983 PARK AVENUE
MANHATTAN · BIN 1047642
💬 Discuss this project
1926Year Built
15Stories
D4Building Class
R8BZoning
203,706 sfGross Floor Area
63Units
LL97 CoveredRent Stabilized2 Open Violations ▸FISP: SAFE
Elevator cooperative · Owner of record: 983 TNTS CORP · 16,746 sf lot · 12.16 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 3 filings · 15 docs
Floor 151p · 1 filing · 4 docs
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 91p · 1 filing · 5 docs
Floor 84p · 1 filing · 13 docs
Floor 76p · 2 filings · 8 docs
Floor 6Under Construction5p · 1 filing · 9 docs
Floor 5
Floor 4Under Construction7p · 1 filing · 14 docs
Floor 31p · 1 filing · 15 docs
Floor 2
Floor 1
Cellar4p · 2 filings · 20 docs
Basement2p · 1 filing · 4 docs
3 jobs · most recent 08/03/2026
Others Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/03/2026——Air Conditioning Systems, Ventilation Systems
Cooling
Task TYC021TW 29,400 BTU · Condensing Unit ×4
Ventilation
First Company 30HXS0002UBV000AAA 995 CFM · Ahu ×3
24HXS0002UBV000AAA 800 CFM · Ahu ×1
10/28/2025Signed-offTHE METRO GROUP, INCOthers
Other
__Junk__ STAINLESS STEEL 1 BTU · Chimney ×1
01/20/2022——Others
Other
Johnson Controls YC090C00A2AAA5 8 tons · Rooftop Unit ×1
6 jobs · most recent 06/15/2026
Water/Sanitary Gas
FiledStatusContractorScope
06/15/2026Permit IssuedACCURATE MECHANICAL INCGas, Water/Sanitary
10/28/2025Signed-offALKLEM PLUMBING INCGas
07/11/2025Signed-offM&G PLUMBING AND HEATINGWater/Sanitary
07/24/2024——Water/Sanitary
03/01/2022——Water/Sanitary
08/25/2021Permit IssuedMACREDDIN PLBG & HTG INCGas, Water/Sanitary
19 jobs · most recent 07/22/2026
General Wiring Boiler Controls Lighting
FiledStatusContractorScope
07/22/2026CompleteMAXIMUM ELECTRIC CORP.Boiler Controls
11/25/2025CompleteENERGY ONE ELECTRICAL LLCGeneral Wiring
09/17/2025CompletePRUDENT ELECTRIC INC—
02/14/2025CompleteCAVAN ELECTRIC CORP.General Wiring
01/14/2025CompleteD & W ELECTRICAL CONT CORGeneral Wiring
10/10/2024CancelledMAXIMUM ELECTRIC CORP.Boiler Controls
03/05/2024CompleteLUME ELECTRIC INC—
12/07/2023CompleteECO ELECTRICAL SERVCS LLCGeneral Wiring, Lighting
06/20/2023CompleteLUME ELECTRIC INCGeneral Wiring
02/07/2023Permit IssuedROBERT CHIMENTI21 meters, 1 new_meters
01/12/2023CompleteBOROWIDE ELECT'L CONTR'S—
10/12/2021CompleteROMCON ELECTRIC, INCGeneral Wiring
09/29/2021CompleteBANNER ELECTRIC INCGeneral Wiring
08/05/2021CompleteCENTURY ELECTRIC LLCGeneral Wiring
04/07/2021CompleteESSEX ELECTRIC INCGeneral Wiring
Building Lifecycle
All (293)Filed (48)Permit Issued (42)Signed Off (27)Facade (FISP) (15)Violation (60)Inspection (33)Objection (38)Special Inspection (30)
09/22/2026
Permit issued — General Construction
M01230808-I1-GC
09/03/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/25/2026
Signed off — Alteration
Interior Renovation of an Existing Apartment (Unit #5B). As per plans filed herewith. No change to use, occupancy or egress.
M01201024-I1
08/20/2026
Permit issued — Plumbing
M01399554-S1-PL
08/18/2026
Objection resolved — Addressed
08/13/2026
Permit issued — General Construction
M01399554-I1-GC
08/12/2026
Objection raised — Scope
08/12/2026
Objection resolved — Addressed
08/12/2026
Objection raised — Scope
08/04/2026
Objection resolved — Addressed
08/04/2026
Objection resolved — Addressed
08/03/2026
Filed — Alteration
Modification to existing mechanical system to include New Split AC unit systems.
M01399557-I1
06/18/2026
Objection raised — Scope
06/17/2026
Objection resolved — Addressed
06/16/2026
Objection raised — Scope
06/16/2026
Objection raised — Scope
06/15/2026
Filed — Alteration
RENOVATION OF KITCHEN, BATHROOMS, LAUNDRY ROOM, AND NEW POWDER ROOM. INTERIOR PARTITIONSCHANGES ACCORDING TO DRAWINGS. NO CHANGE TO USE OR EGRESS.
M01399554-S1
06/15/2026
Filed — Alteration
RENOVATION OF KITCHEN, BATHROOMS, LAUNDRY ROOM, AND NEW POWDER ROOM. INTERIOR PARTITIONSCHANGES ACCORDING TO DRAWINGS. NO CHANGE TO USE OR EGRESS.
M01399554-I1
06/08/2026
Permit issued — General Construction
M01230808-I1-GC
06/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
LAWRENCE GREEN
06/01/2026
Signed off — Alteration
INSTALL NEW GAS PIPING AND NEW GAS METER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01078680-S2
05/28/2026
Signed off — Alteration
INSTALL NEW GAS PIPING AND NEW GAS METER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01078680-S1
05/28/2026
Signed off — Alteration
INSTALL NEW GAS PIPING AND NEW GAS METER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01078680-I1
12/23/2025
Signed off — Alteration
SCOPE OF WORK IS INSTALLATION OF ONE NEW SHOWER BASE,REPLACING 3 FIXTURE BATHROOMS: 3 LAVATORIES , SHOWER,BATHTUB, 3 WATER CLOSETS, KITCHEN SINK W/ DISH WASHER,ELECTRIC RANGE, WASHING MACHINE, AND ELECTRIC DRYER,AND ALL ASSOCIATED PIPING.
M01070490-S1
12/17/2025
Permit issued — General Construction
M01245708-I1-GC
12/05/2025
Signed off — Alteration
SCOPE OF WORK IS INSTALLATION OF ONE NEW SHOWER BASE,REPLACING 3 FIXTURE BATHROOMS: 3 LAVATORIES , SHOWER,BATHTUB, 3 WATER CLOSETS, KITCHEN SINK W/ DISH WASHER,ELECTRIC RANGE, WASHING MACHINE, AND ELECTRIC DRYER,AND ALL ASSOCIATED PIPING.
M01070490-S2
12/02/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/05/2025
Filed — Alteration
SCOPE OF WORK IS INSTALLATION OF ONE NEW SHOWER BASE,REPLACING 3 FIXTURE BATHROOMS: 3 LAVATORIES , SHOWER,BATHTUB, 3 WATER CLOSETS, KITCHEN SINK W/ DISH WASHER,ELECTRIC RANGE, WASHING MACHINE, AND ELECTRIC DRYER,AND ALL ASSOCIATED PIPING.
M01070490-P1
10/31/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
John Guth
10/31/2025
Special inspection requirement — HVAC-R and service water heating system controls
John Guth
10/31/2025
Special inspection requirement — Energy Code Compliance Inspections
John Guth
10/31/2025
Special inspection requirement — Final
John Guth
10/31/2025
Special inspection requirement — HVAC-R and service water heating equipment
John Guth
10/31/2025
Special inspection requirement — Mechanical Systems
John Guth
10/31/2025
Special inspection requirement — Duct leakage testing, insulation and design
John Guth
10/31/2025
Special inspection requirement — Maintenance information
John Guth
10/28/2025
Filed — Alteration
INSTALL NEW GAS PIPING AND NEW GAS METER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01078680-P1
10/15/2025
Special inspection requirement — Maintenance information
Stephen Shishko
10/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
10/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
10/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
10/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
10/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/14/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/07/2025
Permit issued — Plumbing
M01245708-S1-PL
09/19/2025
Filed — Alteration
ROOF REPAIRS AND PARAPET MODIFICATINS AS PER DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY IS INVOLVED UNDER THIS APPLICATION.
M01230808-I1
09/18/2025
Signed off — Alteration
M01161209-I1
09/10/2025
Signed off — Alteration
MINOR MODIFICATIONS TO LIGHTING, MILLWORK, AND FINISHES THROUGHOUT. CREATE NEW OPENING BETWEEN LIVING AND FAMILY ROOM. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
M01237651-I1
08/29/2025
Signed off — Alteration
Interior Renovations in existing apartment, Unit 15C, as per filed plans. No Change in Use, Egress or Occupancy under this application.
M01075418-I1
08/29/2025
Signed off — Alteration
Interior Renovations in existing apartment, Unit 15C, as per filed plans. No Change in Use, Egress or Occupancy under this application.
M01075418-S1
08/26/2025
Signed off — Alteration
SCOPE OF WORK IS INSTALLATION OF ONE NEW SHOWER BASE,REPLACING 3 FIXTURE BATHROOMS: 3 LAVATORIES , SHOWER,BATHTUB, 3 WATER CLOSETS, KITCHEN SINK W/ DISH WASHER,ELECTRIC RANGE, WASHING MACHINE, AND ELECTRIC DRYER,AND ALL ASSOCIATED PIPING.
M01070490-I1
08/19/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
08/13/2025
Inspection — Certified StandPipe - SD - Fire StandPipe - SD - Roughing
Certified
View inspection ↗
08/13/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
08/12/2025
Permit issued — Standpipe
M01161209-I1-EW-SD
08/11/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/11/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/17/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/11/2025
Filed — Alteration
Replacement of Plumbing fixtures in Apt. 4C to facilitate the renovation work filed separately under M01245708-I1. No changes in the use, egress and occupancy.
M01245708-S1
Latest 60 of 293 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DOUGLAS ELLIMAN PROPERTY MANAGEMENT1109/23/2026
CEPRINE CONSTRUCTION807/08/2026
HIGH LINE CONSTRUCTION GROUP307/08/2026
983 TNTS CORP103/22/2026
983 TNTS CORP C O BHS903/22/2026
STRUCTURAL PRESERV SYSTEM203/22/2026
STRUCTURAL PRESERVATION SYSTEMS303/22/2026
983 TENANT2303/22/2026
983 TENANTS7803/21/2026
PHOENIX103/21/2026
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMARO CONSTRUCTION CORPGeneral Contractor604/09/2026
HIGHLINE CONSTRUCTION GRGeneral Contractor507/08/2026
BENT MECHANICAL CORPGeneral Contractor403/21/2026
THE METRO GROUP, INCGeneral Contractor303/21/2026
DUTCHESS CABINETS OF NY *General Contractor303/21/2026
DEAN FINE BUILDING LLCGeneral Contractor303/21/2026
SIGNORE & SONS PLBG CORPPlumbing207/08/2026
CENTURY ELECTRIC CO.Electrical203/22/2026
CEPRINE CONSTRUCTION INCGeneral Contractor207/08/2026
NY HILL RESTORATION, INCGeneral Contractor209/23/2026
UNITY CONSTRUCTION GROUPGeneral Contractor203/21/2026
ALKLEM PLUMBING INCPlumbing207/08/2026
DONATO PLUMBING, INCPlumbing207/08/2026
ABE HIMELFARBElectrical203/21/2026
NEW YORK CRANE & EQUIPElectrical103/21/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor107/08/2026
ATRIUM CONSTRUCTIONS LLCGeneral Contractor104/09/2026
LUME ELECTRIC INCElectrical103/22/2026
CITY GAS HTG SVC CO INCPlumbing107/08/2026
JEAN PAUL WILLIAMSElectrical103/21/2026
GLENDALE ELECTL CONTNG INElectrical103/22/2026
FREEDOM GS INCGeneral Contractor108/14/2026
FALLON, ROBERTElectrical103/21/2026
KALINIC CONSTRUCTION INCGeneral Contractor107/08/2026
KLA CONSTRUCTION LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JACK GREEN ASSOCIATES422806/15/2026
GUTH DECONZO CONSULTING E1210111/05/2025
NEW AGE ENGINEERING PLLC7746510/28/2025
SITE SAFETY LLC8555109/19/2025
ASHWANI KHANNA PE5256207/11/2025
FRANCISCO D. PEREZ PE3306106/16/2025
KATZ ARCHITECTURE1371106/13/2025
HOWARD L ZIMMERMAN ARCHIT1712101/02/2025
BASE ENGINEERING, DPC.9820211/08/2024
SGM ENGINEERING2366108/09/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNY HILL RESTORATION, INC09/22/2026
DOB NOWPlumbingPermit IssuedACCURATE MECHANICAL INC08/20/2026
DOB NOWGeneral ConstructionPermit IssuedFREEDOM GS INC08/13/2026
DOB NOWGeneral ConstructionPermit IssuedNY HILL RESTORATION, INC06/08/2026
DOB NOWGeneral ConstructionPermit IssuedATRIUM CONSTRUCTIONS LLC12/17/2025
DOB NOWPlumbingSigned-offM&G PLUMBING AND HEATING10/07/2025
DOB NOWStandpipeSigned-offNEW YORK PLBG-HTG-COOL C08/12/2025
DOB NOWPlumbingSigned-offALKLEM PLUMBING INC07/08/2025
DOB NOWGeneral ConstructionSigned-offKALINIC CONSTRUCTION INC06/27/2025
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP06/26/2025
DOB NOWGeneral ConstructionSigned-offUNITY CONSTRUCTION GROUP06/20/2025
DOB NOWGeneral ConstructionSigned-offAMARO CONSTRUCTION CORP05/29/2025
DOB NOWMechanical SystemsSigned-offAMARO CONSTRUCTION CORP05/29/2025
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP01/15/2025
DOB NOWMechanical SystemsSigned-offAMARO CONSTRUCTION CORP01/14/2025
DOB NOWGeneral ConstructionSigned-offAMARO CONSTRUCTION CORP01/13/2025
DOB NOWMechanical SystemsSigned-offTHE METRO GROUP, INC11/12/2024
DOB NOWPlumbingSigned-offCITY GAS HTG SVC CO INC11/08/2024
DOB NOWGeneral ConstructionSigned-offDUTCHESS CABINETS OF NY *09/11/2024
DOB NOWBoiler EquipmentSigned-offMARLANDE HEATING CORP08/23/2024
DOB NOWPlumbingSigned-offALKLEM PLUMBING INC08/23/2024
DOB NOWMechanical SystemsSigned-offKLA CONSTRUCTION LLC05/01/2024
DOB NOWMechanical SystemsSigned-offHIGHLINE CONSTRUCTION GR01/30/2024
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM12/22/2023
DOB NOWGeneral ConstructionSigned-offHIGHLINE CONSTRUCTION GR10/06/2023
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC05/16/2023
DOB NOWMechanical SystemsSigned-offHIGHLINE CONSTRUCTION GR02/21/2023
DOB NOWGeneral ConstructionSigned-offHIGHLINE CONSTRUCTION GR02/17/2023
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS01/12/2023
DOB NOWGeneral ConstructionSigned-offDEAN FINE BUILDING LLC01/11/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC01/04/2023
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC05/28/2022
DOB NOWGeneral ConstructionSigned-offHIGHLINE CONSTRUCTION GR05/27/2022
DOB NOWStructuralSigned-offSAMIRO SERVICES INC05/17/2022
DOB NOWMechanical SystemsSigned-offBENT MECHANICAL CORP11/09/2021
DOB NOWGeneral ConstructionSigned-offBENT MECHANICAL CORP11/08/2021
DOB NOWPlumbingSigned-offBENT MECHANICAL CORP11/05/2021
DOB NOWPlumbingPermit IssuedMACREDDIN PLBG & HTG INC09/17/2021
DOB NOWGeneral ConstructionSigned-offSGC CONTRACTING CORP04/08/2021
DOB NOWPlumbingSigned-offG & L PLUMBING CO, INC04/06/2021
+ 52 more permits on file
▾Field Inspections (DOB CAP) — 33
DateTypeResultReport
09/03/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/02/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/19/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
08/13/2025Certified StandPipe - SD - Fire StandPipe - SD - RoughingCertifiedView ↗
08/13/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
08/11/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/17/2025Pass-Final Boiler Equipment InspectionPassView ↗
06/11/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/19/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/04/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/21/2025Fail-Final CND-Occupancy InspectionFailView ↗
12/11/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/14/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/19/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/29/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/13/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/13/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/04/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 33.
▾Special Inspection Requirements (DOB NOW) — 94
DateRequirementInspectorRole
06/04/2026Fire-Resistant Penetrations and JointsLAWRENCE GREENspecial
10/31/2025HVAC-R and service water heating system controlsJohn Guthenergy_progress
10/31/2025HVAC-R and service water piping design and insulationJohn Guthenergy_progress
10/31/2025HVAC-R and service water heating equipmentJohn Guthenergy_progress
10/31/2025Duct leakage testing, insulation and designJohn Guthenergy_progress
10/31/2025FinalJohn Guthprogress
10/31/2025Energy Code Compliance InspectionsJohn Guthprogress
10/31/2025Maintenance informationJohn Guthenergy_progress
10/31/2025Mechanical SystemsJohn Guthspecial
10/15/2025HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
10/15/2025Tenant Protection Plan ComplianceStephen Shishkospecial
10/15/2025HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
10/15/2025Maintenance informationStephen Shishkoenergy_progress
10/15/2025Fire-Resistant Penetrations and JointsStephen Shishkospecial
06/24/2025Energy Code Compliance InspectionsASHWANI KHANNAprogress
06/24/2025Fire-Resistant Penetrations and JointsASHWANI KHANNAspecial
06/24/2025FinalASHWANI KHANNAprogress
06/24/2025Energy Code Compliance InspectionsASHWANI KHANNAprogress
06/24/2025Fire-Resistant Penetrations and JointsASHWANI KHANNAspecial
06/24/2025Fire-Resistance Rated ConstructionASHWANI KHANNAprogress
06/09/2025Lighting in dwelling unitsDavid Katzenergy_progress
06/09/2025Fire-Resistant Penetrations and JointsDavid Katzspecial
06/09/2025Energy Code Compliance InspectionsDavid Katzprogress
06/06/2025FinalDavid Katzprogress
06/04/2025Fire-Resistant Penetrations and JointsJACK GREENspecial
Latest 25 of 94.
▾Documents — 984 on file (BIS + DOB NOW)
▸Plans & Drawings47
▸DOB NOWPlans/Sketch39
09/03/2026M00575572-I1Request digital key ↗
09/03/2026M00508822-I1Request digital key ↗
09/03/2026M00623357-I1Request digital key ↗
Showing 3 of 39 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/04/2026M00462308-P1Request digital key ↗
09/04/2026M00462308-I1Request digital key ↗
09/01/2026M00442008-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/04/2026M00356382-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00462242-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸Applications & Permits210
▸BISPLAN / WORK APPROVAL APPLICATION93
05/29/2024123755640Open ↗
03/20/2024123277328Open ↗
03/20/2024123277328Open ↗
Showing 3 of 93 on file for this type
▸BISWORK PERMIT APPLICATION76
08/06/2021123277328Open ↗
08/04/2021123277328Open ↗
08/02/2021123277328Open ↗
Showing 3 of 76 on file for this type
▸DOB NOWLPC Approval/Permit39
09/29/2026M01399557-I1Open ↗
09/02/2026M00673919-I1Open ↗
09/02/2026M00749202-I1Open ↗
Showing 3 of 39 on file for this type
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)2
10/04/2022123755640Open ↗
09/12/2022123277328Open ↗
▸Seals & Professional Certifications253
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION85
01/23/2020123534666Open ↗
01/23/2020123534666Open ↗
01/23/2020123534666Open ↗
Showing 3 of 85 on file for this type
▸DOB NOWProgress Inspector Seal & Signature53
09/23/2026M01078680-I1Open ↗
09/23/2026M01078680-I1Open ↗
09/23/2026M01078680-I1Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature46
09/04/2026M00462308-I1Open ↗
09/04/2026M00462308-P1Open ↗
09/03/2026M00575572-I1Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature37
09/23/2026M01201024-I1Open ↗
09/23/2026M01078680-I1Open ↗
09/02/2026M00623357-I1Open ↗
Showing 3 of 37 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISProfessional and Owner Certification (POC3)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment75
▸BISSCHEDULE B - PLUMBING32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 32 on file for this type
▸BISSELF-CERT PLUMBING NOTICE30
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 30 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
10/03/2019123594789Open ↗
09/23/2019123521741Open ↗
09/16/2019123521741Open ↗
Showing 3 of 9 on file for this type
▸BISEQUIPMENT USE PERMITS3
04/22/2021123594789Open ↗
Showing 1 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection19
▸BISTenant Protection Plan and Notes13
12/12/2019123045551Open ↗
06/07/2019123534666Open ↗
05/23/2019123534666Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWTenant Protection Plan4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
05/10/2019123277328Open ↗
04/24/2019123594789Open ↗
▸Environmental & Asbestos79
▸DOB NOWDEP ACP-5: Asbestos Assessment Report37
09/04/2026M00462308-P1Open ↗
09/04/2026M00462308-I1Open ↗
09/02/2026M00673919-I1Open ↗
Showing 3 of 37 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)12
06/07/2019123534666Open ↗
03/18/2019123594789Open ↗
Showing 2 of 12 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
09/03/2026M00575572-I1Open ↗
08/31/2026M08048095-I1Open ↗
08/25/2026M01070490-S2Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
10/04/2022123755640Open ↗
06/11/2021123277328Open ↗
Showing 2 of 3 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
05/10/2019123277328Open ↗
▸Energy Compliance46
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
04/04/2019123755640Open ↗
04/04/2019123755640Open ↗
03/14/2019123277328Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
05/18/2022123277328Open ↗
03/14/2019123277328Open ↗
Showing 2 of 7 on file for this type
▸BISTR8: Energy Code Progress Inspections5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
05/18/2022123277328Open ↗
06/11/2021123277328Open ↗
02/02/2021123594789Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification2
08/26/2026M01078680-S1Open ↗
08/26/2026M01078680-I1Open ↗
▸BISLIGHTING IN DWELLING UNITS1
07/22/2024123037454Open ↗
▸BISLIGHTING CONTROLS1
07/22/2024123037454Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/22/2024123037454Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY8
05/18/2022123277328Open ↗
06/11/2021123277328Open ↗
06/11/2021123277328Open ↗
Showing 3 of 8 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
07/22/2024123037454Open ↗
10/04/2022123755640Open ↗
▸Approvals, Objections & Sign-offs76
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST21
07/29/2024123037454Open ↗
05/08/2024123277328Open ↗
10/08/2021140603577Open ↗
Showing 3 of 21 on file for this type
▸BISADMINISTRATIVE OBJECTIONS19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISLANDMARKS APPROVAL14
01/23/2020123534666Open ↗
06/28/2019123755640Open ↗
05/23/2019123534666Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
10/06/2022123755640Open ↗
10/06/2022123755640Open ↗
10/08/2021140603577Open ↗
Showing 3 of 11 on file for this type
▸BISLANDMARKS SIGNOFF5
07/23/2024123037454Open ↗
05/08/2024123277328Open ↗
10/08/2021140603577Open ↗
Showing 3 of 5 on file for this type
▸BISSHED LETTER3
01/11/2021140603577Open ↗
01/23/2019140603577Open ↗
Showing 2 of 3 on file for this type
▸BISFINAL2
07/22/2024123037454Open ↗
04/22/2021123594789Open ↗
▸DOB NOWLandmark Approval1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership57
▸BISCOST AFFIDAVIT52
02/08/2021123108332Open ↗
01/23/2020123534666Open ↗
10/03/2019123594789Open ↗
Showing 3 of 52 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
06/11/2021123277328Open ↗
Showing 1 of 3 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
07/22/2024123037454Open ↗
04/22/2021123594789Open ↗
▸Filing & Intake Forms92
▸BISADDITIONAL INFORMATION41
04/01/2024123277328Open ↗
07/27/2021123277328Open ↗
02/18/2021123594789Open ↗
Showing 3 of 41 on file for this type
▸BISEFILING COVER SHEET30
05/23/2019123534666Open ↗
04/04/2019123755640Open ↗
03/18/2019123594789Open ↗
Showing 3 of 30 on file for this type
▸BISBOROUGH INTAKE FORM17
01/11/2021140603577Open ↗
03/09/2020140667874Open ↗
01/23/2020123534666Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Other Documents17
▸DOB NOWProof of Historic Building6
09/02/2026M00749202-I1Open ↗
Showing 1 of 6 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form4
05/02/2019123594789Open ↗
Showing 1 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISREVISE PW1-SECTION 261
07/24/2024123037454Open ↗
▸BISLAA - Supporting Documentation1
08/31/2018123521741Open ↗
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type