← Back
BuildNYC
Single or multiple dwelling with stores or offices
99 CHURCH AVENUE
BROOKLYN · Kensington · BIN 3124483
💬 Discuss this project
1930Year Built
4Stories
S9Building Class
R5Zoning
8,000 sfGross Floor Area
10Units
Rent Stabilized9 Active Violations ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: 97-99 Church Avenue Realty · 2,200 sf lot · 3.64 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing
Floor 11 filing
Site & exterior7 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
97-99 Church Avenue Realty103/22/2026
Resident103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ikra Consulting105/06/2025
Alpha Home Design406/10/2021
Green Design211/16/2018
Lighthouse111/16/2018
Ashraf111/05/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Indesign Studio803/21/2026
Atlantic Building Supply403/21/2026
Expediting203/21/2026
An Tong Fan203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Construction Services Con NYScaffold603/21/2026
Sign Master USAspecialty_contractor303/21/2026
JascoScaffold207/08/2026
Neptune Signs & AwningsSign hanger207/08/2026
HPC Wireless ServicesGeneral Contractor103/21/2026
All About P & H of NYPlumbing204/30/2009
Taj Mahal ContractingGeneral Contractor111/16/2018
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ikra Consulting7032105/06/2025
Building Lifecycle
08/05/2026
Boiler inspection report filed
Initial · no defects · Accepted
07/14/2026
Failure to provide unobstructed exit passageway. At time of inspection, observed at exposure #1, second to fourth floors, 5 window air conditioning…
ECB violation · closed
06/29/2026
Electrical work without permit. At a 4-story mixed use building observed installation of electrical wiring for 3 split system air conditioning…
ECB violation · open
05/05/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER AT SOUTH WALL AT PUBLIC HALL STAIRS, 1st STORY
HPD violation · open
05/05/2026
§ 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICAL WIRE AT SOUTH WALL AT PUBLIC…
HPD violation · open
76 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Neptune Signs & Awnings—
DOB NOW—Sign Master USA—
DOB NOW—Neptune Signs & Awnings—
DOB NOW—Construction Services Con NY—
DOB NOW—Jasco—
DOB NOW—Jasco—
DOB NOW—Construction Services Con NY—
BIS—Taj Mahal Contracting—
BIS—HPC Wireless Services—
BIS—Philco Plumbing—
BIS—Philco Plumbing—
BIS—Bayside Fuel Oil—
Nothing on file for this building.
Nothing on file for this building.
67 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account