← Back
Primarily 3 family with 1 store or office
983 MANHATTAN AVENUE
BROOKLYN · BIN 3064280
💬 Discuss this project
1923Year Built
3Stories
S3Building Class
R7AZoning
3,750 sfGross Floor Area
4Units
Rent Stabilized23 Open Violations ▸FDNY Report ↗
Primarily 3 family with 1 store or office · Owner of record: MANHATTAN AVENUE TROPHY, LLC · 2,500 sf lot · 1.5 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 22p · 2 filings · 20 docs
Floor 1
Cellar3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HEIGHTS CONSTRUCTION SERV303/22/2026
MANHATTAN AVENUE TROPHY, LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/01/2024$3.6M—— → —$973/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MJE PROFESSIONAL SERVICES107/02/2025
BASSIRI801/31/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1603/21/2026
SNR EXPEDITING DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HEIGHTS CONSTRUCTION SERVGeneral Contractor303/21/2026
KLE CONSTRUCTION INCGeneral Contractor303/21/2026
JOHN FITZGERALD PLBG &HTGPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394401/31/2025
Building Lifecycle
All (65)Filed (9)Permit Issued (4)Signed Off (4)Violation (39)Inspection (6)Special Inspection (3)
05/05/2026
Violation issued (HPD, closed)
A
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/19/2025
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01250644-I1
07/28/2025
Permit issued — Sidewalk Shed
B01250644-I1-SH
07/02/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01250644-I1
06/10/2025
Violation issued (HPD, closed)
A
03/11/2025
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, SECOND AND THIRD FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01054486-I1
03/07/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/19/2025
Signed off — Alteration
INSTALL (3) NEW BOILERS FOR EXISTING 3-FAMILY DWELLING ON CELLAR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B01054493-I1
02/18/2025
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, SECOND AND THIRD FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01054490-I1
02/12/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/31/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, SECOND AND THIRD FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01054486-P3
01/23/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/02/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/17/2024
Violation issued (ECB, open)
Boilers
10/16/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, SECOND AND THIRD FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01054490-P1
10/16/2024
Filed — Alteration
INSTALL (3) NEW BOILERS FOR EXISTING 3-FAMILY DWELLING ON CELLAR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B01054493-P1
10/16/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, SECOND AND THIRD FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01054486-P2
10/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
10/16/2024
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
10/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/19/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/19/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/16/2024
Permit issued — Plumbing
B01054490-I1-PL
07/25/2024
Permit issued — Boiler Equipment
B01054493-I1-BE
06/27/2024
Permit issued — General Construction
B01054486-I1-GC
06/05/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, SECOND AND THIRD FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01054486-P1
06/03/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, SECOND AND THIRD FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01054486-I1
06/03/2024
Filed — Alteration
INSTALL (3) NEW BOILERS FOR EXISTING 3-FAMILY DWELLING ON CELLAR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B01054493-I1
06/03/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, SECOND AND THIRD FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01054490-I1
04/10/2024
Violation issued (HPD, closed)
A
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/23/2023
Violation issued (HPD, closed)
A
11/10/2022
Violation issued (HPD, closed)
I
03/01/2022
Violation issued (HPD, closed)
A
04/12/2021
Violation issued (HPD, closed)
A
04/12/2021
Violation issued (HPD, closed)
I
10/30/2019
Violation issued (HPD, closed)
I
10/18/2018
Violation issued (HPD, closed)
I
11/27/2017
Violation issued (HPD, closed)
I
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/10/2016
Violation issued (HPD, closed)
I
10/13/2015
Violation issued (HPD, closed)
I
07/23/2013
Violation issued (HPD, open)
B
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/02/2008
Violation issued (FDNY_NOV, closed)
11/05/1998
Violation issued (ECB, closed)
Construction
11/05/1998
Violation issued (DOB, open)
VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
01/20/1988
Violation issued (HPD, open)
B
10/12/1984
Violation issued (HPD, open)
B
10/12/1984
Violation issued (HPD, open)
B
10/12/1984
Violation issued (HPD, open)
B
10/12/1984
Violation issued (HPD, open)
B
10/12/1984
Violation issued (HPD, open)
B
Latest 60 of 65 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offHEIGHTS CONSTRUCTION SERV07/28/2025
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG09/16/2024
DOB NOWBoiler EquipmentSigned-offJOHN FITZGERALD PLBG &HTG07/25/2024
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC06/27/2024
BISOTISSUEDFRANK MANCINI & SON INC12/03/1990
2 projects · most recent 07/02/2025
FiledStatusContractorScope
07/02/2025CompleteRICHARD NEU—
10/16/2024CompleteKJK ELECTRIC INC—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/07/2025Pass-Final General Construction Non-Directive 14PassView ↗
02/12/2025Fail-Final General Construction Non-Directive 14FailView ↗
01/23/2025Fail-Final General Construction Non-Directive 14FailView ↗
01/02/2025Pass-Final Boiler Equipment InspectionPassView ↗
09/19/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
10/16/2024Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
10/16/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
10/16/2024Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/25/2026B01054486-P2Request digital key ↗
08/25/2026B01054486-I1Request digital key ↗
08/25/2026B01054486-P3Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/25/2026B01054486-P2Open ↗
08/25/2026B01054486-P1Open ↗
08/25/2026B01054486-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026B01054486-P2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026B01054486-P2Open ↗
▸Environmental & Asbestos10
▸DOB NOWOER: Notice to Proceed7
08/13/2026B01054493-P1Open ↗
08/13/2026B01054490-I1Open ↗
08/13/2026B01054486-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWOER: Notice of Satisfaction3
08/13/2026B01054486-I1Open ↗
08/13/2026B01054490-I1Open ↗
08/13/2026B01054493-I1Open ↗