Roof11p · 8 filings · 20 docs
ArchitectureFire ProtectionStructural
Issued Permit Scope
Protection and Mechanical Methods · Standpipe · Supported Scaffold
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
install temporary fire standpipe pressurized alarm system for building being demolished
On file for this project
7 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Latest 3 of 8 filings on this floor.
Floor 692 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 682 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 672 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 662 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 652 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 642 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 632 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 622 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 612 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 602 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 592 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 582 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 572 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 562 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 552 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 542 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 532 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 522 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 512 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 502 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 492 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 482 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 472 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 462 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 452 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 442 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 432 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 422 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 412 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 402 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 392 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 382 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 372 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 362 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 352 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 342 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 332 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 322 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 312 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 302 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 292 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 282 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 272 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 262 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 252 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 242 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 232 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 222 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 212 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 208p · 4 filings · 16 docs
DMFire Protection
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
install temporary fire standpipe pressurized alarm system for building being demolished
On file for this project
7 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Latest 3 of 4 filings on this floor.
Floor 199p · 5 filings · 20 docs
DMFire Protection
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
install temporary fire standpipe pressurized alarm system for building being demolished
On file for this project
7 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 188p · 4 filings · 16 docs
DMFire Protection
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
install temporary fire standpipe pressurized alarm system for building being demolished
On file for this project
7 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Latest 3 of 4 filings on this floor.
Floor 179p · 5 filings · 20 docs
DMFire Protection
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
install temporary fire standpipe pressurized alarm system for building being demolished
On file for this project
7 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 168p · 4 filings · 16 docs
DMFire Protection
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
install temporary fire standpipe pressurized alarm system for building being demolished
On file for this project
7 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Latest 3 of 4 filings on this floor.
Floor 159p · 5 filings · 20 docs
DMFire Protection
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
install temporary fire standpipe pressurized alarm system for building being demolished
On file for this project
7 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 148p · 4 filings · 16 docs
DMFire Protection
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
install temporary fire standpipe pressurized alarm system for building being demolished
On file for this project
7 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Latest 3 of 4 filings on this floor.
Floor 138p · 4 filings · 16 docs
DMFire Protection
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
install temporary fire standpipe pressurized alarm system for building being demolished
On file for this project
7 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Latest 3 of 4 filings on this floor.
Floor 129p · 5 filings · 20 docs
DMFire Protection
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
install temporary fire standpipe pressurized alarm system for building being demolished
On file for this project
7 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 118p · 4 filings · 16 docs
DMFire Protection
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
install temporary fire standpipe pressurized alarm system for building being demolished
On file for this project
7 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Latest 3 of 4 filings on this floor.
Floor 109p · 5 filings · 20 docs
DMFire Protection
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
Installation and use of temporary protection screens as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
install temporary fire standpipe pressurized alarm system for building being demolished
On file for this project
7 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 98p · 3 filings · 12 docs
DMFire Protection
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
install temporary fire standpipe pressurized alarm system for building being demolished
On file for this project
7 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
No filed description on record for this project.
On file for this project
3 documents · 1 drawing sheet
Floor 89p · 4 filings · 16 docs
DMFire Protection
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
install temporary fire standpipe pressurized alarm system for building being demolished
On file for this project
7 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
INTERIOR NON-STRUCTURAL DEMOLITION OF 20-STORY (1st-12 floor & 14th to 21st floor, skip 13th floor) W/ CELLAR & ROOF TOWER MASONRY COMMERCIAL BUILDING LOCATED AT 989 6th AVENUE. NO CHANGE TO USE, EGRESS, OCCUPANCY UNDER THIS APPLICATION.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 78p · 3 filings · 12 docs
DMFire Protection
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
install temporary fire standpipe pressurized alarm system for building being demolished
On file for this project
7 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
No filed description on record for this project.
On file for this project
3 documents · 1 drawing sheet
Floor 69p · 4 filings · 16 docs
DMFire Protection
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
install temporary fire standpipe pressurized alarm system for building being demolished
On file for this project
7 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
INTERIOR NON-STRUCTURAL DEMOLITION OF 20-STORY (1st-12 floor & 14th to 21st floor, skip 13th floor) W/ CELLAR & ROOF TOWER MASONRY COMMERCIAL BUILDING LOCATED AT 989 6th AVENUE. NO CHANGE TO USE, EGRESS, OCCUPANCY UNDER THIS APPLICATION.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 58p · 3 filings · 12 docs
DMFire Protection
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
install temporary fire standpipe pressurized alarm system for building being demolished
On file for this project
7 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
No filed description on record for this project.
On file for this project
3 documents · 1 drawing sheet
Floor 49p · 4 filings · 16 docs
DMFire Protection
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
install temporary fire standpipe pressurized alarm system for building being demolished
On file for this project
7 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
INTERIOR NON-STRUCTURAL DEMOLITION OF 20-STORY (1st-12 floor & 14th to 21st floor, skip 13th floor) W/ CELLAR & ROOF TOWER MASONRY COMMERCIAL BUILDING LOCATED AT 989 6th AVENUE. NO CHANGE TO USE, EGRESS, OCCUPANCY UNDER THIS APPLICATION.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 38p · 3 filings · 12 docs
DMFire Protection
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
install temporary fire standpipe pressurized alarm system for building being demolished
On file for this project
7 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
No filed description on record for this project.
On file for this project
3 documents · 1 drawing sheet
Floor 29p · 4 filings · 16 docs
DMFire Protection
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
install temporary fire standpipe pressurized alarm system for building being demolished
On file for this project
7 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
INTERIOR NON-STRUCTURAL DEMOLITION OF 20-STORY (1st-12 floor & 14th to 21st floor, skip 13th floor) W/ CELLAR & ROOF TOWER MASONRY COMMERCIAL BUILDING LOCATED AT 989 6th AVENUE. NO CHANGE TO USE, EGRESS, OCCUPANCY UNDER THIS APPLICATION.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 19p · 3 filings · 12 docs
DMFire Protection
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
install temporary fire standpipe pressurized alarm system for building being demolished
On file for this project
7 documents
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
No filed description on record for this project.
On file for this project
3 documents · 2 drawing sheets
Mezzanine8p · 2 filings · 11 docs
DMFire Protection
Issued Permit Scope
Standpipe
install temporary fire standpipe pressurized alarm system for building being demolished
On file for this project
7 documents
INTERIOR NON-STRUCTURAL DEMOLITION OF 20-STORY (1st-12 floor & 14th to 21st floor, skip 13th floor) W/ CELLAR & ROOF TOWER MASONRY COMMERCIAL BUILDING LOCATED AT 989 6th AVENUE. NO CHANGE TO USE, EGRESS, OCCUPANCY UNDER THIS APPLICATION.
On file for this project
4 documents · 1 drawing sheet
Cellar7p · 1 filing · 7 docs
Fire Protection
Issued Permit Scope
Standpipe
install temporary fire standpipe pressurized alarm system for building being demolished
On file for this project
7 documents
Sub-Cellar1p · 1 filing · 4 docs
DM
INTERIOR NON-STRUCTURAL DEMOLITION OF 20-STORY (1st-12 floor & 14th to 21st floor, skip 13th floor) W/ CELLAR & ROOF TOWER MASONRY COMMERCIAL BUILDING LOCATED AT 989 6th AVENUE. NO CHANGE TO USE, EGRESS, OCCUPANCY UNDER THIS APPLICATION.
On file for this project
4 documents · 1 drawing sheet