ECB08/24/2026OBSERVED: SITE CLOSED UPON EXTERIOR INSPECTION NOTED FENCE DOES NOT COMPLETED PAINTED GREEN HUNTER AND PANEL VIEW NOT MAINTAINED PROPER SIZE AND FORM CONTRARY TO BUILDING CODE$1K due
ECB04/17/2026FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.ATOI,GENERAL CONTRACTORFAILED TO FILE A CERTIFICATE OF CORRECTION FOR VIOLATION#39550471X.REM$1K due
ECB04/17/2026FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.ATOI,GENERAL CONTRACTORFAILED TO FILE A CERTIFICATE OF CORRECTION FOR VIOLATION#39550475N.REM$1K due
ECB04/16/2026FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.ATOI,GENERAL CONTRACTORFAILED TO FILE A CERTIFICATE OF CORRECTION FOR VIOLATION#39550477R.REM$1K due
ECB04/16/2026FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.ATOI,GENERAL CONTRACTORFAILED TO FILE A CERTIFICATE OF CORRECTION FOR VIOLATION#39550476P.REM$1K due
DOB02/25/2026EMERGENCY: CNA REPORT DATE 02/18/26: EARTHWORK UNSTABLE; REAR GARAGES POTENTIALLY COMPROMISED. WALL SURCHARGE & DEBRIS. ACTION NEEDED REMEDY / REQUIREMENTS: BACKFILL/STABILIZE SITE. HIRE RDP, CS & GC SUBMIT DOCS BY 02/27/26. DAILY REPORTS & PERMITS REQ. FILE IN 2 DAYS
ECB02/17/2026OBSERVED STORAGE/ PLACEMENT OF STRUCTURAL STEEL I-BEAMS ON CMU WALLS NOT REFLECTED ON APPROVED PLANS TO VERIFY LOADS CAPACITY FOR PLACEMENT OF LOADS. CONTRARY TO BC 3305.3.1.1 STOP ALL WORK AT EXTERIOR EXTENSIO$5K due
ECB02/17/2026OBSERVED WORKERS STANDING ON THE LEADING EDGE OF EXTENSION EXTERIOR WORK APPROX. 8 FEET IN DEPTH, AREA WITH SNOW & ICE, BROKEN & MISSING GUARDRAILS, WORKERS W/OUT NO FALL PROTECTION, AND MULTIPLE DISLODGED CMU$5K due
ECB02/17/2026OBSERVED EXTENSION AT EXTERIOR WITH WORK BELOW GRADE WITH CMU WALLS NOT REFLECTED ON PLANS, BRACING FOR CONCRETE WALLS DEVIATING FROM APPROVED PLANS. CONTRARY TO BC 3301.6 NO PE ASSESSMENT REPORT NOR FILED PAA$5K due
ECB02/17/2026OBSERVED PARTIAL STRUCTURE REMOVED, NO LATERAL SUPPORT FOR WALLS, & INSTALL OF STRUCTURAL STEEL COLUMNS AT MULTIPLE LOCATIONS DEVIATING FROM APPROVED PLANS, AND NO PE ASSESSMENT REPORT. STOP ALL WORK ON THE ENT$5K due
ECB02/17/2026OBSERVED MAKE-SHIFT STRUCTURAL STEEL AND FIELD CONNECTIONS INSTALLED BC 2205.6.2; THE STRUCTURAL STEEL CONSISTED OF TORCH CUTS, DRILLING, AND COPING FOR CONNECTING ELEMENTS. NO PE DESIGN DRAWINGS FOR FIELD FABR$5K due
DOB06/18/2025EMERGNCY WRK-HAZARDUS CONDITN CREATD 2 BLDG DURNG HORIZONTAL EXTENSION WRK. LACK OF SHORING BRACE @ CORNR OF EXP#1&2 HAS.COMPROMSED EXISTING STRUCTURE. CAUSING SURCHARGES TO NEW PIN ON EXISTING BUILDING. REMEDY: BACKFILL THE CORNER OF EXP#1&2 WHERE THE LAGGING IS UNBRACED & WEDGED BEHIND NEW PINS.RESPND TO AUDIT REQUESTS BY 06/18/25
DOB06/18/2025MONITORNG-POTENTAL HAZARDOUS CONDITON CREATD2BLDG DURNG HOROZONTAL EXT ENSION WRK.THE LACK OF SHORING BRACE @ CORNER OF EXP#1&2 HAS.COMPROMSD EXISTNG STRUCTURE.CAUSING SURCHARGES 2 NEW PIN ON EXST BLDG. REMEDY: RETAIN NYS RDP 2DEVELOP MONITORNG PLANS W REPORTNG CRITERIA ASSESSMENT OF MONITORNG DATA WEEKLY & RESPND2AUDIT REQUSTS BY 6/18/25