1957Year Built
6Stories
D4Building Class
R7AZoning
103,200 sfGross Floor Area
99Units
LL97 CoveredRent Stabilized14 Open Violations ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: SHORELANE ARMS OWNER CRP · 27,862 sf lot · 3.7 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Roof1p · 2 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SHORE LANE ARMS OWNERS3007/08/2026
GEO USA CONSTRUCTION407/08/2026
SHORE LANE ARMS OWNER CRP403/22/2026
OWNER OF 9801 SHORD RD103/22/2026
BRIDGEVIEW ASSOCIATES703/22/2026
T-MOBILE103/21/2026
VERIZON103/21/2026
RISSAT CONSTRUCTION203/21/2026
BRIDGEVIEW ASSOCIATES LLC C O DI303/21/2026
SHORE LANE OWNERS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PCS ENGINEERING209/12/2024
MESZAROS ENGINEERING PLLC202/02/2024
ENTHINK ENGINEERS LLC108/07/2023
ASHRAF CORP103/17/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PCS ENGINEERING203/21/2026
MESZAROS ENGINEERING PLLC403/21/2026
SHEIKH EXPEDITING203/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor707/08/2026
ADELPHI RESTORATION CORPGeneral Contractor304/09/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
CROCITTO, JR., WILLIAMElectrical103/21/2026
ESCORCE, MANUELElectrical103/21/2026
JOSEPH PISARRIElectrical103/21/2026
MAGALLANES, ROBERTOElectrical103/21/2026
R.D.I. ASSOCIATES INCElectrical103/21/2026
SNB ELECTRICAL CONTNG CORElectrical103/22/2026
BARBIERI, LAWRENCEElectrical103/21/2026
GEO USA CONSTRUCTION INCGeneral Contractor107/08/2026
BENI, CARMINEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PCS ENGINEERING3745209/12/2024
MESZAROS ENGINEERING PLLC963202/02/2024
GEORGE J. XERAKIAS, PE1658107/07/2023
Building Lifecycle
All (97)Filed (7)Permit Issued (8)Signed Off (3)Facade (FISP) (19)Violation (60)
03/13/2026
Signed off — Alteration
Installation of outrigger & hoist for facade repair & inspection.
B01064301-I1
03/12/2026
Permit issued — Suspended Scaffold
B01064301-I1-SC
12/19/2025
Signed off — Alteration
9th Cycle FISP Repair program. No change to use, egress or occupancy.
B00833830-I1
09/18/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B00913358-I1
08/01/2025
Permit issued — Sidewalk Shed
B00913358-I1-SH
07/09/2025
Violation issued (HPD, open)
B
07/09/2025
Violation issued (HPD, open)
B
07/09/2025
Violation issued (HPD, closed)
A
07/09/2025
Violation issued (HPD, open)
A
04/28/2025
Cycle 9 facade report submitted
04/28/2025
Cycle 9 facade report signed — SWARMP
04/03/2025
Cycle 9 facade inspection completed
01/06/2025
Cycle 9 facade report submitted
01/06/2025
Cycle 9 facade report signed — UNSAFE
12/17/2024
Cycle 9 facade inspection completed
10/01/2024
Permit issued — General Construction
B00833830-I1-GC
09/12/2024
Filed — Alteration
9th Cycle FISP Repair program. No change to use, egress or occupancy.
B00833830-P1
08/05/2024
Permit issued — Sidewalk Shed
B00913358-I1-SH
06/13/2024
Permit issued — Suspended Scaffold
B01064301-I1-SC
06/10/2024
Filed — Alteration
Installation of outrigger & hoist for facade repair & inspection.
B01064301-I1
02/02/2024
Filed — Alteration
REPLACEMENT OF UNDERGROUND STORM SEWER LINES. INSTALLATION OF NEW WATER PIPING AND FIXTURES, NO CHANGE IN EGRESS OR OCCUPANCY.
B00976844-S1
02/02/2024
Filed — Alteration
REPLACEMENT OF UNDERGROUND STORM SEWER LINES. INSTALLATION OF NEW WATER PIPING AND FIXTURES, NO CHANGE IN EGRESS OR OCCUPANCY.
B00976844-I1
02/01/2024
Violation issued (HPD, open)
B
02/01/2024
Violation issued (HPD, open)
B
02/01/2024
Violation issued (HPD, closed)
C
02/01/2024
Violation issued (HPD, closed)
A
02/01/2024
Violation issued (HPD, open)
B
10/03/2023
Permit issued — General Construction
B00833830-I1-GC
08/07/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B00913358-I1
08/07/2023
Permit issued — Sidewalk Shed
B00913358-I1-SH
07/07/2023
Filed — Alteration
9th Cycle FISP Repair program. No change to use, egress or occupancy.
B00833830-I1
03/21/2023
Permit issued — Sidewalk Shed
B00844830-I1-SH
03/17/2023
Filed — Alteration
B00844830-I1
12/15/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/16/2022
Violation issued (ECB, closed)
Elevators
11/16/2022
Violation issued (ECB, closed)
Elevators
10/31/2022
Violation issued (HPD, open)
A
10/31/2022
Violation issued (HPD, closed)
C
10/31/2022
Violation issued (HPD, closed)
C
10/31/2022
Violation issued (HPD, closed)
C
02/22/2022
Cycle 9 facade report submitted
02/22/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/22/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/21/2022
Cycle 9 facade report signed — UNSAFE
02/16/2022
Cycle 9 facade inspection completed
04/19/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/14/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/14/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/20/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/20/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2018
Violation issued (HPD, open)
A
08/02/2018
Violation issued (HPD, open)
A
03/28/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/28/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/18/2017
Violation issued (HPD, open)
A
04/19/2017
Cycle 8 facade report signed — SWARMP
02/07/2017
Cycle 8 facade report submitted
02/06/2017
Cycle 8 facade inspection completed
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offJRR CONTRACTING INC03/12/2026
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC08/01/2025
DOB NOWGeneral ConstructionSigned-offADELPHI RESTORATION CORP10/01/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC08/05/2024
DOB NOWSuspended ScaffoldSigned-offJRR CONTRACTING INC06/13/2024
DOB NOWGeneral ConstructionSigned-offADELPHI RESTORATION CORP10/03/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC08/07/2023
DOB NOWSidewalk ShedPermit IssuedGEO USA CONSTRUCTION03/21/2023
BISOTISSUEDRISSAT CONSTRUCTION CORP08/07/2017
BISOTISSUEDSMART REALTY GROUP, INC02/20/2015
BISOTISSUEDTRINITY TECHNOLOGIES LLC02/05/2013
BISOTISSUEDODYSSIA GLOBAL COMM. CORP07/05/2012
BISOTISSUEDCOSTROTTA CONSTRUCT MG IN04/23/2012
BISOTISSUEDBCI COMMUNICATIONS, INC.05/30/2008
BISEQISSUEDWOLF RESTORATIONS05/07/2007
BISOTISSUEDWOLF RESTORATIONS05/07/2007
BISEQISSUEDCOLGATE SCAFFOLDING01/09/2007
BISOTISSUEDNORTHCOAST COMMUNICATION LLC02/04/2002
BISOTISSUEDABCO CONTRACTING CORP.01/23/2001
BISPLISSUEDSESSA'S PLBG & HTG06/28/2000
BISMHISSUEDSTEPLIN CONSTRUCTION CORP.03/15/1999
BISOTISSUEDJ.T. ORONZIO GENERAL CONT10/27/1998
BISBLISSUEDSTAR INDUSTRIAL SERVICE CO INC01/24/1995
BISPLRE-ISSUEDJOSEPH FERRIGNO PLUMBING AND HE01/24/1995
BISSPISSUEDAPEC CORP01/17/1991
BISOTRE-ISSUEDNATIONAL AIR CORRECTION CORP.11/29/1990
1 project · most recent 02/02/2024
Storm
FiledStatusContractorScope
02/02/2024——Storm
2 projects · most recent 09/12/2023
General Wiring
FiledStatusContractorScope
09/12/2023Permit IssuedSNB ELECTRICAL CONTNG CORGeneral Wiring
08/29/2023CompleteBOROWIDE ELECT'L CONTR'S—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
09/20/2024FinalMichael Walshprogress
09/20/2024Tenant Protection Plan ComplianceGeorge Xerakiasspecial
09/20/2024Post-installed AnchorsMichael Walshspecial
09/20/2024Structural Stability – Alterations of existing buildingsMichael Walshspecial
09/20/2024MasonryMichael Walshspecial
01/29/2024PreliminaryChristian Meszarosprogress
01/29/2024Fire-Resistant Penetrations and JointsChristian Meszarosspecial
12/13/2023Tenant Protection Plan ComplianceChristian Meszarosspecial
12/13/2023FinalChristian Meszarosprogress
12/13/2023Tenant Protection Plan ComplianceChristian Meszarosspecial
▾Documents — 93 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/27/2026B00844830-I1Request digital key ↗
08/27/2026B00833830-I1Request digital key ↗
08/27/2026B00833830-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits13
▸BISWORK PERMIT APPLICATION7
08/04/2017340530633Open ↗
02/23/2015321085286Open ↗
02/06/2013320464966Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
10/13/2017320464966Open ↗
08/04/2017340530633Open ↗
02/23/2015321085286Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications29
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
10/17/2017320464966Open ↗
08/24/2017340530633Open ↗
08/24/2017340530633Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/15/2026B00976844-S1Open ↗
08/24/2026B00976844-I1Open ↗
08/23/2026B00833830-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026B00844830-I1Open ↗
08/27/2026B00833830-P1Open ↗
08/27/2026B00833830-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/04/2017340530633Open ↗
02/23/2015321085286Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026B00976844-I1Open ↗
08/23/2026B00833830-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/04/2017340530633Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/23/2015321085286Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/04/2017340530633Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
08/04/2017340530633Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/27/2026B00833830-I1Open ↗
08/27/2026B00833830-P1Open ↗
08/26/2026B00976844-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
04/23/2012320464966Open ↗
01/11/2010320120070Open ↗
05/13/2008310140834Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
08/04/2017340530633Open ↗
02/23/2015321085286Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
10/17/2017320464966Open ↗
08/24/2017340530633Open ↗
08/24/2017340530633Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
10/17/2017320464966Open ↗
08/24/2017340530633Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/04/2017340530633Open ↗
▸BISNYCECC ANALYSIS1
08/04/2017340530633Open ↗
▸BISTECHNICAL REPORT: ENERGY1
04/23/2012320464966Open ↗
▸Inspections & Test Reports1
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
08/04/2017340530633Open ↗
▸Approvals, Objections & Sign-offs8
▸BISADMINISTRATIVE OBJECTIONS4
02/23/2015321085286Open ↗
04/23/2012320464966Open ↗
01/11/2010320120070Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
10/17/2017320464966Open ↗
08/24/2017340530633Open ↗
07/28/2011320120070Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT9
10/17/2017320464966Open ↗
08/24/2017340530633Open ↗
08/24/2017340530633Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms5
▸BISBOROUGH INTAKE FORM2
10/17/2017320464966Open ↗
08/24/2017340530633Open ↗
▸BISEFILING COVER SHEET2
02/23/2015321085286Open ↗
04/23/2012320464966Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/04/2017340530633Open ↗
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/13/2026B01064301-I1Open ↗
▸DOB NOWCalculations1
08/13/2026B01064301-I1Open ↗