← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
The Trylon Condominium
98-81 QUEENS BOULEVARD · BIN 4625213
💬 Discuss this project
2022Year Built
16Stories
RMBuilding Class
R8XZoning
212,720 sfGross Floor Area
257Units
Rent Stabilized25 Open Violations ▸
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: TRYLON, LLC · 21,472 sf lot · 9.91 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 18 docs
Bulkhead1p · 1 filing · 4 docs
Floor 2Under Construction13p · 3 filings · 20 docs
Floor 1Under Construction13p · 6 filings · 20 docs
CellarUnder Construction13p · 1 filing · 20 docs
4 jobs · most recent 04/14/2026
Heating and Air Conditioning Systems Ventilation Systems Generators Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/14/2026——Heating and Air Conditioning Systems
Heat / Cool
04/13/2026Permit IssuedANSUMA INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM36NL 3 tons · Heat Pump Outdoor ×1
PUZ-AK36NL 3 tons · Split System ×1
10/21/2025Signed-offK S K CONSTRUCTION GROUPGenerators, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PURY-EP96TNU-A 8 tons · Vrf Outdoor ×30
PURY-EP-120TNU-A 10 tons · Vrf Outdoor ×26
PURY-EP-144TNU-A 12 tons · Vrf Outdoor ×10
PURY-EP-168TNU-A 14 tons · Vrf Outdoor ×8
MXZ-SM48NAM-U1 4 tons · Heat Pump Outdoor ×2
PUHY-P72TNU-A 6 tons · Vrf Outdoor ×2
PURY-EP-96TNU-A 8 tons · Vrf Outdoor ×2
PUZ-A12NKA7 1 tons · Heat Pump Outdoor ×2
PUZ-A24NHA7 2 tons · Heat Pump Outdoor ×2
Ventilation
Mitsubishi Electric PURY-EP-120TNU-A 10 tons · Vrf Outdoor ×2
PURY-EP-96TNU-A 8 tons · Vrf Outdoor ×2
PURY-EP72TNU-A 6 tons · Vrf Outdoor ×2
Generators
Generac SG150 150 kW · Generator ×2
04/10/2025Signed-offDIMEX GROUP INCAir Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric Mitsubishi PEFY-P36NMAU-E4 36,000 BTU · Vrf Indoor ×1
Mitsubishi PEFY-P48NMAU-E4 48,000 BTU · Vrf Indoor ×1
Mitsubishi PURY-EP96TNY-A1 96,000 BTU · Vrf Outdoor ×1
Heat / Cool
Mitsubishi Electric Mitsubishi PEFY-P48NMAU-E4 96,000 BTU · Vrf Indoor ×1
Ventilation
Greenheck GREENHECK SP-80-VG 300 kW · Exhaust Fan ×1
5 jobs · most recent 04/14/2026
Sprinkler System
FiledStatusContractorScope
04/14/2026——5 heads
04/13/2026——16 heads
10/21/2025Signed-offMEJ PLUMBING LLCSprinkler System
04/10/2025Signed-offORBIT SPRINKLER CORPSprinkler System
02/17/2025Signed-offCMA PLUMBING & HEATING IN36 heads
3 jobs · most recent 04/13/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
04/13/2026Signed-offM & M PIPING AND HEATINGWater/Sanitary
10/21/2025Signed-offMEJ PLUMBING LLCGas, Storm, Water/Sanitary
04/10/2025Signed-offALTAIR PLUMBING AND HEATWater/Sanitary
17 jobs · most recent 06/04/2026
General Wiring
FiledStatusContractorScope
06/04/2026Permit IssuedPROJECT ONE ELECTRIC INCGeneral Wiring
03/31/2026CompleteCL ELECTRICAL CORPGeneral Wiring
03/14/2026CompleteJONG HYUN KIM—
03/14/2026CompleteJONG HYUN KIM—
03/14/2026CompleteJONG HYUN KIM—
08/11/2025CompleteKINGS ELECTRIC CO., INC.General Wiring
07/18/2025CompleteELECTRICAL SVCS & CONS GPGeneral Wiring
02/24/2025CompleteBORRELLI ELECTRIC INCGeneral Wiring
11/26/2024CompleteTUXEDO ELEC'L CONTR'G INC—
08/16/2024CompleteSKF ELECTRICAL CORPGeneral Wiring
10/25/2023Complete.UXEDO ELEC'L CONTR'G INC—
06/05/2023CompleteNASH ELECTRIC SERVICES IN—
02/22/2023CompleteNASH ELECTRIC SERVICES IN—
09/29/2022CompleteSKF ELECTRICAL CORP1 meters, 1 new_meters
05/04/2022CompleteNASH ELECTRIC SERVICES IN—
1 job · most recent 10/21/2025
Steel Concrete
FiledStatusContractorScope
10/21/2025Signed-offK S K CONSTRUCTION GROUPSteel, Concrete
1 job · most recent 10/21/2025
Fence
FiledStatusContractorScope
10/21/2025Signed-offK S K CONSTRUCTION GROUPFence
Building Lifecycle
All (300)Filed (54)Permit Issued (52)Signed Off (41)Violation (11)Inspection (35)Objection (77)Special Inspection (30)
09/17/2026
Objection raised — Other
09/17/2026
Objection raised — Other
09/17/2026
Objection raised — Other
09/06/2026
Filed — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN "TRYLON PHARMACY" . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01374866-I1
06/23/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/22/2026
Signed off — Alteration
Interior renovations as per plans filed herewith, (98-89 Queens Blvd, tenant build out) no change in use, egress or occupancy under this application
Q01156822-I1
05/19/2026
Signed off — Alteration
HEREWITH FILE ALTERATION TO THE INTERIOR OF THE TENANT SPACE LOCATED ON THE FIRST FLOOR. TO ERECT INTERIOR PARTITIONS. PLUMBING, MECHANICAL, SPRINKLER TO BE FILED SUBSEQUENTLY AND TO OBTAIN A LETTER OFF COMPLETION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Q01186141-S1
05/19/2026
Permit issued — Plumbing
Q01343027-S3-PL
05/14/2026
Signed off — Alteration
HEREWITH FILE ALTERATION TO THE INTERIOR OF THE TENANT SPACE LOCATED ON THE FIRST FLOOR. TO ERECT INTERIOR PARTITIONS. PLUMBING, MECHANICAL, SPRINKLER TO BE FILED SUBSEQUENTLY AND TO OBTAIN A LETTER OFF COMPLETION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Q01186141-S2
05/13/2026
Violation issued (ECB, open)
Construction
05/11/2026
Permit issued — Mechanical Systems
Q01343027-S1-MS
04/20/2026
Permit issued — General Construction
Q01343027-I1-GC
04/14/2026
Filed — Alteration
SPRINKLER SYSTEM ALTERATION FOR TENANT FIT OUT OF EXISTING SPACE.
Q01362324-S1
04/14/2026
Filed — Alteration
SPRINKLER SYSTEM ALTERATION FOR TENANT FIT OUT OF EXISTING SPACE.
Q01362324-S2
04/14/2026
Special inspection requirement — Maintenance information
04/14/2026
Special inspection requirement — Shutoff dampers
04/14/2026
Special inspection requirement — HVAC-R and service water heating equipment
04/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
04/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/14/2026
Special inspection requirement — Duct leakage testing, insulation and design
04/13/2026
Filed — Alteration
HEREWITH FILING TO PROPOSE MINOR INTERIOR RENOVATION TO EXISTING B GROUP BUSINESS SPACE - NO CHANGE IN USE, OCCUPANCY, OR BULK;SPACE ORIGINALLY BUILT UNDER NB# Q00607526-I1
Q01343027-S3
04/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JEFFREY BELL
04/10/2026
Special inspection requirement — Tenant Protection Plan Compliance
Luis Pichardo
04/10/2026
Special inspection requirement — Energy Code Compliance Inspections
JEFFREY BELL
03/31/2026
Special inspection requirement — Final
03/31/2026
Special inspection requirement — Mechanical Systems
03/29/2026
Filed — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN "MOSES LAW GROUP" . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01368205-I1
03/29/2026
Filed — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN "PURE ARTS" . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01374889-I1
03/19/2026
Special inspection requirement — Final
03/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/19/2026
Special inspection requirement — Post-installed Anchors
JIN HWAN CHO
03/19/2026
Special inspection requirement — Post-installed Anchors
03/19/2026
Special inspection requirement — Final
JIN HWAN CHO
03/19/2026
Special inspection requirement — Post-installed Anchors
JIN HWAN CHO
03/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/19/2026
Special inspection requirement — Final
03/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JIN HWAN CHO
03/18/2026
Filed — Alteration
HEREWITH FILING TO PROPOSE MINOR INTERIOR RENOVATION TO EXISTING B GROUP BUSINESS SPACE - NO CHANGE IN USE, OCCUPANCY, OR BULK;SPACE ORIGINALLY BUILT UNDER NB# Q00607526-I1
Q01343027-S1
03/18/2026
Filed — Alteration
HEREWITH FILING TO PROPOSE MINOR INTERIOR RENOVATION TO EXISTING B GROUP BUSINESS SPACE - NO CHANGE IN USE, OCCUPANCY, OR BULK;SPACE ORIGINALLY BUILT UNDER NB# Q00607526-I1
Q01343027-S2
03/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
Luis Pichardo
03/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Luis Pichardo
03/17/2026
Special inspection requirement — Sprinkler Systems
Luis Pichardo
02/27/2026
Objection resolved — Addressed
02/25/2026
Filed — Alteration
SPRINKLER SYSTEM ALTERATION FOR TENANT FIT OUT OF EXISTING SPACE.
Q01362324-I1
02/18/2026
Objection resolved — Addressed
02/18/2026
Objection resolved — Addressed
02/18/2026
Objection resolved — Addressed
02/18/2026
Objection resolved — Addressed
02/18/2026
Special inspection requirement — Final
NAVEEN KUMAR
02/12/2026
Objection raised — Scope
02/12/2026
Objection raised — Other
02/12/2026
Objection raised — Scope
02/12/2026
Objection raised — Other
02/12/2026
Objection raised — Scope
01/28/2026
Signed off — Alteration
subsequent filing for sprinkler work as per plans for tenant build out (66-04 99th Street, space #1)
Q01222790-S3
01/27/2026
Violation issued (ECB, open)
Construction
01/14/2026
Signed off — Alteration
Modification to existing HVAC system as per plans filed herewith. (98-89 Queens Blvd, tenant build out) no change in use, egress or occupancy under this application.
Q01158605-I1
Latest 60 of 300 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RJ CAPITAL CONSTRUCTION11009/22/2026
RJ CAPITAL HOLDINGS8707/08/2026
KSK CONSTRUCTION GROUP2107/08/2026
1ST HOME BROKERAGE103/22/2026
TRYLON, LLC ABRAMOV & SON403/22/2026
TRYLON303/22/2026
NORTHEAST SPECIALIST GROUP103/22/2026
ABRAMS HOLDINGS203/21/2026
99TH ST REALTY503/21/2026
SEMSOM MANAGEMENT403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
K S K CONSTRUCTION GROUPGeneral Contractor3307/08/2026
PRECISION HOIST & SCAFFO*General Contractor1607/08/2026
MEJ PLUMBING LLCFire Protection807/08/2026
MEJ PLUMBING LLCPlumbing707/08/2026
ACTIVE SIGNSScaffold607/08/2026
NORTHEAST SPECIALIST GROUPGeneral Contractor407/08/2026
JKT CONSTRUCTION INCGeneral Contractor207/08/2026
NASH ELECTRIC SERVICES INElectrical203/22/2026
ANSUMA INCGeneral Contractor207/08/2026
DIMEX GROUP INCGeneral Contractor204/09/2026
ALTAIR PLUMBING AND HEATPlumbing207/08/2026
ORBIT SPRINKLERPlumbing203/22/2026
CMA PLUMBING & HEATING INFire Protection107/08/2026
THE METRO GROUP, INCGeneral Contractor107/08/2026
SKF ELECTRICAL CORPElectrical103/22/2026
.UXEDO ELEC'L CONTR'G INCElectrical103/22/2026
M & M PIPING AND HEATINGPlumbing106/28/2026
ELECTRICAL SVCS & CONS GPElectrical103/22/2026
ORBIT SPRINKLER CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDTECH ENGINEERING6369304/13/2026
DELTA TESTING LABS687102/25/2026
HRF SERVICES CORP5616101/09/2026
STRACAR SPECIAL INSPECTIO229511/20/2025
MT GROUP7983910/21/2025
CUSTODIO CONSULTING, LLC1835105/16/2025
AA BUILDING & INSPECTION1519304/10/2025
MILROSE CONSULTANTS LLC2003402/17/2025
M/P/S ENGINEERING PLLC1588102/17/2025
KZ ENGINEERING, P.C.4665108/14/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offM & M PIPING AND HEATING05/19/2026
DOB NOWMechanical SystemsPermit IssuedANSUMA INC05/11/2026
DOB NOWGeneral ConstructionSigned-offANSUMA INC04/20/2026
DOB NOWSuspended ScaffoldSigned-offPRECISION HOIST & SCAFFO*09/24/2025
DOB NOWSprinklersSigned-offORBIT SPRINKLER CORP09/22/2025
DOB NOWMechanical SystemsSigned-offDIMEX GROUP INC07/14/2025
DOB NOWGeneral ConstructionSigned-offDIMEX GROUP INC07/11/2025
DOB NOWPlumbingSigned-offALTAIR PLUMBING AND HEAT07/10/2025
DOB NOWSprinklersSigned-offMEJ PLUMBING LLC06/25/2025
DOB NOWPlumbingSigned-offKAY PLUMBING INC06/16/2025
DOB NOWMechanical SystemsSigned-offK S K CONSTRUCTION GROUP06/16/2025
DOB NOWGeneral ConstructionSigned-offK S K CONSTRUCTION GROUP06/13/2025
DOB NOWPlumbingSigned-offMEJ PLUMBING LLC05/15/2025
DOB NOWSprinklersSigned-offKAY PLUMBING INC05/15/2025
DOB NOWSignSigned-offACTIVE SIGNS INC03/21/2025
DOB NOWSignSigned-offACTIVE SIGNS INC03/21/2025
DOB NOWSignSigned-offACTIVE SIGNS INC03/21/2025
DOB NOWSignSigned-offACTIVE SIGNS INC03/21/2025
DOB NOWSignSigned-offACTIVE SIGNS INC03/21/2025
DOB NOWSignSigned-offACTIVE SIGNS INC03/21/2025
DOB NOWSprinklersSigned-offCMA PLUMBING & HEATING IN03/05/2025
DOB NOWMechanical SystemsSigned-offJKT CONSTRUCTION INC02/25/2025
DOB NOWPlumbingSigned-offKAY PLUMBING INC02/13/2025
DOB NOWGeneral ConstructionSigned-offJKT CONSTRUCTION INC01/27/2025
DOB NOWCurb CutSigned-offK S K CONSTRUCTION GROUP12/27/2024
DOB NOWGeneral ConstructionPermit IssuedK S K CONSTRUCTION GROUP11/19/2024
DOB NOWStructuralSigned-offK S K CONSTRUCTION GROUP10/29/2024
DOB NOWSuspended ScaffoldSigned-offPRECISION HOIST & SCAFFO*08/19/2024
DOB NOWSupported ScaffoldSigned-offPRECISION HOIST & SCAFFO*07/26/2024
DOB NOWProtection and Mechanical MethodsSigned-offPRECISION HOIST & SCAFFO*06/06/2024
DOB NOWSupported ScaffoldSigned-offPRECISION HOIST & SCAFFO*06/05/2024
DOB NOWProtection and Mechanical MethodsSigned-offPRECISION HOIST & SCAFFO*06/05/2024
DOB NOWSupported ScaffoldSigned-offPRECISION HOIST & SCAFFO*06/05/2024
DOB NOWSprinklersSigned-offKAY PLUMBING INC05/20/2024
DOB NOWSprinklersSigned-offMEJ PLUMBING LLC05/16/2024
DOB NOWStandpipeSigned-offMEJ PLUMBING LLC05/16/2024
DOB NOWConstruction FenceSigned-offK S K CONSTRUCTION GROUP04/22/2024
DOB NOWGeneral ConstructionPermit IssuedK S K CONSTRUCTION GROUP04/22/2024
DOB NOWConstruction FenceSigned-offPRECISION HOIST & SCAFFO*03/06/2024
DOB NOWGeneral ConstructionPermit IssuedK S K CONSTRUCTION GROUP02/21/2024
+ 29 more permits on file
▾Field Inspections (DOB CAP) — 37
DateTypeResultReport
06/23/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/11/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/11/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/02/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/28/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/21/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
10/17/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
08/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/23/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/13/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/08/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/02/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
04/02/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/26/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/21/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/26/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/10/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
Latest 25 of 37.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
04/14/2026HVAC-R and service water heating system controls—energy_progress
04/14/2026Fire-Resistant Penetrations and Joints—special
04/14/2026HVAC-R and service water piping design and insulation—energy_progress
04/14/2026Shutoff dampers—energy_progress
04/14/2026Maintenance information—energy_progress
04/14/2026HVAC-R and service water heating equipment—energy_progress
04/14/2026Duct leakage testing, insulation and design—energy_progress
04/12/2026Tenant Protection Plan Compliance—special
04/10/2026Tenant Protection Plan ComplianceLuis Pichardospecial
04/10/2026HVAC-R and service water piping design and insulationJEFFREY BELLenergy_progress
04/10/2026Energy Code Compliance InspectionsJEFFREY BELLprogress
03/31/2026Final—progress
03/31/2026Mechanical Systems—special
03/19/2026Structural Stability – Alterations of existing buildings—special
03/19/2026Post-installed Anchors—special
03/19/2026Final—progress
03/19/2026Post-installed AnchorsJIN HWAN CHOspecial
03/19/2026Structural Stability – Alterations of existing buildings—special
03/19/2026Post-installed AnchorsJIN HWAN CHOspecial
03/19/2026FinalJIN HWAN CHOprogress
03/19/2026Final—progress
03/19/2026Structural Stability – Alterations of existing buildingsJIN HWAN CHOspecial
03/18/2026Tenant Protection Plan ComplianceLuis Pichardospecial
03/17/2026Sprinkler SystemsLuis Pichardospecial
03/17/2026Fire-Resistant Penetrations and JointsLuis Pichardospecial
Latest 25 of 150.
▾Documents — 582 on file (BIS + DOB NOW)
▸Plans & Drawings84
▸DOB NOWPlans/Sketch84
09/22/2026Q01374866-I1Request digital key ↗
08/26/2026Q00696831-I1Request digital key ↗
08/26/2026Q00696881-I1Request digital key ↗
Showing 3 of 84 on file for this type
▸Applications & Permits51
▸BISPLAN / WORK APPROVAL APPLICATION33
10/29/2025420564268Open ↗
06/26/2025421841332Open ↗
02/18/2025440711124Open ↗
Showing 3 of 33 on file for this type
▸BISWORK PERMIT APPLICATION7
05/06/2025440820033Open ↗
01/03/2025440820033Open ↗
10/11/2012420316296Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWHPD - Permit Notice7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
10/01/2024440711124Open ↗
03/15/2023440711124Open ↗
04/28/2022440711124Open ↗
▸BISPLACE OF ASSEMBLY1
01/05/2009410209947Open ↗
▸Zoning, Tax Lot & Property Records19
▸DOB NOWZD1: DOB Zoning Diagram8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWZoning Exhibit form (1-5)8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWRestrictive Declaration/Easement 12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications221
▸DOB NOWDPL-1: Design Professional Seal & Signature84
09/22/2026Q01374866-I1Open ↗
08/26/2026Q00696856-I1Open ↗
08/25/2026Q08033591-I1Open ↗
Showing 3 of 84 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature70
09/29/2026Q01343027-I1Open ↗
09/19/2026Q00875426-I1Open ↗
09/19/2026Q00875426-I1Open ↗
Showing 3 of 70 on file for this type
▸DOB NOWProgress Inspector Seal & Signature52
09/29/2026Q01343027-I1Open ↗
09/29/2026Q01343027-I1Open ↗
09/29/2026Q01343027-I1Open ↗
Showing 3 of 52 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
05/06/2025440820033Open ↗
07/08/2014420316296Open ↗
07/01/2014420564268Open ↗
Showing 3 of 11 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
10/08/2024440820033Open ↗
04/04/2022440711124Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
10/08/2024440820033Open ↗
04/04/2022440711124Open ↗
▸Trade Schedules & Equipment15
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING5
10/18/2012420316296Open ↗
10/03/2012420316296Open ↗
05/30/2012420564268Open ↗
Showing 3 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE1
11/02/2012420564268Open ↗
▸DOB NOWStandpipe Alarms Drawings1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection13
▸DOB NOWStreet Tree Checklist8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSTREET TREE CHECKLIST2
04/28/2022440711124Open ↗
12/08/2008410202436Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/15/2023440711124Open ↗
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos71
▸DOB NOWOER: Notice to Proceed39
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 39 on file for this type
▸DOB NOWOER: Notice of Satisfaction25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
12/02/2011420316296Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
05/09/2012420564268Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
06/09/2025440820033Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
10/08/2024440820033Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
12/02/2011420316296Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
07/23/2014420564268Open ↗
07/23/2014420316296Open ↗
08/24/2012420564268Open ↗
▸DOB NOWPreliminary Commissioning Report Certification3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
12/02/2011420316296Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/27/2014420564268Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWTR4 Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs24
▸BISLETTERS - SUPPORTING DOCUMENTATION11
10/29/2025420564268Open ↗
02/21/2025440711124Open ↗
09/15/2022401574934Open ↗
Showing 3 of 11 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
05/09/2012420564268Open ↗
01/14/2011420316296Open ↗
01/05/2009410209947Open ↗
Showing 3 of 4 on file for this type
▸BISDOT APPROVAL FOR APEX CORNER PED-RAMP1
03/15/2023440711124Open ↗
▸BISDEP APPROVAL GREEN INFRASTRUCTURE CONFLICT1
03/15/2023440711124Open ↗
▸BISDOT APPROVAL FOR RELOCATION OF LIGHT POSTS AND METERS1
03/15/2023440711124Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
07/31/2025440711124Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/07/2025440820033Open ↗
▸BISBPP-UTILITY APPROVAL TO RELOCATE POLE1
03/15/2023440711124Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
12/08/2008410202436Open ↗
▸BISDOB APPROVAL FOR 20' W CC1
03/15/2023440711124Open ↗
▸BISFINAL1
08/06/2025440820033Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT8
07/08/2014420316296Open ↗
06/27/2014420564268Open ↗
10/18/2012420316296Open ↗
Showing 3 of 8 on file for this type
▸BISBPP: ENGINEERS AFFIDAVIT1
07/30/2025440711124Open ↗
▸Filing & Intake Forms17
▸BISADDITIONAL INFORMATION7
02/21/2025440711124Open ↗
02/20/2025440711124Open ↗
11/21/2024440820033Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET6
07/03/2025421841332Open ↗
05/30/2012420564268Open ↗
05/09/2012420564268Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
10/08/2024440820033Open ↗
04/04/2022440711124Open ↗
▸BISBOROUGH INTAKE FORM2
07/03/2025421841332Open ↗
05/06/2025440820033Open ↗
▸Other Documents44
▸BISBPP - SUPPORTING DOCUMENTATION13
07/31/2025440711124Open ↗
07/31/2025440711124Open ↗
07/30/2025440711124Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProperty Ownership Certification9
08/21/2026Q00607526-B5Open ↗
08/21/2026Q00607526-B4Open ↗
08/21/2026Q00607526-B8Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSite Survey: Initial8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISRESTRICTION: DEED1
11/03/2022402516461Open ↗
▸BISPLOT DIAGRAM1
12/08/2008410202436Open ↗
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAdjoining Owners Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProject Specific General Liability (PGL1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type