← Back
Two family brick
99 BAINBRIDGE STREET
BROOKLYN · BIN 3047462
💬 Discuss this project
1892Year Built
3Stories
B1Building Class
R6BZoning
4,296 sfGross Floor Area
2Units
Two family brick · Owner of record: 99 BAINBRIDGE LLC · 2,000 sf lot · 2.15 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction25p · 1 filing · 20 docs
Floor 3Under Construction24p · 1 filing · 20 docs
Floor 2Under Construction24p · 1 filing · 20 docs
Floor 1Under Construction23p · 1 filing · 20 docs
CellarUnder Construction25p · 1 filing · 20 docs
Sub-BasementUnder Construction22p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/17/2021$2.5M—Private party → Private party$594/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOCOTEC, INC.202/06/2026
DAVID KEANE P.E., P.C.110/23/2025
ABS ENGINEERING, PLLC210/09/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BOUTIQKEY1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GRANT DAVIS THOMPSON INCGeneral Contractor304/09/2026
ASPECT PLBNG&HTNG CO LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ABS ENGINEERING, PLLC4835210/09/2025
ALAN MARGOLIN & ASSOC423110/08/2025
Building Lifecycle
All (36)Filed (5)Permit Issued (4)Inspection (2)Objection (10)Special Inspection (15)
03/20/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/27/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/06/2026
Filed — Alteration
B01349698-I1
02/06/2026
Permit issued — Construction Fence
B01349698-I1-FN
01/27/2026
Permit issued — Plumbing
B00915496-S3-PL
01/20/2026
Permit issued — General Construction
B00915496-I1-GC
01/20/2026
Permit issued — Mechanical Systems
B00915496-S2-MS
11/04/2025
Objection resolved — Addressed
11/04/2025
Objection resolved — Addressed
10/30/2025
Objection raised — Admin
10/30/2025
Objection raised — Scope
10/28/2025
Objection resolved — Addressed
10/23/2025
Filed — Alteration
MECHANICAL WORK IN CONJUNCTION WITH THE RENOVATION OF THE EXISTING TWO FAMILY RESIDENCE ON CEL, BAS, 001 - 003 & ROOF. NEW GAS FURNACE, AIR CONDITIONING SYSTEM, AND KITCHEN, TOILET & LAUNDRY EXHAUST SYSTEMS. NO CHANGES TO ZONING USE, EGRESS OR OCCUPANCY.
B00915496-S1
10/22/2025
Objection resolved — Addressed
10/22/2025
Objection resolved — Addressed
10/20/2025
Objection raised — Mechanical
10/20/2025
Objection raised — Fire_Protection
10/20/2025
Objection raised — Cost
10/09/2025
Filed — Alteration
MECHANICAL WORK IN CONJUNCTION WITH THE RENOVATION OF THE EXISTING TWO FAMILY RESIDENCE ON CEL, BAS, 001 - 003 & ROOF. NEW GAS FURNACE, AIR CONDITIONING SYSTEM, AND KITCHEN, TOILET & LAUNDRY EXHAUST SYSTEMS. NO CHANGES TO ZONING USE, EGRESS OR OCCUPANCY.
B00915496-S2
10/09/2025
Filed — Alteration
MECHANICAL WORK IN CONJUNCTION WITH THE RENOVATION OF THE EXISTING TWO FAMILY RESIDENCE ON CEL, BAS, 001 - 003 & ROOF. NEW GAS FURNACE, AIR CONDITIONING SYSTEM, AND KITCHEN, TOILET & LAUNDRY EXHAUST SYSTEMS. NO CHANGES TO ZONING USE, EGRESS OR OCCUPANCY.
B00915496-S3
10/08/2025
Filed — Alteration
MECHANICAL WORK IN CONJUNCTION WITH THE RENOVATION OF THE EXISTING TWO FAMILY RESIDENCE ON CEL, BAS, 001 - 003 & ROOF. NEW GAS FURNACE, AIR CONDITIONING SYSTEM, AND KITCHEN, TOILET & LAUNDRY EXHAUST SYSTEMS. NO CHANGES TO ZONING USE, EGRESS OR OCCUPANCY.
B00915496-I1
09/04/2024
Special inspection requirement — Heating Systems
Alex Schwartz
09/04/2024
Special inspection requirement — Chimneys and vents
Alex Schwartz
01/29/2024
Special inspection requirement — Structural Wood Frame
08/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alex Schwartz
08/22/2023
Special inspection requirement — Structural Steel - Welding
08/22/2023
Special inspection requirement — Mechanical Systems
Alex Schwartz
08/22/2023
Special inspection requirement — Post-installed Anchors
08/22/2023
Special inspection requirement — Masonry
08/22/2023
Special inspection requirement — Structural Steel - Details
08/22/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/22/2023
Special inspection requirement — Final
08/22/2023
Special inspection requirement — Concrete - Cast-In-Place
08/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alex Schwartz
08/22/2023
Special inspection requirement — Final
Alex Schwartz
08/22/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedGRANT DAVIS THOMPSON INC02/06/2026
DOB NOWPlumbingPermit IssuedASPECT PLBNG&HTNG CO LLC01/27/2026
DOB NOWGeneral ConstructionPermit IssuedGRANT DAVIS THOMPSON INC01/20/2026
DOB NOWMechanical SystemsPermit IssuedGRANT DAVIS THOMPSON INC01/20/2026
1 project · most recent 10/23/2025
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
10/23/2025Permit IssuedGRANT DAVIS THOMPSON INCAir Conditioning Systems, Heating Systems
Cooling
Daikin DX6VSS6010 53,000 BTU · Condensing Unit ×1
Heating
Daikin DM96VC0804CNA 80,000 BTU · Furnace ×1
1 project · most recent 10/23/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/23/2025Permit IssuedASPECT PLBNG&HTNG CO LLCGas, Storm, Water/Sanitary
1 project · most recent 05/21/2026
General Wiring
FiledStatusContractorScope
05/21/2026Permit IssuedSTABILITY ELEC ENTERP INCGeneral Wiring
1 project · most recent 10/23/2025
Steel Concrete Masonry Wood
FiledStatusContractorScope
10/23/2025Permit IssuedASPECT PLBNG&HTNG CO LLCSteel, Concrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/20/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/27/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
09/04/2024Heating SystemsAlex Schwartzspecial
09/04/2024Chimneys and ventsAlex Schwartzspecial
01/29/2024Structural Wood Frame—progress
08/23/2023Fire-Resistant Penetrations and JointsAlex Schwartzspecial
08/22/2023Structural Steel - Welding—special
08/22/2023Mechanical SystemsAlex Schwartzspecial
08/22/2023Post-installed Anchors—special
08/22/2023Masonry—special
08/22/2023Structural Steel - Details—special
08/22/2023Structural Stability – Alterations of existing buildings—special
08/22/2023Final—progress
08/22/2023Concrete - Cast-In-Place—special
08/22/2023Fire-Resistant Penetrations and JointsAlex Schwartzspecial
08/22/2023FinalAlex Schwartzprogress
08/22/2023Structural Steel - High Strength Bolting—special
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/20/2026B00915496-P2Request digital key ↗
08/20/2026B00915496-P1Request digital key ↗
08/20/2026B00915496-S3Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits6
▸DOB NOWLPC Approval/Permit6
08/20/2026B00915496-P2Open ↗
08/20/2026B00915496-P1Open ↗
08/13/2026B00915496-S1Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/20/2026B00915496-P1Open ↗
08/20/2026B00915496-S3Open ↗
08/20/2026B00915496-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026B00915496-S2Open ↗
08/22/2026B00915496-S3Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/23/2026B00915496-S2Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/20/2026B00915496-P1Open ↗
08/20/2026B00915496-S3Open ↗
08/20/2026B00915496-S2Open ↗
Showing 3 of 6 on file for this type
▸Other Documents1
▸DOB NOWProof of Historic Building1
08/13/2026B00915496-I1Open ↗