← Back
BuildNYC
Elevator cooperative
99-10 60TH AVENUE
QUEENS · Corona · BIN 4047914
💬 Discuss this project
1961Year Built
6Stories
D4Building Class
R7BZoning
74,300 sfGross Floor Area
67Units
LL97 CoveredRent Stabilized16 Active Violations 15 unresolved · 1 paperwork only 1 old, status unconfirmed ▸FISP: SWARMP
Elevator cooperative · Owner of record: Sherwood Village Coop 'A' · 22,535 sf lot · 3.3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofMetro ManagementUnder Construction3p · 4 filings · 15 docs
Floor 2Unit 2D6p · 2 filings · 13 docs
Floor 1Installation of Heavy Duty Sidewalk ShedUnder Construction3p · 1 filing · 5 docs
Site & exteriorMetro Management DevelopmentUnder Construction9p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Sherwood Village Co-Ops2003/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Asr Engineering207/07/2026
Bayside Associates311/05/2025
Rak Design109/24/2024
Psarchitecture103/22/2021
Tectonic Engineering206/16/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Banji Awosika Architect203/21/2026
Expediting103/21/2026
CSR Expediters103/21/2026
Construction Permit Services203/21/2026
Professional Design Consultants203/21/2026
CCM Services Group103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Levest Electricspecialty_contractor603/21/2026
Allstate RenovationGeneral Contractor507/08/2026
Topline NYCScaffold307/25/2026
G. & S. Plumbing & Heating CoPlumbing106/28/2026
Metro RF ServicesGeneral Contractor107/08/2026
Tenacity ConstructionGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD Testing & Inspection S7010311/05/2025
Rak Design7699209/24/2024
Rock Arch Engineering1760109/24/2024
Advanced Engineering &1224109/13/2024
Building Lifecycle
All (130)Filed (10)Permit Issued (15)Signed Off (5)Facade (FISP) (13)Violation (52)Inspection (1)Objection (20)Special Inspection (14)
10/19/2026
Signed off — Alteration
PROPOSED "PLUMBING WORKS" FOR EXISTING BUILDING (APARTMENT 2D) TWO BATHROOMS, AS PER PLAN. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q01233946-I1
07/31/2026
Signed off — Alteration
PROPOSED INTERIOR RENOVATION WORK FOR EXISTINGBUILDING (APARTMENT 2D BATHROOMS), AS PER PLAN. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
Q01259262-I1
07/24/2026
Permit issued — Sidewalk Shed
Q01093176-I1-SH
07/07/2026
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01093176-P1
05/22/2026
Violation issued (ECB, closed)
Construction
05/22/2026
Violation issued (ECB, closed)
Construction
03/03/2026
Permit issued — Suspended Scaffold
Q01106107-I1-SC
01/21/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/05/2025
Filed — Alteration
PROPOSED "PLUMBING WORKS" FOR EXISTING BUILDING (APARTMENT 2D) TWO BATHROOMS, AS PER PLAN. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q01233946-P1
11/05/2025
Permit issued — General Construction
Q01098821-I1-GC
10/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
10/20/2025
Special inspection requirement — Tenant Protection Plan Compliance
XIUCHENG LI
09/25/2025
Permit issued — General Construction
Q01259262-I1-GC
09/03/2025
Objection resolved — Addressed
09/03/2025
Objection resolved — Addressed
09/03/2025
Objection resolved — Addressed
09/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
08/12/2025
Special inspection requirement — Final
XIUCHENG LI
08/05/2025
Objection raised — Scope
08/05/2025
Objection raised — Scope
08/01/2025
Objection raised — Admin
07/30/2025
Permit issued — Sidewalk Shed
Q01093176-I1-SH
07/25/2025
Filed — Alteration
PROPOSED INTERIOR RENOVATION WORK FOR EXISTINGBUILDING (APARTMENT 2D BATHROOMS), AS PER PLAN. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
Q01259262-I1
07/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
07/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
XIUCHENG LI
07/21/2025
Special inspection requirement — Demolition
XIUCHENG LI
07/17/2025
Permit issued — Plumbing
Q01233946-I1-PL
06/04/2025
Filed — Alteration
PROPOSED "PLUMBING WORKS" FOR EXISTING BUILDING (APARTMENT 2D) TWO BATHROOMS, AS PER PLAN. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q01233946-I1
01/16/2025
Permit issued — Suspended Scaffold
Q01106107-I1-SC
11/13/2024
Permit issued — General Construction
Q01098821-I1-GC
10/07/2024
Permit issued — Suspended Scaffold
Q01106107-I1-SC
09/24/2024
Filed — Alteration
Q01098821-I1
09/13/2024
Filed — Alteration
Suspended Scaffold Installation For Facade Restoration And Inspection
Q01106107-I1
09/10/2024
Special inspection requirement — Tenant Protection Plan Compliance
Craig Jirak
09/04/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Jerry Pitera
09/04/2024
Special inspection requirement — Post-installed Anchors
Jerry Pitera
08/20/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
BRIAN O'CONNOR
08/20/2024
Special inspection requirement — Post-installed Anchors
Craig Jirak
08/20/2024
Special inspection requirement — Masonry
Craig Jirak
08/20/2024
Special inspection requirement — Final
Craig Jirak
08/12/2024
Permit issued — Sidewalk Shed
Q01093176-I1-SH
08/09/2024
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01093176-I1
05/21/2023
Cycle 9 facade report submitted
05/18/2023
Cycle 9 facade report signed — SWARMP
05/03/2023
Cycle 9 facade inspection completed
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/25/2022
Permit issued — Antenna
Q00298244-I1-AN
04/12/2021
Signed off — Alteration
PROPOSED RAMP SLAB REPLACEMENT AS PER PLANS
Q00489585-I1
04/06/2021
Permit issued — General Construction
Q00489585-I1-GC
03/22/2021
Filed — Alteration
PROPOSED RAMP SLAB REPLACEMENT AS PER PLANS
Q00489585-I1
10/20/2020
Signed off — Alteration
Q00350123-I1
08/13/2020
Permit issued — Antenna
Q00350123-I1-AN
06/17/2020
Objection raised — 2014-AN AC 28-104.11-Building
06/17/2020
Objection resolved — Addressed
06/17/2020
Objection raised — 1998-AN AC 28-103.14.1-Adminis
06/17/2020
Objection resolved — Addressed
06/17/2020
Objection raised — 2014-AN AC 28-104.7.1-Administ
06/17/2020
Objection resolved — Addressed
06/17/2020
Objection raised — 2014-AN BC 1704-Building Code-
06/17/2020
Objection resolved — Addressed
Latest 60 of 130 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedTopline NYC07/24/2026
DOB NOWSuspended ScaffoldPermit IssuedBig Apple Renovation & RE03/03/2026
DOB NOWGeneral ConstructionPermit IssuedAllstate Renovation11/05/2025
DOB NOWGeneral ConstructionSigned-offTenacity Construction09/25/2025
DOB NOWSidewalk ShedPermit IssuedTopline NYC07/30/2025
DOB NOWPlumbingSigned-offG. & S. Plumbing & Heating Co07/17/2025
DOB NOWSuspended ScaffoldPermit IssuedBig Apple Renovation & RE01/16/2025
DOB NOWGeneral ConstructionPermit IssuedAllstate Renovation11/13/2024
DOB NOWSuspended ScaffoldPermit IssuedBig Apple Renovation & RE10/07/2024
DOB NOWSidewalk ShedPermit IssuedTopline NYC08/12/2024
DOB NOWAntennaPermit IssuedLevest Electric01/25/2022
DOB NOWGeneral ConstructionSigned-offAllstate Renovation04/06/2021
DOB NOWAntennaSigned-offLevest Electric08/13/2020
DOB NOWAntennaPermit IssuedLevest Electric06/16/2020
DOB NOWAntennaSigned-offMetro RF Services08/03/2018
BISOTISSUEDAllstate Renovation10/29/2020
BISMHISSUEDWireless Network Group12/12/2018
BISOTISSUEDXinos Construction07/13/2016
BISEQISSUEDXinos Construction07/07/2016
BISOTISSUEDMetro RF Services05/18/2016
BISOTISSUEDBrasal Preservation Grou*03/26/2014
BISEQISSUEDXinos Construction03/07/2014
BISOTISSUEDBras AL Construction12/27/2013
BISEQISSUEDXinos Construction03/12/2013
BISEQISSUEDXinos Construction02/15/2013
BISOTISSUEDApplied Electric02/15/2002
BISOTISSUEDAgellon Restoration11/29/2001
BISMHISSUEDClear Communication11/07/2001
BISEQISSUEDPSG Construction Co09/20/2001
BISOTISSUEDCellular Telephone Co.d/B/A AT&T08/03/2000
BISFSISSUEDAbilene10/21/1993
BISPLISSUEDBMC Plumbing10/21/1993
1 project · most recent 11/05/2025
Water/Sanitary
FiledStatusContractorScope
11/05/2025Signed-offG. & S. Plumbing & Heating CoWater/Sanitary
1 project · most recent 08/13/2024
FiledStatusContractorScope
08/13/2024Permit IssuedRichard Neu—
1 project · most recent 07/25/2025
FiledStatusContractorScope
07/25/2025Signed-offTenacity Construction1 scope_items
1 project · most recent 07/07/2026
Sidewalk Shed
FiledStatusContractorScope
07/07/2026Permit IssuedTopline NYCSidewalk Shed
1 project · most recent 09/13/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
09/13/2024Permit IssuedBig Apple Renovation & RESuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/21/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
10/20/2025Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
10/20/2025Tenant Protection Plan ComplianceXIUCHENG LIspecial
09/03/2025Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
08/12/2025FinalXIUCHENG LIprogress
07/21/2025Fire-Resistance Rated ConstructionXIUCHENG LIprogress
07/21/2025Tenant Protection Plan ComplianceXIUCHENG LIspecial
07/21/2025DemolitionXIUCHENG LIspecial
09/10/2024Tenant Protection Plan ComplianceCraig Jirakspecial
09/04/2024Alternative Materials - OTCR Buildings Bulletin NumberJerry Piteraspecial
09/04/2024Post-installed AnchorsJerry Piteraspecial
08/20/2024Structural Stability – Alterations of existing buildingsBRIAN O'CONNORspecial
08/20/2024Post-installed AnchorsCraig Jirakspecial
08/20/2024MasonryCraig Jirakspecial
08/20/2024FinalCraig Jirakprogress
▾Documents — 168 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch9
08/27/2026Q00489585-I1Request digital key ↗
08/21/2026Q01093176-P1Request digital key ↗
08/21/2026Q01093176-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Antenna1
08/15/2026Q00350123-I1Request digital key ↗
▸Applications & Permits18
▸BISWORK PERMIT APPLICATION10
10/29/2020440608754Open ↗
12/22/2018421693554Open ↗
07/18/2016440273829Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION8
12/09/2025440608754Open ↗
02/02/2021440608754Open ↗
07/27/2020440608754Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications42
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
03/01/2019421693554Open ↗
12/22/2018421693554Open ↗
12/22/2018421693554Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/28/2026Q00350123-I1Open ↗
08/27/2026Q00489585-I1Open ↗
08/21/2026Q01093176-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
10/08/2026Q01098821-I1Open ↗
10/08/2026Q01098821-I1Open ↗
10/08/2026Q01098821-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
07/27/2020440608754Open ↗
07/06/2016440318014Open ↗
02/14/2013440041759Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
07/06/2016440318014Open ↗
02/14/2013440041759Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
07/06/2016440318014Open ↗
02/14/2013440041759Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
07/27/2020440608754Open ↗
02/23/2016440273829Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
10/08/2026Q01098821-I1Open ↗
08/24/2026Q01259262-I1Open ↗
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes3
07/27/2020440608754Open ↗
12/22/2018421693554Open ↗
04/07/2016421308070Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
12/11/2013420883627Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
01/08/2014420883627Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026Q00350123-I1Open ↗
▸Environmental & Asbestos12
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
02/02/2021440608754Open ↗
07/27/2020440608754Open ↗
11/28/2018421693554Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/21/2026Q01098821-I1Open ↗
08/19/2026Q01259262-I1Open ↗
08/18/2026Q01233946-I1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
03/01/2019421693554Open ↗
12/22/2018421693554Open ↗
12/22/2018421693554Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
10/26/2020440608754Open ↗
02/03/2017440273829Open ↗
07/09/2016440273829Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
03/01/2019421693554Open ↗
11/07/2018421308070Open ↗
03/01/2017440273829Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/27/2020440608754Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/15/2025440608754Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/30/2025440608754Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY6
07/27/2020440608754Open ↗
02/03/2017440273829Open ↗
07/06/2016440318014Open ↗
Showing 3 of 6 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
12/08/2025440608754Open ↗
▸Approvals, Objections & Sign-offs17
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
12/31/2025440608754Open ↗
03/01/2019421693554Open ↗
11/21/2018421308070Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
03/01/2017440273829Open ↗
10/24/2014420883627Open ↗
03/31/2014420883627Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
04/07/2016421308070Open ↗
08/23/2013420883627Open ↗
▸BISSHED LETTER2
03/11/2014440041759Open ↗
03/16/2013440041759Open ↗
▸BISFINAL1
12/22/2025440608754Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT12
02/02/2021440608754Open ↗
07/27/2020440608754Open ↗
03/01/2019421693554Open ↗
Showing 3 of 12 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
03/31/2014420883627Open ↗
01/08/2014420883627Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
12/14/2025440608754Open ↗
▸Filing & Intake Forms20
▸BISADDITIONAL INFORMATION10
03/24/2021440608754Open ↗
02/02/2021440608754Open ↗
10/26/2020440608754Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
07/27/2020440608754Open ↗
07/06/2016440318014Open ↗
02/23/2016440273829Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET3
11/28/2018421693554Open ↗
04/07/2016421308070Open ↗
08/23/2013420883627Open ↗
▸BISBOROUGH INTAKE FORM3
11/07/2018421308070Open ↗
12/13/2017440041759Open ↗
12/13/2017440318014Open ↗
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
02/14/2013440041759Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026Q01106107-I1Open ↗
▸DOB NOWCalculations1
08/13/2026Q01106107-I1Open ↗