← Back
BuildNYC
Co-op within a condominium
Anita Terrace Condominium
99-40 63RD ROAD · Forest Hills · BIN 4432011
💬 Discuss this project
1952Year Built
15Stories
R9Building Class
R7-1Zoning
577,426 sfGross Floor Area
537Units
LL97 CoveredRent Stabilized36 Active Violations ▸FDNY Report ↗
Co-op within a condominium · Owner of record: Anita Terrace Owner · 136,433 sf lot · 4.23 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projects'fc Foley Square Assoc. LLC'1 filing
Site & exterior'fc Foley Square Assoc. LLC'1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Anita Terrace Owners1003/21/2026
Comprehensive Designs403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL Engineering301/29/2024
Construction Management & Safety Con205/06/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Metro Design603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMS ContractorScaffold303/21/2026
Maxwell Plumbing MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL Engineering6781201/29/2024
Building Lifecycle
All (78)Filed (5)Permit Issued (2)Signed Off (1)Violation (60)Inspection (5)Objection (2)Special Inspection (3)
06/13/2025
Violation issued (HPD, closed)
A
06/04/2025
Violation issued (HPD, open)
A
06/04/2025
Violation issued (HPD, open)
A
06/04/2025
Violation issued (HPD, open)
B
06/04/2025
Violation issued (HPD, open)
B
06/04/2025
Violation issued (HPD, closed)
A
06/04/2025
Violation issued (HPD, open)
B
06/04/2025
Violation issued (HPD, closed)
C
05/14/2025
Violation issued (HPD, open)
B
05/14/2025
Violation issued (HPD, open)
B
05/14/2025
Violation issued (HPD, open)
B
05/14/2025
Violation issued (HPD, open)
B
05/14/2025
Violation issued (HPD, open)
B
05/13/2025
Violation issued (HPD, closed)
A
05/13/2025
Violation issued (HPD, closed)
A
04/08/2025
Violation issued (ECB, closed)
Local Law
08/29/2024
Violation issued (HPD, closed)
B
08/29/2024
Violation issued (HPD, closed)
B
08/29/2024
Violation issued (HPD, closed)
A
06/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2024
Violation issued (HPD, open)
B
04/25/2024
Violation issued (HPD, open)
B
04/25/2024
Violation issued (HPD, open)
B
04/25/2024
Violation issued (HPD, open)
B
04/25/2024
Violation issued (HPD, open)
B
04/25/2024
Violation issued (HPD, open)
B
04/25/2024
Violation issued (HPD, open)
B
04/23/2024
Violation issued (HPD, closed)
C
04/16/2024
Violation issued (HPD, closed)
A
02/02/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/29/2024
Filed — Alteration
RELOC./REPL. EXIST.1-GAS MASTER METER@CEL.W/1 GAS MASTER METER(TWIN SET), USED FOR185-RES.COOK CEL-014FL.,9-DRYER&3-BOIL PILOTS. REPL. 1 EXIST. GAS METER USED FOR 3-BOILERS. REPL. RELATED PIPING, NEW APPLI. VALVES&FLEX THROUOGHOUT. SPERSD Q00928337-I1-LA
Q00963528-P1
01/11/2024
Special inspection requirement — Tenant Protection Plan Compliance
01/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
01/11/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
01/09/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/03/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/22/2023
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
12/06/2023
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
11/30/2023
Permit issued — Plumbing
Q00963528-I1-PL
11/21/2023
Filed — Alteration
RELOC./REPL. EXIST.1-GAS MASTER METER@CEL.W/1 GAS MASTER METER(TWIN SET), USED FOR185-RES.COOK CEL-014FL.,9-DRYER&3-BOIL PILOTS. REPL. 1 EXIST. GAS METER USED FOR 3-BOILERS. REPL. RELATED PIPING, NEW APPLI. VALVES&FLEX THROUOGHOUT. SPERSD Q00928337-I1-LA
Q00963528-I1
10/27/2023
Filed — Alteration
Q00954219-I1
09/18/2023
Violation issued (HPD, closed)
B
09/18/2023
Violation issued (HPD, closed)
C
08/21/2023
Violation issued (HPD, closed)
B
08/13/2023
Violation issued (HPD, closed)
C
08/13/2023
Violation issued (HPD, closed)
A
08/13/2023
Violation issued (HPD, closed)
A
08/13/2023
Violation issued (HPD, closed)
C
08/13/2023
Violation issued (HPD, closed)
C
07/26/2023
Violation issued (HPD, closed)
B
07/26/2023
Violation issued (HPD, closed)
C
07/26/2023
Violation issued (HPD, closed)
B
07/26/2023
Violation issued (HPD, open)
B
07/11/2023
Violation issued (HPD, closed)
C
06/29/2023
Violation issued (ECB, closed)
Unknown
06/14/2023
Violation issued (HPD, closed)
B
03/08/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Q00386794-I1
10/06/2022
Violation issued (HPD, closed)
B
06/16/2022
Violation issued (HPD, open)
B
07/12/2021
Violation issued (HPD, closed)
A
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMaxwell Plumbing Mechanical11/30/2023
DOB NOWSidewalk ShedSigned-offAMS Contractor04/15/2021
BISOTISSUEDMohammed Halim07/06/2022
BISOTISSUEDMohammed Halim10/08/2021
BISOTISSUEDMohammed Halim09/07/2021
BISOTISSUEDMohammed Halim06/30/2021
BISEQISSUEDMohammed Halim04/22/2021
BISOTISSUEDMohammed Halim04/22/2021
1 project · most recent 01/29/2024
Gas
FiledStatusContractorScope
01/29/2024Signed-offMaxwell Plumbing MechanicalGas
1 project · most recent 10/22/2020
FiledStatusContractorScope
10/22/2020CompleteIlluminous Electric—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/02/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/03/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/22/2023Pass-Final PL - More than 10 Requested FloorsPassView ↗
12/06/2023Pass-Final PL - More than 10 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
01/11/2024Tenant Protection Plan Compliance—special
01/11/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
01/11/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
▾Documents — 61 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch3
08/23/2026Q00954219-I1Request digital key ↗
08/23/2026Q00963528-P1Request digital key ↗
08/23/2026Q00963528-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/28/2026Q00386794-I1Request digital key ↗
08/14/2026Q00386794-P1Request digital key ↗
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION9
12/17/2021440690236Open ↗
11/24/2021440690236Open ↗
09/28/2021440690236Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION4
10/20/2021440619831Open ↗
10/07/2021440619831Open ↗
04/22/2021440619831Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/28/2026Q00386794-P1Open ↗
08/28/2026Q00386794-I1Open ↗
08/23/2026Q00954219-I1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
09/04/2020440619831Open ↗
08/25/2020440619868Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/28/2021440690236Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/28/2021440690236Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/28/2021440690236Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026Q00963528-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026Q00963528-P1Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes2
08/25/2020440619868Open ↗
08/21/2020440619831Open ↗
▸DOB NOWTenant Protection Plan2
08/13/2026Q00386794-P1Open ↗
08/13/2026Q00386794-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/23/2026Q00954219-I1Open ↗
08/13/2026Q00963528-I1Open ↗
08/13/2026Q00963528-P1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/21/2020440619831Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
03/14/2023440619831Open ↗
09/28/2021440690236Open ↗
09/01/2020440619831Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/28/2021440690236Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/14/2023440619831Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
03/14/2023440619831Open ↗
09/28/2021440690236Open ↗
09/01/2020440619831Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
03/17/2023440619868Open ↗
03/16/2023440619831Open ↗
▸BISFINAL1
03/13/2023440619868Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
09/28/2021440690236Open ↗
08/25/2020440619868Open ↗
08/21/2020440619831Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/14/2023440619831Open ↗
▸Filing & Intake Forms7
▸BISEFILING JOB APPLICATION COVER SHEET3
09/28/2021440690236Open ↗
09/04/2020440619831Open ↗
08/25/2020440619868Open ↗
▸BISADDITIONAL INFORMATION3
12/17/2021440690236Open ↗
01/26/2021440619831Open ↗
01/25/2021440619831Open ↗
▸BISBOROUGH INTAKE FORM1
10/20/2021440619831Open ↗