Predominantly retail with other uses
99-09 37 AVENUE
QUEENS · North Corona · BIN 4043211
💬 Discuss this project
2023Year Built
3Stories
K4Building Class
R6BZoning
6,814 sfGross Floor Area
3Units
Rent Stabilized0 Open Violations
Predominantly retail with other uses · Owner of record: TKL HOLDING LLC · 2,500 sf lot · 2.73 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
Roof30p · 6 filings · 20 docs
Floor 326p · 4 filings · 20 docs
Floor 229p · 4 filings · 20 docs
Floor 1Under Construction29p · 5 filings · 20 docs
Cellar37p · 6 filings · 20 docs
Site & exterior22p · 3 filings · 20 docs
Filed — no permit issued4p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BEST CONTRACTOR5807/08/2026
GLUZ603/21/2026
KEAT HOLDING503/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/25/2017$994K—Private party → GLUZ INC.— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design, LLC203/21/2026
AN SHEN MA ARCHITECT1103/21/2026
AMERGY SOLAR203/21/2026
FRANK BUENO EXPEDITING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
S & L PLUMBING INCPlumbing603/22/2026
STRUCTURE R US INCGeneral Contractor507/08/2026
TRI BOROUGH SCAFFOLDINGGeneral Contractor407/08/2026
MC SUPERSTRUCTURE INCGeneral Contractor403/21/2026
AMERGY SOLAR INCGeneral Contractor303/21/2026
HP SERVICES INCPlumbing207/08/2026
TRISTAR DEVELOPING INCGeneral Contractor203/21/2026
EXPERT FIRE SPRINKLER,LLCFire Protection207/08/2026
AN SHEN MA ARCHITECTGeneral Contractor103/22/2026
AL-LECTRIC ELECT'L CONTRGElectrical103/22/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
SIGNORE & SONS PLBG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSEPH BOTTA, PE, PC1139203/19/2025
SQ. ARCH, LLC4802109/10/2024
Z & T ENGINEERING, P.C.5911107/03/2024
AN SHEN MA ARCHITECT2968305/07/2024
Building Lifecycle
All (185)Filed (27)Permit Issued (14)Signed Off (10)Violation (60)Inspection (8)Objection (36)Special Inspection (30)
01/22/2026
Permit issued — Plumbing
Q01184461-I1-PL
05/30/2025
Objection resolved — Addressed
05/30/2025
Objection resolved — Addressed
05/13/2025
Objection resolved — Addressed
04/17/2025
Objection resolved — Addressed
04/17/2025
Objection resolved — Addressed
04/01/2025
Objection resolved — Addressed
04/01/2025
Objection resolved — Addressed
03/26/2025
Objection raised — Other
03/26/2025
Objection raised — Structural
03/26/2025
Objection raised — Scope
03/26/2025
Objection raised — Scope
03/26/2025
Objection raised — Fire_Protection
03/26/2025
Objection raised — Scope
03/26/2025
Objection raised — Admin
03/19/2025
Filed — Alteration
Interior renovation of existing commercial space Use group 6, Installation of Commercial Kitchen hood from first floor to roof for New restaurant as per plan. No change in use, occupancy or egress
Q01184451-I1
03/18/2025
Filed — Alteration
Q01184461-I1
12/18/2024
Signed off — Alteration
Q01107166-I1
09/13/2024
Permit issued — Solar
Q01107166-I1-SL
09/10/2024
Filed — Alteration
Q01107166-I1
09/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chun Feng
09/06/2024
Special inspection requirement — Air barrier - visual inspection
Chun Feng
09/06/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chun Feng
09/06/2024
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
09/06/2024
Special inspection requirement — Final
Chun Feng
08/02/2024
Signed off — Alteration
TO INSTALL PLUMBING FIXTURES IN PROPOSED 3 STORY MIXED NB CONTAINING 2 FAMILY DWELLING AND COMMERCIAL USE. FILED IN CONJUNCTION WITH NB #440663596. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q00515392-I1
08/02/2024
Signed off — Alteration
NEW THREE STORY MIXED BUILDING.
Q00527683-I1
08/02/2024
Signed off — Alteration
filing sprinkler work type in conjunction with NB#440663596
Q00526956-I1
08/02/2024
Signed off — Alteration
Q00526952-I1
08/02/2024
Signed off — Alteration
INSTALLATION OF CONCRETE FOUNATION FOR NEW THREE STORY MIXED BUILDING.
Q00589694-I1
07/31/2024
Signed off — Alteration
SUPPORT OF EXCAVATION FOR NEW THREE STORY MIXED BUILDING.
Q00527710-I1
07/30/2024
Permit issued — Support of Excavation
Q00527710-I1-SE
07/05/2024
Special inspection requirement — Sprinkler Systems
Fei Zeng
07/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fei Zeng
07/03/2024
Filed — Alteration
filing sprinkler work type in conjunction with NB#440663596
Q00526956-P1
06/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fei Zeng
06/24/2024
Special inspection requirement — Sprinkler Systems
Fei Zeng
05/07/2024
Filed — Alteration
TO INSTALL PLUMBING FIXTURES IN PROPOSED 3 STORY MIXED NB CONTAINING 2 FAMILY DWELLING AND COMMERCIAL USE. FILED IN CONJUNCTION WITH NB #440663596. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q00515392-P2
05/07/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
AN MA
05/07/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
AN MA
05/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
AN MA
05/07/2024
Special inspection requirement — Energy Code Compliance Inspections
AN MA
05/07/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
AN MA
05/07/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
AN MA
05/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
AN MA
05/07/2024
Special inspection requirement — Energy Code Compliance Inspections
AN MA
04/01/2024
Signed off — Alteration
TO ADD BE WORK TYPE FOR THE INSTALLATION OF ONE BOILER OUT OF TWO FOR THE TWO DWELLING UNITS OF THIS MIXED BUILDING NB. WORK LIMITED TO BOILERS ONLY, ALL OTHER WORK DONE UNDER SEPARATE NB #440663596, MS #440663596 & PL #Q00515392 APPLICATIONS.
Q00531309-I1
04/01/2024
Signed off — Alteration
TO ADD BE WORK TYPE FOR THE INSTALLATION OF ONE BOILER OUT OF TWO FOR THE TWO DWELLING UNITS OF THIS MIXED BUILDING NB. WORK LIMITED TO BOILERS ONLY, ALL OTHER WORK DONE UNDER SEPARATE NB #440663596, MS #440663596 & PL #Q00515392 APPLICATIONS.
Q00531309-S1
03/26/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/21/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/13/2024
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
03/01/2024
Filed — Alteration
TO ADD BE WORK TYPE FOR THE INSTALLATION OF ONE BOILER OUT OF TWO FOR THE TWO DWELLING UNITS OF THIS MIXED BUILDING NB. WORK LIMITED TO BOILERS ONLY, ALL OTHER WORK DONE UNDER SEPARATE NB #440663596, MS #440663596 & PL #Q00515392 APPLICATIONS.
Q00531309-P3
02/16/2024
Permit issued — Sprinklers
Q00526956-I1-EW-SP
02/15/2024
Filed — Alteration
TO ADD BE WORK TYPE FOR THE INSTALLATION OF ONE BOILER OUT OF TWO FOR THE TWO DWELLING UNITS OF THIS MIXED BUILDING NB. WORK LIMITED TO BOILERS ONLY, ALL OTHER WORK DONE UNDER SEPARATE NB #440663596, MS #440663596 & PL #Q00515392 APPLICATIONS.
Q00531309-P2
01/31/2024
Permit issued — Boiler Equipment
Q00531309-S1-BE
01/30/2024
Permit issued — Boiler Equipment
Q00531309-I1-BE
11/13/2023
Filed — Alteration
TO ADD BE WORK TYPE FOR THE INSTALLATION OF ONE BOILER OUT OF TWO FOR THE TWO DWELLING UNITS OF THIS MIXED BUILDING NB. WORK LIMITED TO BOILERS ONLY, ALL OTHER WORK DONE UNDER SEPARATE NB #440663596, MS #440663596 & PL #Q00515392 APPLICATIONS.
Q00531309-S1
11/13/2023
Filed — Alteration
TO ADD BE WORK TYPE FOR THE INSTALLATION OF ONE BOILER OUT OF TWO FOR THE TWO DWELLING UNITS OF THIS MIXED BUILDING NB. WORK LIMITED TO BOILERS ONLY, ALL OTHER WORK DONE UNDER SEPARATE NB #440663596, MS #440663596 & PL #Q00515392 APPLICATIONS.
Q00531309-P1
11/01/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/01/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 185 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedSIGNORE & SONS PLBG CORP01/22/2026
DOB NOWSolarSigned-offAMERGY SOLAR INC09/13/2024
DOB NOWSupport of ExcavationSigned-offTRISTAR DEVELOPING INC07/30/2024
DOB NOWSprinklersSigned-offEXPERT FIRE SPRINKLER,LLC02/16/2024
DOB NOWBoiler EquipmentSigned-offHP SERVICES INC01/31/2024
DOB NOWBoiler EquipmentSigned-offHP SERVICES INC01/30/2024
DOB NOWSprinklersSigned-offEXPERT FIRE SPRINKLER,LLC08/31/2023
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC07/14/2023
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP04/15/2023
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING02/14/2023
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING02/14/2023
DOB NOWMechanical SystemsSigned-offSTRUCTURE R US INC01/12/2023
DOB NOWStructuralSigned-offSTRUCTURE R US INC07/06/2022
DOB NOWFoundationSigned-offSTRUCTURE R US INC07/06/2022
BISEQISSUEDSTRUCTURE R US INC09/05/2023
BIS—ISSUEDSTRUCTURE R US INC09/05/2023
BIS—ISSUEDSTRUCTURE R US INC05/31/2023
BIS—ISSUEDSTRUCTURE R US INC01/23/2023
BISEQISSUEDSTRUCTURE R US INC06/15/2022
BIS—ISSUEDNONE08/25/2017
BISEQISSUEDNY DRILLING INC06/20/2017
BISEQISSUEDRVH CONTRACTING CORP02/17/2005
BIS—ISSUEDJGL CONTRACTING06/15/2004
BISEQISSUEDJGL CONTRACTING06/15/2004
BIS—ISSUEDJGL CONTRACTING03/09/2004
BISEQISSUEDJGL CONTRACTING03/09/2004
1 project · most recent 03/19/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/19/2025——Ventilation Systems
Ventilation
N/A ×1
3 projects · most recent 09/09/2024
General Wiring
FiledStatusContractorScope
09/09/2024CompleteI.P. ELECTRIC INC—
11/13/2023CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
02/16/2023CompleteNASH ELECTRIC SERVICES IN—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/26/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/21/2024Pass-Final Boiler Equipment InspectionPassView ↗
03/13/2024No Access-Final Boiler Equipment InspectionNo AccessView ↗
11/01/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/01/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/01/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/26/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/26/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 65
DateRequirementInspectorRole
09/06/2024FinalChun Fengprogress
09/06/2024Fire-Resistant Penetrations and JointsChun Fengspecial
09/06/2024Structural Stability – Alterations of existing buildingsChun Fengspecial
09/06/2024Energy Code Compliance InspectionsChun Fengprogress
09/06/2024Air barrier - visual inspectionChun Fengenergy_progress
07/05/2024Fire-Resistant Penetrations and JointsFei Zengspecial
07/05/2024Sprinkler SystemsFei Zengspecial
06/24/2024Fire-Resistant Penetrations and JointsFei Zengspecial
06/24/2024Sprinkler SystemsFei Zengspecial
05/07/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationAN MAspecial
05/07/2024HVAC-R and service water piping design and insulationAN MAenergy_progress
05/07/2024Fire-Resistant Penetrations and JointsAN MAspecial
05/07/2024Energy Code Compliance InspectionsAN MAprogress
05/07/2024HVAC-R and service water piping design and insulationAN MAenergy_progress
05/07/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationAN MAspecial
05/07/2024Fire-Resistant Penetrations and JointsAN MAspecial
05/07/2024Energy Code Compliance InspectionsAN MAprogress
10/13/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationAN MAspecial
10/13/2023HVAC-R and service water piping design and insulationAN MAenergy_progress
10/13/2023Energy Code Compliance InspectionsAN MAprogress
10/13/2023Fire-Resistant Penetrations and JointsAN MAspecial
11/14/2022FinalFei Zengprogress
11/14/2022Footing and FoundationFei Zengprogress
11/14/2022UnderpinningFei Zengspecial
11/14/2022Subgrade InspectionsFei Zengspecial
Latest 25 of 65.
▾Documents — 172 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch27
08/27/2026Q00527683-P2Request digital key ↗
08/27/2026Q00527683-I1Request digital key ↗
08/27/2026Q00527683-P3Request digital key ↗
Showing 3 of 27 on file for this type
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION9
11/16/2024401229844Open ↗
09/30/2024401229844Open ↗
02/17/2023401229844Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION4
07/20/2022421492682Open ↗
12/02/2019421492682Open ↗
08/28/2017421492673Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
06/24/2024421767378Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
02/14/2022421767378Open ↗
▸Seals & Professional Certifications85
▸DOB NOWSpecial Inspector Seal & Signature40
09/02/2026Q00527683-I1Open ↗
09/02/2026Q00527683-I1Open ↗
09/02/2026Q00527683-I1Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature27
08/27/2026Q00527683-I1Open ↗
08/27/2026Q00527683-P2Open ↗
08/27/2026Q00515392-P1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/02/2026Q00527683-I1Open ↗
08/31/2026Q00589694-I1Open ↗
08/31/2026Q00589694-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
06/26/2019421525120Open ↗
06/10/2019421525120Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/09/2017421492682Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/09/2017421492682Open ↗
▸Trade Schedules & Equipment5
▸BISSEWER CUT-OFF2
08/28/2017421492673Open ↗
08/28/2017421492673Open ↗
▸BISGAS CUT-OFF1
08/28/2017421492673Open ↗
▸BISELECTRIC CUT-OFF1
08/28/2017421492673Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/10/2019421525120Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
02/14/2022421767378Open ↗
06/10/2019421525120Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
08/28/2017421492673Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
08/28/2017421492673Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/28/2017421492673Open ↗
▸BISRODENT CONTROL1
08/28/2017421492673Open ↗
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00515392-I1Open ↗
08/13/2026Q00526952-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/09/2022421492682Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/10/2019421525120Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: SOIL INSPECTION1
06/26/2019421525120Open ↗
▸Approvals, Objections & Sign-offs10
▸BISLETTERS - SUPPORTING DOCUMENTATION4
02/14/2022421767378Open ↗
08/28/2017421492673Open ↗
08/28/2017421492673Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/13/2023421492682Open ↗
▸BISLANDMARKS SIGNOFF1
08/28/2017421492673Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
06/10/2019421525120Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
06/24/2024421767378Open ↗
▸BISSUPERSEDING LETTER1
07/20/2022421492682Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01107166-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
06/24/2024421767378Open ↗
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET4
06/02/2020421767378Open ↗
06/10/2019421525120Open ↗
06/13/2017421492673Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
07/20/2022421492682Open ↗
06/02/2020421767378Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
06/02/2020421767378Open ↗
▸Other Documents11
▸BISBPP - SUPPORTING DOCUMENTATION6
06/24/2024421767378Open ↗
06/24/2024421767378Open ↗
06/24/2024421767378Open ↗
Showing 3 of 6 on file for this type
▸BISPLOT DIAGRAM1
06/10/2019421525120Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
02/10/2022421767378Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
12/02/2019421492682Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
06/24/2024421767378Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00527710-I1Open ↗