Two family frame
98 RIDGECREST AVENUE
STATEN ISLAND · BIN 5174718
💬 Discuss this project
2020Year Built
2Stories
B2Building Class
R3AZoning
2,674 sfGross Floor Area
2Units
Two family frame · 4,587 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPhotovoltaic solar panel installation3p · 2 filings · 20 docs
Floor 23p · 1 filing · 13 docs
Floor 114p · 1 filing · 13 docs
Cellar3p · 1 filing · 13 docs
Basement1p · 1 filing · 13 docs
Sub-Basement3p · 1 filing · 13 docs
Site & exteriorTemporary construction fence installation3p · 2 filings · 15 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parker and West Engineering105/05/2025
Rogers Calvanico Group608/18/2021
Lawrence Mandarino Architect102/27/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Perciballi Industries203/21/2026
Sunrun103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Master Built HomesGeneral Contractor507/08/2026
Master Built HomesScaffold407/08/2026
Sunrun Installation Servicespecialty_contractor104/08/2026
JB Buzco PlumbingPlumbing107/08/2026
Rightway Plumbing & HeatingFire Protection107/08/2026
Perciballi IndustriesGeneral Contractor106/18/2020
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272105/05/2025
SRA Planning & Expediting5677102/23/2021
Building Lifecycle
02/11/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01220127-I1
05/13/2025
Permit issued — Solar
S01220127-I1-SL
05/05/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01220127-I1
05/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
05/02/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
29 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunrun Installation Service05/13/2025
DOB NOWCurb CutSigned-offMaster Built Homes08/23/2021
DOB NOWSprinklersSigned-offRightway Plumbing & Heating07/15/2021
DOB NOWCurb CutSigned-offMaster Built Homes07/02/2021
DOB NOWPlumbingSigned-offJB Buzco Plumbing11/24/2020
BIS—ISSUEDMaster Built Homes03/08/2021
BIS—ISSUEDMaster Built Homes10/21/2020
BIS—ISSUEDPerciballi Industries06/18/2020
2 projects · most recent 05/05/2025
General Wiring
FiledStatusContractorScope
05/05/2025CompleteSunrun Solar Electl—
03/07/2021CompleteB & R Electrical ContractingGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/27/2021Pass-Final Curb Cut Non-Directive 14PassView ↗
07/22/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/20/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
05/02/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
05/02/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
05/02/2025Energy Code Compliance InspectionsWalid Abdullaprogress
05/02/2025FinalWalid Abdullaprogress
05/02/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
02/19/2021Sprinkler SystemsWILLIAM MONTAGUEspecial
93 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account