← Back
Primarily 4 family with 1 store or office
989 HEGEMAN AVENUE
BROOKLYN · East New York-New Lots · BIN 3098370
💬 Discuss this project
1925Year Built
3Stories
S4Building Class
R5Zoning
4,800 sfGross Floor Area
5Units
Rent Stabilized21 Open Violations ▸FDNY Report ↗
Primarily 4 family with 1 store or office · Owner of record: GOLD ESTATES LLC · 1,800 sf lot · 2.67 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof1p · 1 filing · 6 docs
Floor 13p · 3 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KIWI GROCERY 2307/08/2026
GOLD ESTATES1003/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A M ENGINEERING SERVICES PC204/16/2024
ASHRAF CORP110/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AM ENGINEERING SERVICES403/21/2026
AN TONG FAN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JESUS CORPORANElectrical103/21/2026
CT IDEAL SUPPRESSIONGeneral Contractor107/08/2026
DFE CONTRACTOR LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAY KAVI CORPORATION8500110/24/2023
AM ENGINEERING SERVICES P7975111/17/2021
Building Lifecycle
All (67)Filed (3)Permit Issued (2)Signed Off (2)Violation (37)Inspection (2)Objection (14)Special Inspection (7)
02/13/2026
Violation issued (ECB, open)
Construction
12/10/2025
Violation issued (FDNY_ORDER, closed)
11/18/2025
Violation issued (HPD, closed)
I
06/09/2025
Violation issued (HPD, closed)
A
05/01/2025
Signed off — Alteration
INSTALL A NEW COMMERCIAL KITCHEN EXHAUST HOOD, DUCTWORK AT KITCHEN AND EXHAUST FAN ON THE ROOF, FIRE SUPPRESSION SYSTEM IS DONE BY OTHERS, THERE IS NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00942321-I1
01/08/2025
Permit issued — Mechanical Systems
B00942321-I1-MS
09/18/2024
Objection raised — Other
09/18/2024
Objection resolved — Addressed
09/16/2024
Objection resolved — Addressed
09/16/2024
Objection resolved — Addressed
09/16/2024
Objection resolved — Addressed
09/16/2024
Objection resolved — Addressed
05/03/2024
Objection resolved — Addressed
04/24/2024
Objection raised — Scope
04/16/2024
Filed — Alteration
Application filed in conjunction with MS application#B00942321 for proposed deli-grocery store use group 6. No change of use egress or occupancy.
B01027292-I1
04/10/2024
Violation issued (HPD, closed)
A
11/09/2023
Objection raised — Scope
11/09/2023
Objection raised — Scope
11/07/2023
Objection resolved — Addressed
10/27/2023
Objection raised — Scope
10/27/2023
Objection raised — Scope
10/27/2023
Objection raised — Scope
10/24/2023
Filed — Alteration
INSTALL A NEW COMMERCIAL KITCHEN EXHAUST HOOD, DUCTWORK AT KITCHEN AND EXHAUST FAN ON THE ROOF, FIRE SUPPRESSION SYSTEM IS DONE BY OTHERS, THERE IS NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00942321-I1
10/04/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jay Kavi
10/02/2023
Special inspection requirement — Mechanical Systems
Jay Kavi
10/02/2023
Special inspection requirement — Final
Eric Foster
03/23/2023
Violation issued (HPD, closed)
A
10/28/2022
Violation issued (ECB, open)
Construction
08/01/2022
Signed off — Alteration
REPLACE STRUCTURAL BEAMS AND RENOVATE COMMERCIAL STORE AND REPLACE EXISTING FLOOR WITH CERAMIC TILE AT 1ST FLOOR DUE TO FIRE DAMAGE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B00627739-I1
07/22/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/01/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/25/2022
Violation issued (HPD, closed)
A
02/04/2022
Permit issued — General Construction
B00627739-I1-GC
12/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/17/2021
Filed — Alteration
REPLACE STRUCTURAL BEAMS AND RENOVATE COMMERCIAL STORE AND REPLACE EXISTING FLOOR WITH CERAMIC TILE AT 1ST FLOOR DUE TO FIRE DAMAGE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B00627739-I1
11/17/2021
Special inspection requirement — Fire-Resistance Rated Construction
Albert Munoz
11/17/2021
Special inspection requirement — Energy Code Compliance Inspections
Albert Munoz
11/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Albert Munoz
11/09/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Albert Munoz
11/04/2021
Violation issued (ECB, closed)
Construction
09/07/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/07/2021
Violation issued (ECB, closed)
Construction
09/07/2021
Violation issued (ECB, closed)
Construction
04/09/2021
Violation issued (HPD, closed)
A
02/28/2020
Violation issued (HPD, closed)
C
08/21/2019
Violation issued (HPD, closed)
A
08/21/2019
Violation issued (HPD, open)
B
08/21/2019
Violation issued (HPD, open)
B
08/21/2019
Violation issued (HPD, open)
B
08/21/2019
Violation issued (HPD, open)
A
08/21/2019
Violation issued (HPD, open)
A
08/21/2019
Violation issued (HPD, open)
B
08/21/2019
Violation issued (HPD, open)
B
08/21/2019
Violation issued (HPD, open)
B
08/21/2019
Violation issued (HPD, open)
B
08/21/2019
Violation issued (HPD, open)
B
08/21/2019
Violation issued (HPD, open)
A
08/21/2019
Violation issued (HPD, open)
B
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCT IDEAL SUPPRESSION01/08/2025
DOB NOWGeneral ConstructionSigned-offDFE CONTRACTOR LLC02/04/2022
BISPLISSUEDSENID PL & HTG CORP03/05/2008
BISOTISSUEDEMPIRE COMMERCIAL CORP08/30/2007
5 projects · most recent 03/02/2022
General Wiring
FiledStatusContractorScope
03/02/2022Permit IssuedJECO ELEC'L SERVICE CORP.General Wiring
10/29/2021CompleteJECO ELEC'L SERVICE CORP.General Wiring
10/29/2021CompleteJECO ELEC'L SERVICE CORP.General Wiring
10/06/2021CancelledJECO ELEC'L SERVICE CORP.General Wiring
09/20/2021CancelledJECO ELEC'L SERVICE CORP.General Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/22/2022Pass-Final General Construction Non-Directive 14PassView ↗
06/01/2022Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
10/02/2023Fire-Resistant Penetrations and JointsJay Kavispecial
10/02/2023Mechanical SystemsJay Kavispecial
10/02/2023FinalEric Fosterprogress
11/17/2021Fire-Resistance Rated ConstructionAlbert Munozprogress
11/17/2021Energy Code Compliance InspectionsAlbert Munozprogress
11/09/2021Fire-Resistant Penetrations and JointsAlbert Munozspecial
11/09/2021Structural Stability – Alterations of existing buildingsAlbert Munozspecial
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/31/2026B00627739-I1Request digital key ↗
08/26/2026B00942321-I1Request digital key ↗
08/25/2026B01027292-I1Request digital key ↗
▸Seals & Professional Certifications10
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B00627739-I1Open ↗
09/01/2026B00627739-I1Open ↗
08/25/2026B00942321-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/31/2026B00627739-I1Open ↗
08/13/2026B00942321-I1Open ↗
08/13/2026B01027292-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026B00627739-I1Open ↗
09/01/2026B00627739-I1Open ↗
08/25/2026B00942321-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/31/2026B00627739-I1Open ↗
08/13/2026B00942321-I1Open ↗
08/13/2026B01027292-I1Open ↗