← Back
Miscellaneous two family
984 E 79TH ST
BROOKLYN · BIN 3224836
💬 Discuss this project
1960Year Built
3Stories
B9Building Class
R5BZoning
2,304 sfGross Floor Area
2Units
Miscellaneous two family · 1,800 sf lot · 1.28 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES A CLANCY202/19/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARC DESIGN CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYS ESSENTIAL POWER INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETRECTE LLC8116202/19/2024
Building Lifecycle
All (14)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (10)
03/01/2024
Signed off — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON EXISITING ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
B00965628-I1
02/23/2024
Special inspection requirement — Air barrier - visual inspection
James Clancy
02/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
02/23/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
02/23/2024
Special inspection requirement — Final
James Clancy
02/23/2024
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
02/19/2024
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON EXISITING ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
B00965628-P1
02/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
02/19/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
02/19/2024
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
02/19/2024
Special inspection requirement — Final
James Clancy
02/19/2024
Special inspection requirement — Air barrier - visual inspection
James Clancy
01/31/2024
Permit issued — Solar
B00965628-I1-SL
01/25/2024
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON EXISITING ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
B00965628-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYS ESSENTIAL POWER INC01/31/2024
2 jobs · most recent 12/14/2023
FiledStatusContractorScope
12/14/2023CompleteBERGER QUALITY ELEC'L CON—
12/12/2023CompleteBERGER QUALITY ELEC'L CON2 meters
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
02/23/2024Air barrier - visual inspectionJames Clancyenergy_progress
02/23/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
02/23/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
02/23/2024FinalJames Clancyprogress
02/23/2024Energy Code Compliance InspectionsJames Clancyprogress
02/19/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
02/19/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
02/19/2024Energy Code Compliance InspectionsJames Clancyprogress
02/19/2024FinalJames Clancyprogress
02/19/2024Air barrier - visual inspectionJames Clancyenergy_progress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/26/2026B00965628-P1Request digital key ↗
08/26/2026B00965628-I1Request digital key ↗
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
12/19/2023340907111Open ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature6
08/22/2026B00965628-P1Open ↗
08/22/2026B00965628-I1Open ↗
08/22/2026B00965628-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B00965628-P1Open ↗
08/13/2026B00965628-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/22/2026B00965628-I1Open ↗
08/22/2026B00965628-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B00965628-P1Open ↗
08/13/2026B00965628-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B00965628-I1Open ↗