← Back
QUEENS
99-73 165 AVENUE
QUEENS · BIN 4626086
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
Architecture
Roof2p · 1 filing · 5 docs
Cellar1p · 1 filing · 5 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BANJI AWOSIKA ARCHITECT P.C.108/04/2026
Building Lifecycle
All (31)Filed (1)Special Inspection (30)
08/04/2026
Filed — New Building
NEW 2-STORY 1-FAMILY HOUSE
Q01416210-I1
06/22/2026
Special inspection requirement — Air barrier - visual inspection
06/22/2026
Special inspection requirement — Fenestration air leakage
06/12/2026
Special inspection requirement — Mechanical Systems
06/12/2026
Special inspection requirement — Structural Cold-Formed Steel
06/12/2026
Special inspection requirement — Structural Steel - Details
06/12/2026
Special inspection requirement — Masonry
06/12/2026
Special inspection requirement — Concrete - Cast-In-Place
06/12/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
06/12/2026
Special inspection requirement — Heating Systems
06/12/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
06/12/2026
Special inspection requirement — Subgrade Inspections
06/12/2026
Special inspection requirement — Final
06/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/12/2026
Special inspection requirement — Structural Wood Frame
06/12/2026
Special inspection requirement — Air barrier — testing
06/12/2026
Special inspection requirement — Metering
06/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/12/2026
Special inspection requirement — Electric vehicle service equipment requirements
06/12/2026
Special inspection requirement — Fenestration areas
06/12/2026
Special inspection requirement — Insulation placement and R values
06/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/12/2026
Special inspection requirement — Lighting in dwelling units
06/12/2026
Special inspection requirement — Permanent certificate
06/12/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
06/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/12/2026
Special inspection requirement — Protection of exposed foundation insulation
06/12/2026
Special inspection requirement — Maintenance information
06/12/2026
Special inspection requirement — Lowest Floor Elevation
06/12/2026
Special inspection requirement — Ventilation and air distribution system
06/12/2026
Special inspection requirement — Energy Code Compliance Inspections
Nothing on file for this building.
1 project · most recent 08/04/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/04/2026——Heating and Air Conditioning Systems
Heat / Cool
1 project · most recent 08/04/2026
Steel Concrete Masonry Wood
FiledStatusContractorScope
08/04/2026——Steel, Concrete, Masonry, Wood
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
06/22/2026Air barrier - visual inspection—energy_progress
06/22/2026Fenestration air leakage—energy_progress
06/12/2026Mechanical Systems—special
06/12/2026Structural Cold-Formed Steel—special
06/12/2026Structural Steel - Details—special
06/12/2026Masonry—special
06/12/2026Concrete - Cast-In-Place—special
06/12/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
06/12/2026Heating Systems—special
06/12/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
06/12/2026Subgrade Inspections—special
06/12/2026Final—progress
06/12/2026Fire-Resistance Rated Construction—progress
06/12/2026Structural Wood Frame—progress
06/12/2026Air barrier — testing —energy_progress
06/12/2026Metering—energy_progress
06/12/2026HVAC-R and service water piping design and insulation—energy_progress
06/12/2026Electric vehicle service equipment requirements—energy_progress
06/12/2026Fenestration areas—energy_progress
06/12/2026Insulation placement and R values—energy_progress
06/12/2026HVAC-R and service water heating equipment—energy_progress
06/12/2026Lighting in dwelling units—energy_progress
06/12/2026Permanent certificate—energy_progress
06/12/2026Fenestration and door U-factor and product ratings—energy_progress
06/12/2026HVAC-R and service water heating system controls—energy_progress
Latest 25 of 30.
▾Documents — 5 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026Q01416210-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026Q01416210-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026Q01416210-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026Q01416210-I1Open ↗
▸Other Documents1
▸DOB NOWSite Survey: Initial1
08/16/2026Q01416210-I1Open ↗