987 MADISON AVENUE
MANHATTAN · Upper East Side-Carnegie Hill · BIN 1041804
💬 Discuss this project
1930Year Built
15Stories
D4Building Class
C5-1Zoning
142,110 sfGross Floor Area
46Units
LL97 CoveredRent Stabilized6 Open Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: CARLYLE HOUSE INC CO BROWN HARRIS STEVEN S INC · 13,702 sf lot · 10.37 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
Roof4p · 3 filings · 20 docs
Penthouse1p · 2 filings · 6 docs
Floor 151p · 1 filing · 14 docs
Floor 141 filing · 2 docs
Floor 131 filing · 2 docs
Floor 12Under Construction11p · 2 filings · 20 docs
Floor 111 filing · 2 docs
Floor 101p · 2 filings · 20 docs
Floor 94p · 2 filings · 8 docs
Floor 8
Floor 71p · 1 filing · 20 docs
Floor 6
Floor 5Under Construction6p · 2 filings · 20 docs
Floor 4
Floor 3
Floor 2
Floor 1
Cellar5p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACADIA REALTY307/08/2026
BROWN HARRIS STEVENS5407/08/2026
ACADIA REALTY TRUST707/08/2026
BHS1907/08/2026
CARLYLE HOUSE INC. BHS503/22/2026
OWNER OF 50 EAST 77 ST103/22/2026
OWNER OF 54 E 77 ST103/22/2026
HOTEL CARLYLE MANAGEMENT103/22/2026
OWNER 50 E 77 ST CARLYLE103/22/2026
ROSEBUD TRUST703/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RPO403/21/2026
D R BROWN1003/21/2026
QUICK FILING OF NY INC303/21/2026
D D EXPEDITORS1803/21/2026
MUNICIPAL BUILDING CONSULTANTS603/21/2026
AE DESIGN SOLUTION603/21/2026
BODNAR ARCHITECTURE P C603/21/2026
QUICK FILING303/21/2026
CALDERON ARCHITECTURE DESIGN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SCHNELLBACHER-SENDON GRO*General Contractor2107/08/2026
ANDALORO CONSTRUCTION LLCGeneral Contractor1007/17/2026
CREATE RENOVATION & DESIGNGeneral Contractor707/08/2026
TACONIC BUILDERS INCGeneral Contractor507/08/2026
TEE BEE SIGN INSTScaffold507/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor507/08/2026
BENT MECHANICAL CORPPlumbing407/08/2026
NEW YORK COOLING TOWERS IGeneral Contractor307/08/2026
AGGRESSIVE HEATING INCGeneral Contractor203/21/2026
A S K ENTERPRISES INCGeneral Contractor203/21/2026
HUDSON PLMBING & MCH, LLCPlumbing207/08/2026
VICTOR LONDONOElectrical103/21/2026
WARREN OSTROFFElectrical103/21/2026
WHITE HALL RESTORATIONElectrical103/21/2026
BECKER, CHARLESElectrical103/21/2026
JEROME KRITZElectrical103/21/2026
I.M.P. PLG & HTG CORPElectrical103/21/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
FILARDI, JAMESElectrical103/21/2026
EVEREST SCAFFOLDING INCGeneral Contractor107/08/2026
EUGENE CALLERYElectrical103/21/2026
ERNEST GILBERTElectrical103/21/2026
DAVEN ELECTRIC CORPElectrical103/22/2026
WE WORK GROUP INCGeneral Contractor107/08/2026
DAIDONE, SElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ACCARDO ENGINEERING, PLLC1247910/14/2025
SAG ENGINEERING & CONSULT608910/14/2025
BHK ENGINEERING, D.P.C.9589205/12/2025
BERGMAN CONSULTING ENGINE253303/06/2025
ROBERT F. GERMAIN JR. PE5100512/11/2024
LEO Y LEE ASSOCIATES2481109/25/2024
CNS INSPECTION SERVICES7566210/04/2023
KENDALL ENGINEERING PC4154105/16/2023
RAD DESIGN & ARCHITECTURE2082201/20/2023
CROSSCHECK INSPECTION SER544107/08/2020
Building Lifecycle
All (275)Filed (43)Permit Issued (54)Signed Off (21)Facade (FISP) (12)Violation (60)Inspection (11)Objection (44)Special Inspection (30)
07/16/2026
Permit issued — Mechanical Systems
M01084668-S1-MS
07/16/2026
Permit issued — General Construction
M01084668-I1-GC
05/26/2026
Permit issued — General Construction
M01392396-I1-GC
05/05/2026
Filed — Alteration
GENERAL CONSTRUCTION FOR THE INTERIOR RENOVATION OF A BATHROOM IN APARTMENT 5A ON THE 5TH FLOOR. AS PER PLANS FILED. NO CHANGE TO USE, EGRESS, OCCUPANCY, OR ZONING.
M01392396-I1
05/05/2026
Special inspection requirement — Lighting in dwelling units
Greg Epstein
05/05/2026
Special inspection requirement — Lighting controls
Greg Epstein
04/24/2026
Special inspection requirement — Final
Greg Epstein
04/13/2026
Permit issued — General Construction
M01084668-I1-GC
04/13/2026
Permit issued — Mechanical Systems
M01084668-S1-MS
01/20/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/13/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/08/2026
Signed off — Alteration
STRUCTURAL WORK TO INFILL MECHANICAL SLEEVES AND CREATE NEW OPENING.
M01192788-I1
11/21/2025
Permit issued — General Construction
M01084668-I1-GC
11/21/2025
Permit issued — Mechanical Systems
M01084668-S1-MS
11/13/2025
Permit issued — Plumbing
M01084668-S2-PL
10/27/2025
Special inspection requirement — Final
Anthony Accardo
10/27/2025
Special inspection requirement — Masonry
Anthony Accardo
10/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/27/2025
Special inspection requirement — Sprayed fire-resistant materials
Chester Kowalski
10/27/2025
Special inspection requirement — Structural Steel - Details
Anthony Accardo
10/27/2025
Special inspection requirement — Structural Steel - Welding
Anthony Accardo
10/14/2025
Filed — Alteration
Replace the service entrance courtyard ramp and slab, replace limestone at the facade, and construct a temporary enclosure over the NE courtyard entrance.
M01114347-P5
10/02/2025
Special inspection requirement — Structural Steel - Welding
Anthony Accardo
10/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/02/2025
Special inspection requirement — Sprayed fire-resistant materials
Chester Kowalski
10/02/2025
Special inspection requirement — Final
Anthony Accardo
10/02/2025
Special inspection requirement — Masonry
Anthony Accardo
10/02/2025
Special inspection requirement — Structural Steel - Details
Anthony Accardo
08/14/2025
Filed — Alteration
Replace the service entrance courtyard ramp and slab, replace limestone at the facade, and construct a temporary enclosure over the NE courtyard entrance.
M01114347-P4
08/11/2025
Special inspection requirement — Structural Steel - Welding
Anthony Accardo
08/11/2025
Special inspection requirement — Final
Anthony Accardo
08/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
Chester Kowalski
08/11/2025
Special inspection requirement — Structural Steel - Details
Anthony Accardo
08/11/2025
Special inspection requirement — Sprayed fire-resistant materials
Chester Kowalski
08/11/2025
Special inspection requirement — Masonry
Anthony Accardo
06/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/11/2025
Permit issued — Structural
M01192788-I1-ST
06/02/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY WEATHER OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01113383-I1
05/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/27/2025
Special inspection requirement — Masonry
WILLIAM DEGRAAFF
05/27/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
WILLIAM DEGRAAFF
05/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
WILLIAM DEGRAAFF
05/27/2025
Special inspection requirement — Structural Steel - Details
WILLIAM DEGRAAFF
05/27/2025
Special inspection requirement — Final
WILLIAM DEGRAAFF
05/19/2025
Permit issued — General Construction
M01114347-I1-GC-CX
05/12/2025
Filed — Alteration
STRUCTURAL WORK TO INFILL MECHANICAL SLEEVES AND CREATE NEW OPENING.
M01192788-P1
04/15/2025
Special inspection requirement — Masonry
WILLIAM DEGRAAFF
04/15/2025
Special inspection requirement — Structural Steel - Details
WILLIAM DEGRAAFF
04/15/2025
Special inspection requirement — Final
WILLIAM DEGRAAFF
04/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
WILLIAM DEGRAAFF
04/10/2025
Signed off — Alteration
Install temporary shoring in the cellar to stabilize the concrete ramp above the courtyard.
M00989940-I1
04/09/2025
Permit issued — Structural
M00989940-I1-ST
04/08/2025
Filed — Alteration
Replace the service entrance courtyard ramp and slab, replace limestone at the facade, and construct a temporary enclosure over the NE courtyard entrance.
M01114347-P3
03/26/2025
Objection resolved — Addressed
03/21/2025
Objection raised — Structural
03/14/2025
Filed — Alteration
STRUCTURAL WORK TO INFILL MECHANICAL SLEEVES AND CREATE NEW OPENING.
M01192788-I1
03/06/2025
Filed — Alteration
New air conditioning and ventilation installation for apartment renovation in conjunction with GC #M01084668-I1. No change to use, egress, or occupancy. Post Approval Amendment filed to show changes to equipment and design of HVAC equipment.
M01084668-P1
12/31/2024
Signed off — Alteration
REPLACEMENT (1) NEW 5000 GALLON OIL TANK IN EXISTING 3HR ENCLOSURE. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01095307-S1
Latest 60 of 275 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedANDALORO CONSTRUCTION LLC07/16/2026
DOB NOWGeneral ConstructionPermit IssuedANDALORO CONSTRUCTION LLC07/16/2026
DOB NOWGeneral ConstructionPermit IssuedWE WORK GROUP INC05/26/2026
DOB NOWGeneral ConstructionPermit IssuedANDALORO CONSTRUCTION LLC04/13/2026
DOB NOWMechanical SystemsPermit IssuedANDALORO CONSTRUCTION LLC04/13/2026
DOB NOWGeneral ConstructionPermit IssuedANDALORO CONSTRUCTION11/21/2025
DOB NOWMechanical SystemsPermit IssuedANDALORO CONSTRUCTION11/21/2025
DOB NOWPlumbingPermit IssuedHUDSON PLMBING & MCH, LLC11/13/2025
DOB NOWStructuralSigned-offANDALORO CONSTRUCTION06/11/2025
DOB NOWGeneral ConstructionPermit IssuedSCHNELLBACHER-SENDON GRO*05/19/2025
DOB NOWStructuralSigned-offSCHNELLBACHER-SENDON GRO*04/09/2025
DOB NOWBoiler EquipmentSigned-offAGGRESSIVE HEATING INC10/25/2024
DOB NOWGeneral ConstructionPermit IssuedSCHNELLBACHER-SENDON GRO*10/17/2024
DOB NOWProtection and Mechanical MethodsSigned-offSCHNELLBACHER-SENDON GRO*10/03/2024
DOB NOWMechanical SystemsPermit IssuedANDALORO CONSTRUCTION09/20/2024
DOB NOWPlumbingPermit IssuedHUDSON PLMBING & MCH, LLC09/20/2024
DOB NOWGeneral ConstructionPermit IssuedANDALORO CONSTRUCTION09/19/2024
DOB NOWGeneral ConstructionSigned-offAGGRESSIVE HEATING INC09/10/2024
DOB NOWGeneral ConstructionSigned-offTACONIC BUILDERS INC02/22/2024
DOB NOWMechanical SystemsSigned-offTACONIC BUILDERS INC02/22/2024
DOB NOWStructuralSigned-offSCHNELLBACHER-SENDON GRO*02/12/2024
DOB NOWSignSigned-offWEINFELD, ELLIOT11/15/2023
DOB NOWGeneral ConstructionSigned-offTACONIC BUILDERS INC08/09/2023
DOB NOWMechanical SystemsSigned-offTACONIC BUILDERS INC08/09/2023
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC08/08/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC08/01/2023
DOB NOWSupported ScaffoldPermit IssuedSCHNELLBACHER-SENDON GRO*05/12/2023
DOB NOWGeneral ConstructionSigned-offSCHNELLBACHER-SENDON GRO*05/10/2023
DOB NOWMechanical SystemsSigned-offNEW YORK COOLING TOWERS I04/25/2023
DOB NOWGeneral ConstructionSigned-offCREATE RENOVATION & DESIG03/21/2023
DOB NOWGeneral ConstructionSigned-offCREATE RENOVATION & DESIG12/28/2022
DOB NOWMechanical SystemsSigned-offNEW YORK COOLING TOWERS I12/08/2022
DOB NOWPlumbingSigned-offBENT MECHANICAL CORP11/14/2022
DOB NOWGeneral ConstructionSigned-offCREATE RENOVATION & DESIG11/11/2022
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC08/10/2022
DOB NOWSupported ScaffoldPermit IssuedSCHNELLBACHER-SENDON GRO*05/20/2022
DOB NOWProtection and Mechanical MethodsPermit IssuedSCHNELLBACHER-SENDON GRO*05/20/2022
DOB NOWGeneral ConstructionSigned-offSCHNELLBACHER-SENDON GRO*05/20/2022
DOB NOWMechanical SystemsSigned-offA S K ENTERPRISES INC10/30/2021
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC09/14/2021
+ 60 more permits on file
1 project · most recent 03/06/2025
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/06/2025Permit IssuedANDALORO CONSTRUCTION LLCAir Conditioning Systems, Ventilation Systems
Cooling
Carrier FT5ANXB24LOO 700 CFM · Fan Coil Indoor ×1
FT5ANXB25L00 875 CFM · Fan Coil Indoor ×1
National Comfort NCP53040000A-D1 26,800 BTU · Condensing Unit ×1
NCP53040000A-DI 23,600 BTU · Condensing Unit ×1
Ventilation
Broan 689 50 CFM · Exhaust Fan ×1
1 project · most recent 03/06/2025
Water/Sanitary
FiledStatusContractorScope
03/06/2025Permit IssuedGOLDS PLUMBING CORPWater/Sanitary
21 projects · most recent 09/23/2026
General Wiring
FiledStatusContractorScope
09/23/2026Permit IssuedEMPIRE LIC ELECL CONTRSGeneral Wiring
09/25/2024Permit IssuedMEGA ELEC'L CONTR'G, INCGeneral Wiring
04/16/2024CompleteP & Z ELECTRIC CORPGeneral Wiring
10/11/2023CompleteTHE METRO GROUP ELECTRICGeneral Wiring
01/20/2023CompleteKRIS ELECTRICAL SOLUTIONS—
11/16/2022CompleteACCURATE ELEC'L CORP.General Wiring
06/30/2022CompleteRESPONSE ELECTRIC INC.General Wiring
12/08/2021CompleteDENMAR ELECTRIC CORPGeneral Wiring
07/07/2021CompleteDAVEN ELECTRIC CORP—
11/20/2020CompletePAUL VERARDIGeneral Wiring
11/10/2020CompleteBOROWIDE ELECT'L CONTR'S—
04/23/2020Permit IssuedALL WAYS ELECTRIC CORP.W—
10/17/2019Permit IssuedJUST ELECTRIC NYC CORPGeneral Wiring
04/19/2019Permit IssuedPATRIOT ELECTRIC CORPGeneral Wiring
04/18/2019CompleteBELMONT ELECTRICAL, INCGeneral Wiring
1 project · most recent 10/14/2025
Steel
FiledStatusContractorScope
10/14/2025Permit IssuedSCHNELLBACHER-SENDON GRO*Steel
1 project · most recent 03/29/2021
Scaffold
FiledStatusContractorScope
03/29/2021Permit IssuedSCHNELLBACHER-SENDON GRO*Scaffold
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
01/20/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/20/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/13/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/13/2024Pass-Final Boiler Equipment InspectionPassView ↗
03/28/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/04/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/14/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 96
DateRequirementInspectorRole
05/05/2026Lighting in dwelling unitsGreg Epsteinenergy_progress
05/05/2026Lighting controlsGreg Epsteinenergy_progress
04/24/2026FinalGreg Epsteinprogress
10/27/2025Tenant Protection Plan Compliance—special
10/27/2025Structural Steel - DetailsAnthony Accardospecial
10/27/2025MasonryAnthony Accardospecial
10/27/2025Sprayed fire-resistant materialsChester Kowalskispecial
10/27/2025Structural Steel - WeldingAnthony Accardospecial
10/27/2025FinalAnthony Accardoprogress
10/02/2025Structural Steel - DetailsAnthony Accardospecial
10/02/2025Sprayed fire-resistant materialsChester Kowalskispecial
10/02/2025MasonryAnthony Accardospecial
10/02/2025FinalAnthony Accardoprogress
10/02/2025Tenant Protection Plan Compliance—special
10/02/2025Structural Steel - WeldingAnthony Accardospecial
08/11/2025FinalAnthony Accardoprogress
08/11/2025Tenant Protection Plan ComplianceChester Kowalskispecial
08/11/2025MasonryAnthony Accardospecial
08/11/2025Sprayed fire-resistant materialsChester Kowalskispecial
08/11/2025Structural Steel - WeldingAnthony Accardospecial
08/11/2025Structural Steel - DetailsAnthony Accardospecial
05/27/2025MasonryWILLIAM DEGRAAFFspecial
05/27/2025Structural Steel - DetailsWILLIAM DEGRAAFFspecial
05/27/2025Tenant Protection Plan ComplianceWILLIAM DEGRAAFFspecial
05/27/2025Structural Stability – Alterations of existing buildingsWILLIAM DEGRAAFFspecial
Latest 25 of 96.
▾Documents — 1,069 on file (BIS + DOB NOW)
▸Plans & Drawings43
▸DOB NOWPlans/Sketch35
09/06/2026M00087306-I1Request digital key ↗
09/06/2026M00087298-I1Request digital key ↗
09/02/2026M00482390-P1Request digital key ↗
Showing 3 of 35 on file for this type
▸DOB NOWPlans/Sketch - Sign2
09/05/2026M00175101-I1Request digital key ↗
09/05/2026M00295196-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026M00330187-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Protection of Mechanical Methods1
09/03/2026M00471641-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00425186-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/03/2026M00471620-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00333870-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
08/15/2026M00153301-I1Request digital key ↗
▸Applications & Permits214
▸BISWORK PERMIT APPLICATION93
02/20/2024122675747Open ↗
09/16/2020123788632Open ↗
09/14/2020123764943Open ↗
Showing 3 of 93 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION88
10/23/2025120645551Open ↗
01/19/2024122675747Open ↗
01/12/2024122675747Open ↗
Showing 3 of 88 on file for this type
▸DOB NOWLPC Approval/Permit28
09/05/2026M00295196-I1Open ↗
09/04/2026M00333870-I1Open ↗
08/24/2026M01192788-I1Open ↗
Showing 3 of 28 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
08/26/2021123027321Open ↗
06/18/2020123913952Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
09/16/2020123788632Open ↗
▸Seals & Professional Certifications260
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION97
02/03/2020122723464Open ↗
02/03/2020122723464Open ↗
02/03/2020122723464Open ↗
Showing 3 of 97 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature43
09/06/2026M00087298-I1Open ↗
09/05/2026M00175101-I1Open ↗
09/05/2026M00295196-I1Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature35
09/23/2026M01095307-S1Open ↗
09/23/2026M01095307-S1Open ↗
09/23/2026M01095307-S1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWProgress Inspector Seal & Signature32
09/02/2026M01084668-I1Open ↗
09/01/2026M00330187-I1Open ↗
09/01/2026M00330187-I1Open ↗
Showing 3 of 32 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment71
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE18
06/07/2019123764943Open ↗
05/09/2019140740474Open ↗
04/24/2019123375613Open ↗
Showing 3 of 18 on file for this type
▸BISEQUIPMENT USE PERMITS16
11/03/2025120645551Open ↗
10/28/2025120645551Open ↗
01/29/2020122723464Open ↗
Showing 3 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING15
01/12/2024122675747Open ↗
09/17/2019140740474Open ↗
06/23/2019140740474Open ↗
Showing 3 of 15 on file for this type
▸BISSELF-CERT PLUMBING NOTICE14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
11/03/2025120645551Open ↗
10/28/2025120645551Open ↗
01/29/2020122723464Open ↗
Showing 3 of 6 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
10/28/2025120645551Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection16
▸BISTenant Protection Plan and Notes11
10/25/2019123788632Open ↗
06/24/2019123764943Open ↗
Showing 2 of 11 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
06/04/2020123788632Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWTenant Protection Plan2
09/05/2026M00295196-I1Open ↗
Showing 1 of 2 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos77
▸DOB NOWDEP ACP-5: Asbestos Assessment Report33
09/06/2026M00087298-I1Open ↗
09/05/2026M00175101-I1Open ↗
09/05/2026M00295196-I1Open ↗
Showing 3 of 33 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)26
10/25/2019123788632Open ↗
06/07/2019123764943Open ↗
Showing 2 of 26 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/13/2026M00853452-I1Open ↗
08/13/2026M00806230-I1Open ↗
08/13/2026M00853485-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance47
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS16
02/03/2020122723464Open ↗
02/03/2020122723464Open ↗
07/30/2019123764943Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: ENERGY7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
10/28/2025120645551Open ↗
12/15/2020123764943Open ↗
02/03/2020122723464Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
10/28/2025120645551Open ↗
10/27/2025120645551Open ↗
12/15/2020123764943Open ↗
Showing 3 of 6 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE5
10/25/2019123788632Open ↗
Showing 1 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
10/28/2025120645551Open ↗
02/06/2024122675747Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISNYCECC EXEMPTION1
06/22/2020123913952Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports27
▸BISTECHNICAL REPORT: RESPONSIBILITY20
10/28/2025120645551Open ↗
10/27/2025120645551Open ↗
08/26/2021123027321Open ↗
Showing 3 of 20 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)4
10/28/2025120645551Open ↗
02/06/2024122675747Open ↗
02/06/2024122675747Open ↗
Showing 3 of 4 on file for this type
▸BISDOB FINAL INSPECTION REQUIRED1
08/26/2021123027321Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMECHANICAL SYSTEMS1
10/28/2025120645551Open ↗
▸Approvals, Objections & Sign-offs98
▸BISLANDMARKS APPROVAL39
02/22/2021123788632Open ↗
06/22/2020123913952Open ↗
10/25/2019123788632Open ↗
Showing 3 of 39 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST27
10/29/2025120645551Open ↗
03/05/2024122675747Open ↗
02/28/2022123913952Open ↗
Showing 3 of 27 on file for this type
▸BISADMINISTRATIVE OBJECTIONS12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
11/03/2025120645551Open ↗
03/28/2019123097040Open ↗
Showing 2 of 7 on file for this type
▸BISLANDMARKS SIGNOFF7
10/29/2025120645551Open ↗
02/12/2024122675747Open ↗
02/28/2022123913952Open ↗
Showing 3 of 7 on file for this type
▸BISFINAL3
10/28/2025120645551Open ↗
02/06/2024122675747Open ↗
02/25/2022123913952Open ↗
▸BISCONSTRUCTION CODE DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSUPERSEDING LETTER1
09/14/2020123764943Open ↗
▸Cost, Insurance & Ownership79
▸BISCOST AFFIDAVIT72
10/28/2025120645551Open ↗
08/26/2021123027321Open ↗
04/06/2021123788632Open ↗
Showing 3 of 72 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
10/28/2025120645551Open ↗
02/06/2024122675747Open ↗
02/28/2022123913952Open ↗
Showing 3 of 4 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
06/26/2019122723464Open ↗
Showing 1 of 3 on file for this type
▸Filing & Intake Forms114
▸BISADDITIONAL INFORMATION41
01/19/2024122675747Open ↗
02/22/2021123788632Open ↗
08/27/2020123788632Open ↗
Showing 3 of 41 on file for this type
▸BISEFILING COVER SHEET38
06/18/2020123913952Open ↗
05/04/2020123913952Open ↗
10/25/2019123788632Open ↗
Showing 3 of 38 on file for this type
▸BISBOROUGH INTAKE FORM28
02/20/2024122675747Open ↗
09/14/2020123764943Open ↗
09/02/2020123764943Open ↗
Showing 3 of 28 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Other Documents14
▸DOB NOWProof of Historic Building9
08/13/2026M01114347-P4Open ↗
08/13/2026M08001478-I1Open ↗
08/13/2026M01114347-P3Open ↗
Showing 3 of 9 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
06/07/2019123764943Open ↗
Showing 1 of 4 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type