Roof6p · 3 filings · 19 docs
EquipmentGeneralMechanicalPlumbingStructural
INSTALLATION OF TEMPORARY AIR-PRESSURIZED ALARM SYSTEM FOR DRY STANDPIPE SYSTEM DURING CONSTRUCTION IN CONJUNCTION WITH NB# 420664169
On file for this project
6 documents · 1 drawing sheet
INSTALLATION AND USE OF TEMPORARY SUSPENDED SCAFFOLDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
9 documents · 1 drawing sheet
INSTALLATION OF ROOF PROTECTION FOR ADJACENT PROPERTY DURING CONSTRUCTION. ROOF PROTECTION SHALL COMPLY WITH NYCC 2014 CHAPTER 33 . NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
4 documents · 4 drawing sheets
Floor 191p · 1 filing · 6 docs
Plumbing
INSTALLATION OF TEMPORARY AIR-PRESSURIZED ALARM SYSTEM FOR DRY STANDPIPE SYSTEM DURING CONSTRUCTION IN CONJUNCTION WITH NB# 420664169
On file for this project
6 documents · 1 drawing sheet
Floor 181p · 1 filing · 6 docs
Plumbing
INSTALLATION OF TEMPORARY AIR-PRESSURIZED ALARM SYSTEM FOR DRY STANDPIPE SYSTEM DURING CONSTRUCTION IN CONJUNCTION WITH NB# 420664169
On file for this project
6 documents · 1 drawing sheet
Floor 171p · 1 filing · 6 docs
Plumbing
INSTALLATION OF TEMPORARY AIR-PRESSURIZED ALARM SYSTEM FOR DRY STANDPIPE SYSTEM DURING CONSTRUCTION IN CONJUNCTION WITH NB# 420664169
On file for this project
6 documents · 1 drawing sheet
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 71p · 1 filing · 6 docs
Plumbing
INSTALLATION OF TEMPORARY AIR-PRESSURIZED ALARM SYSTEM FOR DRY STANDPIPE SYSTEM DURING CONSTRUCTION IN CONJUNCTION WITH NB# 420664169
On file for this project
6 documents · 1 drawing sheet
Floor 641p · 2 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems
subsequent filing for sprinkler work on 4th floor tenant build out
On file for this project
44 documents · 3 drawing sheets
subsequent filing for sprinkler work on 5th floor tenant build out
On file for this project
38 documents · 1 drawing sheet
Floor 520p · 2 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Sprinklers
subsequent filing for sprinkler work on 5th floor tenant build out
On file for this project
38 documents · 14 drawing sheets
INSTALLATION OF TEMPORARY AIR-PRESSURIZED ALARM SYSTEM FOR DRY STANDPIPE SYSTEM DURING CONSTRUCTION IN CONJUNCTION WITH NB# 420664169
On file for this project
6 documents · 1 drawing sheet
Floor 4Under Construction91p · 9 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
TENANT INTERIOR FIT-OUT OF EXISTING SHELL SPACE TO INCLUDE REMOVAL AND INSTALLATION OF PARTITION, DUCT LAYOUT FOR MECHANICAL WORK AND PLUMBING FIXTURE. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
On file for this project
9 documents · 1 drawing sheet
Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
3 documents · 2 drawing sheets
THE SCOPE OF THIS PROJECT IS TO INSTALL NEW DISTRIBUTION OF DOMESTIC ANDSANITARY PIPING THROUGHOUT THE SPACE TO TIE-INTO EXISTING PIPING. THERE WILLBE NO CHANGE TO OCCUPANY, USE, OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 3Under Construction7p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Mechanical Systems
Subsequent filing for plumbing work on 1st floor (98-12 Queens Blvd) tenant build out
On file for this project
17 documents
Subsequent filing for mechanical work on 1st floor (98-14 Queens Blvd) tenant build out. Installation of mechanical equipment on 3rd floor
On file for this project
16 documents
INSTALLATION OF TEMPORARY AIR-PRESSURIZED ALARM SYSTEM FOR DRY STANDPIPE SYSTEM DURING CONSTRUCTION IN CONJUNCTION WITH NB# 420664169
On file for this project
6 documents · 1 drawing sheet
Floor 21p · 1 filing · 6 docs
Plumbing
INSTALLATION OF TEMPORARY AIR-PRESSURIZED ALARM SYSTEM FOR DRY STANDPIPE SYSTEM DURING CONSTRUCTION IN CONJUNCTION WITH NB# 420664169
On file for this project
6 documents · 1 drawing sheet
Floor 1Under Construction13p · 5 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Subsequent filing for plumbing work on 1st floor (98-12 Queens Blvd) tenant build out
On file for this project
17 documents · 3 drawing sheets
Subsequent filing for mechanical work on 1st floor (98-14 Queens Blvd) tenant build out. Installation of mechanical equipment on 3rd floor
On file for this project
16 documents · 6 drawing sheets
Filing mechanical work
On file for this project
7 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Cellar2p · 2 filings · 8 docs
ArchitectureFire Protection
FILING MODIFICATION ON FLOOR RISER CONTROL VALVE - FIRST FLOOR, FOR TENANT SPACE, IN CONJUNCTION WITH NB #420664169.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY AIR-PRESSURIZED ALARM SYSTEM FOR DRY STANDPIPE SYSTEM DURING CONSTRUCTION IN CONJUNCTION WITH NB# 420664169
On file for this project
6 documents · 1 drawing sheet
Sub-Cellar1p · 1 filing · 6 docs
Plumbing
INSTALLATION OF TEMPORARY AIR-PRESSURIZED ALARM SYSTEM FOR DRY STANDPIPE SYSTEM DURING CONSTRUCTION IN CONJUNCTION WITH NB# 420664169