEW ELECTRIC DRYERS, AND 1 NEW UTILITY SINK IN THE CELLAR
Q01179817-P1
07/02/2026
Permit issued — Plumbing
Q01179817-I1-PL
07/01/2026
Permit issued — Sprinklers
Q01179825-I1-EW-SP
05/14/2026
Special inspection requirement — Post-installed Anchors
JAMES CHUN
05/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES CHUN
03/02/2026
Violation issued (HPD, open)
C
02/18/2026
Violation issued (HPD, open)
C
01/14/2026
Violation issued (HPD, open)
B
01/14/2026
Violation issued (HPD, closed)
C
01/14/2026
Violation issued (HPD, open)
B
01/14/2026
Violation issued (HPD, open)
C
12/20/2025
Violation issued (HPD, closed)
C
12/13/2025
Violation issued (HPD, open)
C
12/13/2025
Violation issued (HPD, open)
C
12/08/2025
Violation issued (HPD, open)
B
12/08/2025
Violation issued (HPD, open)
B
11/14/2025
Violation issued (HPD, closed)
C
11/14/2025
Violation issued (HPD, closed)
C
11/14/2025
Violation issued (HPD, open)
C
11/14/2025
Violation issued (HPD, open)
C
11/14/2025
Violation issued (HPD, closed)
C
11/13/2025
Violation issued (HPD, closed)
C
11/13/2025
Violation issued (HPD, closed)
C
11/08/2025
Violation issued (HPD, closed)
C
11/02/2025
Violation issued (HPD, open)
A
11/02/2025
Violation issued (HPD, open)
B
11/02/2025
Violation issued (HPD, closed)
C
10/13/2025
Violation issued (HPD, closed)
C
07/31/2025
Violation issued (ECB, open)
Construction
07/01/2025
Permit issued — Plumbing
Q01179817-I1-PL
07/01/2025
Permit issued — Sprinklers
Q01179825-I1-EW-SP
06/13/2025
Violation issued (HPD, closed)
A
05/25/2025
Violation issued (HPD, closed)
C
04/07/2025
Filed — Alteration
SPRINKLER FILING TO PROPOSE 3 NEW AUTOMATIC WET SPRINKLER HEADS NEAR THE DRYERS IN THE CELLAR TO CONNECT TO EXISTING GARAGE SPRINKLER SYSTEMS
Q01179825-I1
04/07/2025
Filed — Alteration
PLUMBING FILING TO PROPOSE 4 NEW WASHING MACHINES, 3 NEW GAS DRYERS, 3 NEW ELECTRIC DRYERS, AND 1 NEW UTILITY SINK IN THE CELLAR
Q01179817-I1
03/30/2025
Violation issued (HPD, open)
C
03/30/2025
Violation issued (HPD, open)
C
01/23/2025
Violation issued (HPD, closed)
C
01/23/2025
Violation issued (HPD, open)
B
01/23/2025
Violation issued (HPD, open)
A
01/17/2025
Violation issued (HPD, open)
C
01/17/2025
Violation issued (HPD, open)
B
01/17/2025
Violation issued (HPD, open)
B
01/16/2025
Violation issued (HPD, closed)
C
01/16/2025
Violation issued (HPD, closed)
C
01/16/2025
Violation issued (HPD, open)
B
01/16/2025
Violation issued (HPD, closed)
C
01/16/2025
Violation issued (HPD, open)
C
01/16/2025
Violation issued (HPD, open)
B
01/16/2025
Violation issued (HPD, open)
C
01/16/2025
Violation issued (HPD, closed)
C
01/16/2025
Violation issued (HPD, open)
B
01/16/2025
Violation issued (HPD, open)
B
01/16/2025
Violation issued (HPD, open)
C
01/16/2025
Violation issued (HPD, open)
B
01/16/2025
Violation issued (HPD, open)
B
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedMaxwell Plumbing Mechanical07/02/2026
DOB NOWSprinklersPermit IssuedMaxwell Plumbing Mechanical07/01/2026
DOB NOWPlumbingPermit IssuedMaxwell Plumbing Mechanical07/01/2025
DOB NOWSprinklersPermit IssuedMaxwell Plumbing Mechanical07/01/2025
DOB NOWSolarSigned-offVoltair Solar06/24/2024
BISEQISSUEDCS Bridge05/02/2017
BISOTISSUEDStar-Cel Waterproofing04/25/2017
BISBLISSUEDAbilene08/28/2015
BISPLISSUEDBell Fuel Oil08/28/2015
BISFSISSUEDStar Industrial Service04/15/2011
BISPLISSUEDJoseph Ferrigno P&H Co04/15/2011
BISOTISSUEDPhoenix Construction01/12/2008
BISEQISSUEDPhoenix 132 Sutton St01/12/2008
BISOTISSUEDPhoenix Construction04/19/2007
BISEQISSUEDPhoenix 132 Sutton St02/22/2007
BISFBISSUEDStar Industrial Service Co06/26/2000
BISFBISSUEDEmpire State Fuel08/03/1992
1 project · most recent 04/07/2025
FiledStatusContractorScope
04/07/2025Permit IssuedMaxwell Plumbing Mechanical3 heads
1 project · most recent 07/23/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/23/2026Permit IssuedMaxwell Plumbing MechanicalGas, Water/Sanitary
6 projects · most recent 12/12/2025
General Wiring
FiledStatusContractorScope
12/12/2025CompleteHunter Electric—
09/15/2025CompleteCsi Sec & ElectricGeneral Wiring
12/27/2024CompleteM & S Electrical Contng Services IGeneral Wiring
11/12/2024Permit IssuedTitan Electrical & Elev Contracting—
07/10/2024CompleteB.P. Electric—
03/29/2021Permit IssuedBDS ElectricGeneral Wiring
1 project · most recent 04/22/2024
Fence
FiledStatusContractorScope
04/22/2024——Fence
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
07/24/2026Post-installed AnchorsJAMES CHUNspecial
07/24/2026Tenant Protection Plan Compliance—special
07/24/2026Fire-Resistant Penetrations and JointsJAMES CHUNspecial
05/14/2026Post-installed AnchorsJAMES CHUNspecial
05/14/2026Tenant Protection Plan Compliance—special
05/14/2026Fire-Resistant Penetrations and JointsJAMES CHUNspecial
10/15/2024Energy Code Compliance InspectionsNARESH MAHANGUprogress
10/15/2024Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
10/15/2024Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
10/15/2024FinalNARESH MAHANGUprogress
10/15/2024Air barrier - visual inspectionNARESH MAHANGUenergy_progress
10/04/2024Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
10/04/2024Air barrier - visual inspectionNARESH MAHANGUenergy_progress
10/04/2024FinalNARESH MAHANGUprogress
10/04/2024Energy Code Compliance InspectionsNARESH MAHANGUprogress
10/04/2024Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
▾Documents — 91 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026Q01032928-P1Request digital key ↗
08/23/2026Q01032928-I1Request digital key ↗
08/22/2026Q01033866-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits12
▸BISWORK PERMIT APPLICATION6
04/27/2017421474103Open ↗
04/26/2017440400941Open ↗
08/27/2015440247074Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
08/05/2021421790333Open ↗
04/27/2017421474103Open ↗
04/26/2017440400941Open ↗
Showing 3 of 5 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
11/15/2017440400941Open ↗
▸Seals & Professional Certifications28
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/22/2026Q01033866-I1Open ↗
08/22/2026Q01033860-I1Open ↗
08/20/2026Q01179817-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/26/2026Q01032928-I1Open ↗
08/26/2026Q01032928-I1Open ↗
08/23/2026Q01032928-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026Q01179817-I1Open ↗
08/26/2026Q01179817-P1Open ↗
08/26/2026Q01032928-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
04/27/2017421474103Open ↗
04/26/2017440400941Open ↗
08/27/2015440247074Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
11/15/2017421474103Open ↗
04/27/2017421474103Open ↗
04/16/2011420344782Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
04/26/2017440400941Open ↗
08/27/2015440247074Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
04/26/2017440400941Open ↗
08/27/2015440247074Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/27/2017421474103Open ↗
04/16/2011420344782Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/16/2011420344782Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
08/27/2015440247074Open ↗
04/16/2011420344782Open ↗
▸BISSCHEDULE B - PLUMBING2
08/27/2015440247074Open ↗
04/16/2011420344782Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
06/10/2014420344782Open ↗
05/27/2011420344782Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
04/26/2017440400941Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/20/2026Q01179817-P1Open ↗
08/20/2026Q01179817-I1Open ↗
08/13/2026Q01032928-P1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
04/27/2017421474103Open ↗
08/27/2015440247074Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/16/2011420344782Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
11/15/2017421474103Open ↗
04/27/2017421474103Open ↗
04/22/2016440247074Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
11/15/2017421474103Open ↗
04/22/2016440247074Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/27/2015440247074Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
04/26/2017440400941Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/27/2015440247074Open ↗
▸BISTECHNICAL REPORT: ENERGY1
04/16/2011420344782Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/27/2015440247074Open ↗
▸Approvals, Objections & Sign-offs7
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
11/17/2017421474103Open ↗
11/15/2017440400941Open ↗
04/22/2016440247074Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
08/05/2021421790333Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/22/2016440247074Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
04/16/2011420344782Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01032928-I1Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
11/15/2017421474103Open ↗
04/27/2017421474103Open ↗
04/22/2016440247074Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET3
08/05/2021421790333Open ↗
04/27/2017421474103Open ↗
04/16/2011420344782Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
04/26/2017440400941Open ↗
08/27/2015440247074Open ↗
▸BISBOROUGH INTAKE FORM2
11/17/2017421474103Open ↗
11/15/2017440400941Open ↗