99 EMPIRE BOULEVARD
BROOKLYN · BIN 3034456
💬 Discuss this project
0Year Built
—Stories
V1Building Class
C4-4DZoning
0 sfGross Floor Area
0Units
4 Active Violations 0 unresolved · 4 paperwork only ▸FDNY Report ↗
Zoned commercial or Manhattan residential · Owner of record: Empire McKeever Heights · 38,118 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsThe Rabsky GroupUnder Construction1 filing
RoofEmpire Blvd Holdings, LLC2p · 1 filing
Floor 1Empire Blvd Holdings, LLC1p · 1 filing
Site & exteriorEmpire Blvd Holdings, LLCUnder Construction4 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Ptma 5200 Kings Highway1809/12/2026
MD Equipment803/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/18/2025$42.5M—EMPIRE BOULEVARD HOLDINGS LLC → EMPIRE MCKEEVER HEIGHTS LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Geiger E A Group403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Galaxy DevelopersGeneral Contractor410/03/2026
Urban Industrial GroupScaffold407/08/2026
Galaxy DevelopersScaffold309/12/2026
Urban Industrial GroupGeneral Contractor107/08/2026
MC SuperstructureScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
20/20 Inspections1471307/20/2026
H & O Engineering5595103/20/2025
Building Lifecycle
All (99)Filed (13)Permit Issued (11)Signed Off (3)Violation (22)Objection (20)Special Inspection (30)
10/02/2026
Permit issued — Support of Excavation
B01339675-S3-SE
09/10/2026
Signed off — Alteration
8' PLYWOOD CONSTRUCTION FENCE IN CONJUNCTION WITH DEMOLITION APPLICATION B00880202-I1
B01202460-I1
09/10/2026
Permit issued — Construction Fence
B01202460-I1-FN
08/05/2026
Permit issued — Foundation
B01339675-S2-FO-EA
08/05/2026
Objection resolved — Resolved
08/03/2026
Objection raised — Other
07/29/2026
Permit issued — Support of Excavation
B01339675-S3-SE
07/20/2026
Filed — New Building
Structure for new 14 story mix use building
B01339675-P1
07/16/2026
Special inspection requirement — Subgrade Inspections
JACOB HAAS
07/16/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
JACOB HAAS
07/16/2026
Special inspection requirement — Concrete - Cast-In-Place
JACOB HAAS
07/16/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
JACOB HAAS
07/16/2026
Special inspection requirement — Structural Steel - Welding
JACOB HAAS
07/15/2026
Permit issued — Construction Fence
B01426615-I1-FN
07/14/2026
Filed — Alteration
PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B01426615-I1
07/02/2026
Permit issued — Support of Excavation
B01339675-S3-SE
05/28/2026
Objection resolved — Addressed
03/30/2026
Objection resolved — Addressed
03/23/2026
Objection raised — Other
03/11/2026
Filed — New Building
Structure for new 14 story mix use building
B01339675-S6
03/03/2026
Objection raised — Other
02/21/2026
Objection raised — Other
02/17/2026
Objection resolved — Addressed
02/11/2026
Filed — New Building
Structure for new 14 story mix use building
B01339675-S3
02/11/2026
Special inspection requirement — Concrete - Cast-In-Place
JACOB HAAS
02/11/2026
Special inspection requirement — Subgrade Inspections
JACOB HAAS
02/11/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
JACOB HAAS
02/11/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
JACOB HAAS
02/11/2026
Special inspection requirement — Structural Steel - Welding
JACOB HAAS
02/09/2026
Objection resolved — Addressed
02/09/2026
Special inspection requirement — Metering
02/09/2026
Special inspection requirement — Lighting in dwelling units
02/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
02/09/2026
Special inspection requirement — Exterior lighting power
02/09/2026
Special inspection requirement — Duct leakage testing, insulation and design
02/09/2026
Special inspection requirement — Maintenance information
02/09/2026
Special inspection requirement — Final
02/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/09/2026
Special inspection requirement — Emergency and Standby Power Systems (Generator)
02/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
02/09/2026
Special inspection requirement — Mechanical Systems
02/09/2026
Special inspection requirement — Lighting controls
02/09/2026
Special inspection requirement — Electrical motors and elevators
02/09/2026
Special inspection requirement — Shutoff dampers
02/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
02/09/2026
Special inspection requirement — Interior lighting power
02/06/2026
Special inspection requirement — Metering
02/06/2026
Special inspection requirement — Interior lighting power
02/06/2026
Special inspection requirement — Air barrier — testing
02/06/2026
Special inspection requirement — Air barrier continuity plan testing
02/05/2026
Objection raised — Other
02/05/2026
Objection raised — Other
02/05/2026
Objection raised — Other
02/03/2026
Objection raised — Other
02/03/2026
Objection raised — Other
02/03/2026
Objection resolved — Addressed
01/29/2026
Objection raised — Other
01/28/2026
Filed — New Building
Structure for new 14 story mix use building
B01339675-S5
01/23/2026
Filed — New Building
Structure for new 14 story mix use building
B01339675-S2
01/20/2026
Filed — New Building
Structure for new 14 story mix use building
B01339675-S4
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupport of ExcavationPermit IssuedGalaxy Developers10/02/2026
DOB NOWConstruction FenceSigned-offGalaxy Developers09/10/2026
DOB NOWFoundationPermit IssuedGalaxy Developers08/05/2026
DOB NOWSupport of ExcavationPermit IssuedGalaxy Developers07/29/2026
DOB NOWConstruction FencePermit IssuedGalaxy Developers07/15/2026
DOB NOWSupport of ExcavationPermit IssuedGalaxy Developers07/02/2026
DOB NOWConstruction FenceSigned-offGalaxy Developers09/08/2025
DOB NOWProtection and Mechanical MethodsSigned-offUrban Industrial Group06/20/2025
DOB NOWFull DemolitionSigned-offUrban Industrial Group06/18/2025
DOB NOWSidewalk ShedSigned-offMC Superstructure05/29/2025
DOB NOWConstruction FenceSigned-offUrban Industrial Group04/08/2025
BISPLISSUEDLloyd G Drummond Plumbing & Gen10/03/2014
BISOTISSUEDPro Aire Design Consulting06/03/2014
BISEQISSUEDSasco Construction Enterprises04/16/2014
BIS—ISSUEDSasco Construction Enterprises04/16/2014
BISPLISSUEDCitywide Plumbing NYC04/04/2014
BIS—ISSUEDSasco Construction Enterprises03/03/2014
BISEQISSUEDSasco Construction Enterprises03/03/2014
BISEQISSUEDSpring Scaffolding12/26/2013
BISEQISSUEDSpring Scaffolding11/22/2013
BISEQISSUEDDow Construction and Desi06/18/2013
BIS—ISSUEDDow Construction and Desi06/18/2013
BISPLISSUEDPlumbing & Heating Doctor05/23/2013
BIS—ISSUEDDow Construction and Desi05/15/2013
BISEQISSUEDMaru Construction04/02/2013
1 project · most recent 07/20/2026
Air Conditioning Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/20/2026Permit IssuedGalaxy DevelopersAir Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems
Cooling
Daikin REYA120AATJA 120,000 BTU · Vrf Outdoor ×20
REYA72AATJA 72,000 BTU · Vrf Outdoor ×4
REYA96AAATJA 96,000 BTU · Vrf Outdoor ×4
Heat / Cool
Daikin FXSA36AAVJU 48,000 BTU · Vrf Indoor ×240
RXTA24AAVJU 25,000 BTU · Vrf Outdoor ×160
FXSA24AAVJU 24,000 BTU · Vrf Indoor ×120
FXSA30AAVJU 30,000 BTU · Vrf Indoor ×120
FXSA54AAVJU 54,000 BTU · Vrf Indoor ×120
FXSA15AAVJU 15,000 BTU · Vrf Indoor ×104
FSXA18AAVJU 18,000 BTU · Vrf Indoor ×52
FXSA12AAVJU 12,000 BTU · Vrf Indoor ×48
RRXTA36AAVJU 37,000 BTU · Vrf Outdoor ×4
Ventilation
Greenheck AX-63-160-0635-A50 5,000 CFM · Exhaust Fan ×4
AX-72-190 12,000 CFM · Exhaust Fan ×4
USF-12 850 CFM · Exhaust Fan ×4
USF-15-B7 950 CFM · Exhaust Fan ×4
Lf Systems DEF050 5,400 CFM · Exhaust Fan ×8
Aaon RNA-031 4,645 CFM · Doas ×4
1 project · most recent 07/20/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/20/2026——Gas, Storm, Water/Sanitary
2 projects · most recent 11/24/2025
General Wiring
FiledStatusContractorScope
11/24/2025Permit IssuedM.R. Electrical ServiceGeneral Wiring
06/04/2025CompleteNash Electric Services—
1 project · most recent 07/20/2026
FiledStatusContractorScope
07/20/2026Permit IssuedGalaxy Developers4 scope_items
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
07/16/2026Subgrade InspectionsJACOB HAASspecial
07/16/2026Subsurface Conditions – Fill Placement & In-Place DensityJACOB HAASspecial
07/16/2026Concrete - Cast-In-PlaceJACOB HAASspecial
07/16/2026Excavations - Sheeting, Shoring, and BracingJACOB HAASspecial
07/16/2026Structural Steel - WeldingJACOB HAASspecial
02/11/2026Concrete - Cast-In-PlaceJACOB HAASspecial
02/11/2026Subgrade InspectionsJACOB HAASspecial
02/11/2026Subsurface Conditions – Fill Placement & In-Place DensityJACOB HAASspecial
02/11/2026Excavations - Sheeting, Shoring, and BracingJACOB HAASspecial
02/11/2026Structural Steel - WeldingJACOB HAASspecial
02/09/2026Metering—energy_progress
02/09/2026Lighting in dwelling units—energy_progress
02/09/2026HVAC-R and service water piping design and insulation—energy_progress
02/09/2026Exterior lighting power—energy_progress
02/09/2026Duct leakage testing, insulation and design—energy_progress
02/09/2026Maintenance information—energy_progress
02/09/2026Final—progress
02/09/2026Fire-Resistant Penetrations and Joints—special
02/09/2026Emergency and Standby Power Systems (Generator)—special
02/09/2026HVAC-R and service water heating system controls—energy_progress
02/09/2026Mechanical Systems—special
02/09/2026Lighting controls—energy_progress
02/09/2026Electrical motors and elevators—energy_progress
02/09/2026Shutoff dampers—energy_progress
02/09/2026HVAC-R and service water heating equipment—energy_progress
Latest 25 of 52.
▾Documents — 203 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/22/2026B00880202-I1Request digital key ↗
08/22/2026B00880202-S1Request digital key ↗
08/22/2026B01202460-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits33
▸BISPLAN / WORK APPROVAL APPLICATION17
10/10/2014320523019Open ↗
10/09/2014320523019Open ↗
10/09/2014320523019Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION16
10/03/2014320523019Open ↗
09/29/2014320523019Open ↗
07/18/2014320855446Open ↗
Showing 3 of 16 on file for this type
▸Zoning, Tax Lot & Property Records11
▸DOB NOWRestrictive Declaration/Easement 18
08/15/2026B01339675-P1Open ↗
08/15/2026B01339675-S6Open ↗
08/14/2026B01339675-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram1
08/14/2026B01339675-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026B01339675-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/14/2026B01339675-I1Open ↗
▸Seals & Professional Certifications41
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/22/2026B00880202-S1Open ↗
08/22/2026B00880202-I1Open ↗
08/21/2026B01218594-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
08/31/2026B01339675-S3Open ↗
08/31/2026B01339675-S3Open ↗
08/31/2026B01339675-S3Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
04/06/2016320855446Open ↗
01/23/2015320523019Open ↗
01/23/2015320523019Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
07/16/2014320855446Open ↗
11/20/2012320523019Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
07/16/2014320855446Open ↗
11/20/2012320523019Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/22/2013340101446Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/22/2013340101446Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/22/2013340101446Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026B01339675-S2Open ↗
▸Trade Schedules & Equipment37
▸BISSCHEDULE B - PLUMBING7
10/10/2014320523019Open ↗
10/09/2014320523019Open ↗
06/18/2014320523019Open ↗
Showing 3 of 7 on file for this type
▸BISSELF-CERT PLUMBING NOTICE7
05/22/2015320523019Open ↗
10/22/2014320523019Open ↗
10/15/2014320523019Open ↗
Showing 3 of 7 on file for this type
▸BISWATER METER PERMIT : DEP-METER5
11/28/2014320523019Open ↗
11/28/2014320523019Open ↗
11/28/2014320523019Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT5
07/16/2014320855446Open ↗
07/16/2014320855446Open ↗
07/16/2014320855446Open ↗
Showing 3 of 5 on file for this type
▸BISRPZ/DDCV TEST REPORT : GEN215B3
11/28/2014320523019Open ↗
11/28/2014320523019Open ↗
11/28/2014320523019Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
07/24/2014320523019Open ↗
01/04/2014320523019Open ↗
▸BISEQUIPMENT USE PERMITS1
04/11/2016320523019Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/20/2012320523019Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
10/15/2014320523019Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026B00880202-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B00880202-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B00880202-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026B00880202-I1Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/14/2026B01339675-I1Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST1
02/26/2016320523019Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/14/2026B01339675-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/14/2026B01339675-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWOER: Notice to Proceed5
08/18/2026B01339675-S1Open ↗
08/15/2026B01339675-S3Open ↗
08/15/2026B01339675-S6Open ↗
Showing 3 of 5 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
07/16/2014320855446Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/20/2012320523019Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/22/2026B00880202-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026B00880202-I1Open ↗
▸DOB NOWOER: Notice of Satisfaction1
08/15/2026B01339675-S3Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
04/11/2016320523019Open ↗
04/11/2016320523019Open ↗
01/21/2016320523019Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
04/06/2016320855446Open ↗
01/19/2016320523019Open ↗
▸BISTR8: Energy Code Progress Inspections1
07/16/2014320855446Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
11/22/2013340101446Open ↗
▸Inspections & Test Reports1
▸BISHYDRO FLOW TEST LETTER1
03/07/2014320523019Open ↗
▸Approvals, Objections & Sign-offs20
▸BISLETTERS - SUPPORTING DOCUMENTATION8
01/23/2015320523019Open ↗
01/23/2015320523019Open ↗
12/11/2014320523019Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
04/11/2016320523019Open ↗
04/06/2016320855446Open ↗
09/29/2015320523019Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE4
06/12/2014320523019Open ↗
03/07/2014320523019Open ↗
01/04/2014320523019Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
07/16/2014320855446Open ↗
▸BISSUPERSEDING LETTER1
06/27/2013320523019Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
04/06/2016320855446Open ↗
01/23/2015320523019Open ↗
07/16/2014320855446Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION5
02/26/2016320523019Open ↗
10/09/2014320523019Open ↗
06/10/2014320523019Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET2
07/16/2014320855446Open ↗
11/09/2012320523019Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/22/2013340101446Open ↗
▸Other Documents10
▸DOB NOWAdjoining Owners Notification2
08/15/2026B01339675-S3Open ↗
08/15/2026B01339675-S2Open ↗
▸DOB NOWProperty Ownership Certification2
08/22/2026B00880202-I1Open ↗
08/14/2026B01339675-I1Open ↗
▸BISPlot Diagram1
12/01/2012320523019Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B00880202-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026B00880202-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/14/2026B01339675-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/14/2026B01339675-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B00880202-I1Open ↗