← Back
Miscellaneous two family
98 CONSELYEA STREET
BROOKLYN · BIN 3068701
💬 Discuss this project
1901Year Built
2Stories
B9Building Class
R6BZoning
2,520 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Miscellaneous two family · 2,000 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof4p · 3 filings · 20 docs
Floor 24p · 1 filing · 13 docs
Floor 14p · 2 filings · 20 docs
Cellar4p · 2 filings · 20 docs
Basement3p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JASON E KIBBLER 1403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/19/2014$1.8M—Private party → Private party$694/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SIMON ARNOLD903/05/2025
IVAN DESIGN ENG. ANALYSIS, PLLC210/23/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KIBBO, INCGeneral Contractor2207/08/2026
DPH PLUMBING & HTG CORPPlumbing207/08/2026
ACS ELECTRICAL CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983503/05/2025
IVAN DESIGN ENGINEERING &6983210/23/2024
Building Lifecycle
All (126)Filed (11)Permit Issued (14)Signed Off (5)Violation (15)Inspection (5)Objection (46)Special Inspection (30)
04/01/2025
Signed off — Alteration
Propose renovation of 2 family house. Removal and installation of non load bearing partitions and related finishes all as per plans herewith filed. No change in use, egress or occupancy filed under this application.
B00574815-I1
03/28/2025
Signed off — Alteration
Propose mechanical modifications throughout, HVAC installation all as per plans herewith filed. No change in use, egress or occupancy filed under this application.
B00574824-I1
03/28/2025
Signed off — Alteration
Propose plumbing modifications throughout all as per plans herewith filed. No change in use, egress or occupancy filed under this application.
B00574840-I1
03/24/2025
Signed off — Alteration
Propose facade and structural modifications all as per plans herewith filed. No change is use, egress or occupancy filed under this application.
B00574918-I1
03/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
03/05/2025
Filed — Alteration
Propose plumbing modifications throughout all as per plans herewith filed. No change in use, egress or occupancy filed under this application.
B00574840-P2
03/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
02/20/2025
Signed off — Alteration
Propose installation of construction wood fence all as per plans herewith filed. No change in use, egress or occupancy filed under this application.
B00574727-I1
12/18/2024
Special inspection requirement — Duct leakage testing, insulation and design
ALEXIS SCHLESSINGERMAN
12/18/2024
Special inspection requirement — Heating Systems
ALEXIS SCHLESSINGERMAN
12/18/2024
Special inspection requirement — Mechanical Systems
ALEXIS SCHLESSINGERMAN
12/18/2024
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
12/18/2024
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
12/18/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
12/18/2024
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
12/18/2024
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
12/11/2024
Objection resolved — Addressed
12/09/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/27/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/18/2024
Objection resolved — Addressed
11/18/2024
Objection resolved — Addressed
11/18/2024
Objection resolved — Addressed
11/15/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/06/2024
Objection raised — Energy
11/06/2024
Objection raised — Admin
11/06/2024
Objection raised — Other
11/06/2024
Objection raised — Inspections
10/28/2024
Filed — Alteration
Propose mechanical modifications throughout, HVAC installation all as per plans herewith filed. No change in use, egress or occupancy filed under this application.
B00574824-P1
10/24/2024
Special inspection requirement — Structural Steel - High Strength Bolting
Ivan Luk
10/24/2024
Special inspection requirement — Structural Steel - Welding
Ivan Luk
10/24/2024
Special inspection requirement — Structural Steel - Details
Ivan Luk
10/24/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ivan Luk
10/24/2024
Special inspection requirement — Post-installed Anchors
Ivan Luk
10/24/2024
Special inspection requirement — Structural Wood Frame
Ivan Luk
10/24/2024
Special inspection requirement — Final
Ivan Luk
10/23/2024
Filed — Alteration
Propose plumbing modifications throughout all as per plans herewith filed. No change in use, egress or occupancy filed under this application.
B00574840-P1
10/23/2024
Filed — Alteration
Propose facade and structural modifications all as per plans herewith filed. No change is use, egress or occupancy filed under this application.
B00574918-P1
10/23/2024
Filed — Alteration
Propose renovation of 2 family house. Removal and installation of non load bearing partitions and related finishes all as per plans herewith filed. No change in use, egress or occupancy filed under this application.
B00574815-P2
10/17/2024
Special inspection requirement — Structural Steel - Details
Ivan Luk
10/17/2024
Special inspection requirement — Structural Steel - High Strength Bolting
Ivan Luk
10/17/2024
Special inspection requirement — Structural Steel - Welding
Ivan Luk
10/17/2024
Special inspection requirement — Final
Ivan Luk
10/17/2024
Special inspection requirement — Structural Wood Frame
Ivan Luk
10/17/2024
Special inspection requirement — Post-installed Anchors
Ivan Luk
10/17/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ivan Luk
10/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
10/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
10/16/2024
Special inspection requirement — Duct leakage testing, insulation and design
ALEXIS SCHLESSINGERMAN
10/16/2024
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
10/16/2024
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
10/16/2024
Special inspection requirement — Mechanical Systems
ALEXIS SCHLESSINGERMAN
07/31/2024
Permit issued — Construction Fence
B00574727-I1-FN
04/25/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/21/2024
Permit issued — Structural
B00574918-I1-ST
02/20/2024
Permit issued — General Construction
B00574815-I1-GC
02/20/2024
Permit issued — Plumbing
B00574840-I1-PL
11/06/2023
Permit issued — Mechanical Systems
B00574824-I1-MS
08/09/2023
Permit issued — Construction Fence
B00574727-I1-FN
03/24/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/21/2023
Permit issued — General Construction
B00574815-I1-GC
Latest 60 of 126 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offKIBBO, INC07/31/2024
DOB NOWStructuralSigned-offKIBBO, INC02/21/2024
DOB NOWGeneral ConstructionSigned-offKIBBO, INC02/20/2024
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP02/20/2024
DOB NOWMechanical SystemsSigned-offKIBBO, INC11/06/2023
DOB NOWConstruction FenceSigned-offKIBBO, INC08/09/2023
DOB NOWGeneral ConstructionSigned-offKIBBO, INC03/21/2023
DOB NOWStructuralSigned-offKIBBO, INC03/15/2023
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP02/22/2023
DOB NOWMechanical SystemsSigned-offKIBBO, INC11/21/2022
DOB NOWConstruction FenceSigned-offKIBBO, INC08/11/2022
DOB NOWStructuralSigned-offKIBBO, INC04/12/2022
DOB NOWGeneral ConstructionSigned-offKIBBO, INC03/26/2022
DOB NOWConstruction FenceSigned-offKIBBO, INC08/24/2021
1 project · most recent 05/13/2025
General Wiring
FiledStatusContractorScope
05/13/2025CompleteACS ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/09/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/27/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/15/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/25/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
03/13/2025Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
03/05/2025Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
12/18/2024Duct leakage testing, insulation and designALEXIS SCHLESSINGERMANenergy_progress
12/18/2024Heating SystemsALEXIS SCHLESSINGERMANspecial
12/18/2024Mechanical SystemsALEXIS SCHLESSINGERMANspecial
12/18/2024Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
12/18/2024FinalALEXIS SCHLESSINGERMANprogress
12/18/2024HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
12/18/2024HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
12/18/2024HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
10/24/2024Structural Steel - High Strength BoltingIvan Lukspecial
10/24/2024Structural Steel - WeldingIvan Lukspecial
10/24/2024Structural Steel - DetailsIvan Lukspecial
10/24/2024Structural Stability – Alterations of existing buildingsIvan Lukspecial
10/24/2024Post-installed AnchorsIvan Lukspecial
10/24/2024Structural Wood FrameIvan Lukprogress
10/24/2024FinalIvan Lukprogress
10/17/2024Structural Steel - DetailsIvan Lukspecial
10/17/2024Structural Steel - High Strength BoltingIvan Lukspecial
10/17/2024Structural Steel - WeldingIvan Lukspecial
10/17/2024FinalIvan Lukprogress
10/17/2024Structural Wood FrameIvan Lukprogress
10/17/2024Post-installed AnchorsIvan Lukspecial
10/17/2024Structural Stability – Alterations of existing buildingsIvan Lukspecial
10/16/2024Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
Latest 25 of 41.
▾Documents — 62 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/01/2026B00574824-P1Request digital key ↗
09/01/2026B00574727-I1Request digital key ↗
09/01/2026B00574840-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications39
▸DOB NOWSpecial Inspector Seal & Signature15
09/02/2026B00574918-I1Open ↗
09/02/2026B00574918-I1Open ↗
09/02/2026B00574918-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/02/2026B00574815-P1Open ↗
09/02/2026B00574815-P1Open ↗
09/02/2026B00574815-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/13/2026B00574727-I1Open ↗
08/13/2026B00574815-I1Open ↗
08/13/2026B00574840-I1Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/13/2026B00574815-P1Open ↗
08/13/2026B00574840-P1Open ↗
08/13/2026B00574840-P2Open ↗
Showing 3 of 10 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00574824-I1Open ↗
08/13/2026B00574815-I1Open ↗