← Back
Primarily 1 family with 1 store or office
986 ASHFORD STREET
BROOKLYN · BIN 3098016
💬 Discuss this project
1950Year Built
3Stories
S1Building Class
R5Zoning
2,448 sfGross Floor Area
2Units
Primarily 1 family with 1 store or office · 3,670 sf lot · 0.67 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbing
Floor 34p · 1 filing · 20 docs
Floor 23p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar7p · 2 filings · 20 docs
1 job · most recent 10/17/2025
General Wiring
FiledStatusContractorScope
10/17/2025CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
1 job · most recent 04/29/2026
FiledStatusContractorScope
04/29/2026Permit IssuedDONOVAN PETGRAVE1 scope_items
Building Lifecycle
All (40)Filed (6)Permit Issued (3)Signed Off (1)Inspection (4)Special Inspection (26)
05/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
PETER RUPPERT
05/22/2026
Special inspection requirement — Energy Code Compliance Inspections
PETER RUPPERT
05/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
PETER RUPPERT
05/22/2026
Special inspection requirement — Air barrier — testing
PETER RUPPERT
05/22/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
PETER RUPPERT
05/22/2026
Special inspection requirement — Air barrier - visual inspection
PETER RUPPERT
05/22/2026
Special inspection requirement — Fenestration areas
PETER RUPPERT
05/22/2026
Special inspection requirement — Lighting in dwelling units
PETER RUPPERT
04/29/2026
Filed — Alteration CO
Obtain a new certificate of occupancy for a one family house and a dentist office on the first floor.
B00744250-P3
12/02/2025
Signed off — Alteration
PROPOSED TO INDICATE EXISTING BOILER AND HOT WATER HEATER AT CELLAR LEVEL. INSTALL NEW SHOWER AND RELOCATE EXISTING TOILET AND LAV AT 2nd FL. REMOVE EXISTING TUB AND REPLACE WITH A NEW SHOWER AT 3rd FL. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPL
B00731843-I1
12/02/2025
Filed — Alteration CO
Obtain a new certificate of occupancy for a one family house and a dentist office on the first floor.
B00744250-P2
12/01/2025
Special inspection requirement — Air barrier - visual inspection
PETER RUPPERT
12/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PETER RUPPERT
12/01/2025
Special inspection requirement — Energy Code Compliance Inspections
PETER RUPPERT
12/01/2025
Special inspection requirement — Fire-Resistance Rated Construction
PETER RUPPERT
12/01/2025
Special inspection requirement — Air barrier — testing
PETER RUPPERT
12/01/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
PETER RUPPERT
12/01/2025
Special inspection requirement — Lighting in dwelling units
PETER RUPPERT
12/01/2025
Special inspection requirement — Fenestration areas
PETER RUPPERT
11/05/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/04/2025
Filed — Alteration CO
Obtain a new certificate of occupancy for a one family house and a dentist office on the first floor.
B00744250-P1
07/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
PETER RUPPERT
07/16/2025
Special inspection requirement — Air barrier — testing
PETER RUPPERT
07/16/2025
Special inspection requirement — Lighting in dwelling units
PETER RUPPERT
07/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PETER RUPPERT
07/16/2025
Special inspection requirement — Energy Code Compliance Inspections
PETER RUPPERT
07/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
PETER RUPPERT
07/16/2025
Special inspection requirement — Fenestration areas
PETER RUPPERT
07/16/2025
Special inspection requirement — Air barrier - visual inspection
PETER RUPPERT
06/30/2025
Permit issued — General Construction
B00744250-I1-GC
06/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PETER RUPPERT
03/30/2025
Filed — Alteration
PROPOSED TO INDICATE EXISTING BOILER AND HOT WATER HEATER AT CELLAR LEVEL. INSTALL NEW SHOWER AND RELOCATE EXISTING TOILET AND LAV AT 2nd FL. REMOVE EXISTING TUB AND REPLACE WITH A NEW SHOWER AT 3rd FL. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPL
B00731843-P1
03/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PETER RUPPERT
01/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/02/2025
Permit issued — Plumbing
B00731843-I1-PL
10/01/2024
Permit issued — General Construction
B00744250-I1-GC
06/15/2022
Filed — Alteration CO
Obtain a new certificate of occupancy for a one family house and a dentist office on the first floor.
B00744250-I1
05/19/2022
Filed — Alteration
PROPOSED TO INDICATE EXISTING BOILER AND HOT WATER HEATER AT CELLAR LEVEL. INSTALL NEW SHOWER AND RELOCATE EXISTING TOILET AND LAV AT 2nd FL. REMOVE EXISTING TUB AND REPLACE WITH A NEW SHOWER AT 3rd FL. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPL
B00731843-I1
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/09/2021$600K—Private party → Private party$245/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOUNDVIEW ENGINEERING P.C.604/29/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TDA CONSULTING503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DONOVAN PETGRAVEGeneral Contractor603/21/2026
SAMUEL & SONS P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOUNDVIEW ENGINEERING P.C6974604/29/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedDONOVAN PETGRAVE06/30/2025
DOB NOWPlumbingSigned-offSAMUEL & SONS P & H INC01/02/2025
DOB NOWGeneral ConstructionPermit IssuedDONOVAN PETGRAVE10/01/2024
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
05/22/2026Fire-Resistant Penetrations and JointsPETER RUPPERTspecial
05/22/2026Energy Code Compliance InspectionsPETER RUPPERTprogress
05/22/2026Fire-Resistance Rated ConstructionPETER RUPPERTprogress
05/22/2026Air barrier — testing PETER RUPPERTenergy_progress
05/22/2026Fenestration and door U-factor and product ratingsPETER RUPPERTenergy_progress
05/22/2026Air barrier - visual inspectionPETER RUPPERTenergy_progress
05/22/2026Fenestration areasPETER RUPPERTenergy_progress
05/22/2026Lighting in dwelling unitsPETER RUPPERTenergy_progress
12/01/2025Air barrier - visual inspectionPETER RUPPERTenergy_progress
12/01/2025Fire-Resistant Penetrations and JointsPETER RUPPERTspecial
12/01/2025Energy Code Compliance InspectionsPETER RUPPERTprogress
12/01/2025Fire-Resistance Rated ConstructionPETER RUPPERTprogress
12/01/2025Air barrier — testing PETER RUPPERTenergy_progress
12/01/2025Fenestration and door U-factor and product ratingsPETER RUPPERTenergy_progress
12/01/2025Lighting in dwelling unitsPETER RUPPERTenergy_progress
12/01/2025Fenestration areasPETER RUPPERTenergy_progress
07/16/2025Fenestration and door U-factor and product ratingsPETER RUPPERTenergy_progress
07/16/2025Air barrier — testing PETER RUPPERTenergy_progress
07/16/2025Lighting in dwelling unitsPETER RUPPERTenergy_progress
07/16/2025Fire-Resistant Penetrations and JointsPETER RUPPERTspecial
07/16/2025Energy Code Compliance InspectionsPETER RUPPERTprogress
07/16/2025Fire-Resistance Rated ConstructionPETER RUPPERTprogress
07/16/2025Fenestration areasPETER RUPPERTenergy_progress
07/16/2025Air barrier - visual inspectionPETER RUPPERTenergy_progress
03/31/2025Fire-Resistant Penetrations and JointsPETER RUPPERTspecial
Latest 25 of 26.
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/29/2026B00731843-P1Request digital key ↗
08/29/2026B00731843-I1Request digital key ↗
08/17/2026B00744250-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature12
09/04/2026B00744250-P2Open ↗
09/04/2026B00744250-P2Open ↗
09/04/2026B00744250-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/29/2026B00731843-I1Open ↗
08/29/2026B00731843-P1Open ↗
08/17/2026B00744250-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/04/2026B00744250-P2Open ↗
08/27/2026B00744250-I1Open ↗
08/24/2026B00744250-P1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/17/2026B00744250-P3Open ↗
08/13/2026B00744250-I1Open ↗
08/13/2026B00744250-P2Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/17/2026B00744250-P3Open ↗
08/13/2026B00744250-P1Open ↗
08/13/2026B00744250-P2Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00744250-I1Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification4
08/17/2026B00744250-P3Open ↗
08/13/2026B00744250-P2Open ↗
08/13/2026B00744250-I1Open ↗
Showing 3 of 4 on file for this type