ECB01/16/2026FOR FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER IN DOB VIO22-04250 DATED 11/25/2022 RESPONDENT WAS REQUIRED TO SUBMIT AN ENGINEER'S REPORT CONCERNING STRUCTURALLY DEFICIENT CONDITIONS AS OF 1/16/2026 AN ENG$25K due
DOB09/17/2024FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.EXP2WALL IS INDEPENDENT ABUTTNG THE ADJ BLDG.MAIN 3 STORY WAS RACKD&LEANING TOWARDS EXP4.EXP1 VINYL SIDNG WAS BULGNG OUT TOWARDS THE SDWALK@THE 1STFL.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 341656 072924FEU302PN DATED JULY 29, 2024
DOB07/29/2024FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.EXP2WALL IS INDEPENDENT ABUTTNG THE ADJ BLDG.MAIN 3 STORY WAS RACKD&LEANING TOWARDS EXP4.EXP1 VINYL SIDNG WAS BULGNG OUT TOWARDS THE SDWALK@THE 1STFL.OWNR TO RTAIN A NYSPE TO EVAL ENT BLDG&FILE RPAIR DWGS W/DOB BLDG TO BE RPAIR UNDR PRMT UNDR PRMT STRTNG 9/16/24&CMPLTD/SGND OF 11/1
ECB03/26/2024INSPECTOR OBSERVED BUILDING STRUCTURE (WOOD FRAME ENTIRE SPAN) LEANING OUT OF PLUMB, BETWEEN EXPO. #2 WALL AND ADJACENT BUILDING WALL AT 3RD FLOOR LEVEL SPACE APPROX. 8" WIDE. OBSERVED SPACE BETWEEN STAIRCASE A$6K due
ECB03/26/2024INSPECTOR OBSERVED AT CELLAR LEVEL INSTALLED I-BEAM AT THE CENTER WHICH POCKETED AND SUPPORTED 3 STEEL COLUMNS. DOB RECORDS INDICATE NO PERMIT ON FILE., OBTAIN PERMIT; COMPLY WITH CODE$12K due
ECB02/20/2024FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER IN DOB VIOLATION VIO22-04250,DATED 11/25/2022.RESPONDENT WAS REQUIRED TO SUBMIT AN ENGINEER'S REPORT CONCERNING STRUCTURALLY DEFICIENT CONDITIONS.AS OF 10/11/2023$12K due
DOB11/25/2022OBSERVED BUILDING STRUCTURE (WOOD FRAME ENTIRE SPAN) LEANING OUT OF PLUMB, BETWEEN EXPOSURE 2 WALL AND ADJACENT BUILDING WALL AT 3 RD FLOOR LEVEL SPACE APPROX. 8" WIDE. OBSERVED SPACE BETWEEN STAIRCASE AND WALL AT MULTIPLE LOCATIONS
DOB08/24/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB07/13/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB06/01/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB02/24/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB05/07/2014FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB02/26/2014FAILURE TO MAINTAIN:3 STORY TIMBER FRAMED RESIDENTIAL BLDG CA.1905 HAS SUBSTANTIAL RACKING TO NORTH.DEFLECTION MOST PROMINENT@1ST FL ALONG FRONT FACADE.LIKELY TO COLLAPSE IF LEFT IN THIS CONDITION. REQUIRE PE INSPECT&SUBMIT REPORT BY 4/1/14 WITH RECOMMENDATIONS FOR REPAIR. PLANS REQUIRED TO FILE WITH DOB&PERMIT TO START REPAIRS NO LATER THAN 5/1/14
ECB05/25/2016FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER.NOTED:EXP#4 ON THIS STORY WOOD FRAME IS LEANING OUT OF PLUMB APPROX 3" TO 4" ENTIRE SPAM.REM:OBTAIN STRUCTURAL ENGINEERS REPORT ON THIS PROPER.REM:COMPLY W/CODENothing owed — awaiting certificate of correction
ECB04/17/2016FAILURE TO MAITAIN BUILDING IN CODE COMPLIANT MANNER. NOTED: EXPOSURE 4 ON THIS 3 STORY WOOD FRAME IS LEANING OUT OF PLUMB APPROX. 3"TO4" OFENTIRE SPAM. REMEDY: OBTAIN STRUCTURAL ENGINEERS REPORT ON THIS PROPERNothing owed — awaiting certificate of correction
ECB03/07/2016REISSUED#35160953J FAILURE TO MAINTAIN BLDG IN A CODE COMPLIANT MANNER.NOTED EXP4 ON THIS 3STORY WOOD FRAME IS LEANING OUT OF PLUMB APPROX 3TO 4" OF ENTIRE SPAN REM:OBTAIN STRUCTURAL ENGINEERS REPORT ON THEM RENothing owed — awaiting certificate of correction
ECB11/27/2015FAILURE TO MAINTAIN BLDG IN A CODE COMPLIANT MANNER.NOTED:EXPOSURE 4 ON THIS 3 STY WOOD FRAME IS LEASNING OUT OF PLUMB APPROX 3 TO 4"S OF ENTIRE SPAN.REM:OBTAIN STRUCTURAL ENGINEERS REPORT ON THEM.REPAIR &/OR RNothing owed — awaiting certificate of correction
ECB02/08/2014FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED: BUILDINGIS LEANING WHEN FACING FRONT FACADE EXPOSURE #1 BUILDING HAS SHIFTED TO THE RIGHT MORE FROM TOP 3RD FLR OUT OF PLUMB APPROX 6".RMDY: MAKENothing owed — awaiting certificate of correction
ECB01/29/2012FAILURE TO MAINTAIN BUILDING WALLS & APPURTENANCES. 3 STORY WOOD FRAMESTRUCTURE LEADING NORTH WALL APPROX 6 TO 10 INCHES. ALSO REAR & SIDE YARD HAVE APPROX 20-25 CUBIC YARDS OF COMBUSTIBLE DEBRIS STORED IN THEMNothing owed — awaiting certificate of correction
ECB06/25/2009FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. NOTE: ENTRIE BUILDING IS LEANING APPROX 6' TOWARDS NORTHSIDE (TOWARDS 96 ADELPHI ST) PLUMB CAUSING WINDOW AND DOOR FRAMES TO SHIFT CREATING DANGEROUS CONDNothing owed — awaiting certificate of correction