| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/04/2026 | Permit Issued | QUALITY CONTROL MECH LLC | Heating and Air Conditioning Systems | Heat / Cool Mitsubishi Electric PEFY-L12NMAU-A 13,500 BTU · Vrf Indoor ×3 MXZ-SM36NL 36,000 BTU · Vrf Outdoor ×1 MXZ-SM48NL 48,000 BTU · Vrf Outdoor ×1 PEFY-L08NMAU-A 8,000 BTU · Vrf Indoor ×1 PEFY-L15NMAU-A 15,000 BTU · Vrf Indoor ×1 PEFY-L24NMAU-A 24,000 BTU · Vrf Indoor ×1 |
| 08/08/2022 | Signed-off | PAM AIR CONDITIONING INC | Air Conditioning Systems | |
| 08/02/2021 | Signed-off | STYLE RENOVATIONS AND DEC | Air Conditioning Systems | Cooling Mitsubishi Electric PUMY-HP48NKMU1 48,000 BTU · Vrf Outdoor ×3 |
| 12/26/2019 | Permit Issued | TWS CONTRACTING CORP | Air Conditioning Systems | Cooling Lg ARUB060GSS4 65,000 BTU · Vrf Outdoor ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/04/2026 | Permit Issued | NEW YORK PARK PLBG&HTG CO | Gas, Water/Sanitary |
| 05/21/2026 | Permit Issued | RITE PLUMBING & HEATING I | Gas, Water/Sanitary |
| 07/29/2025 | Signed-off | PETER MICELI PLUMBING | Water/Sanitary |
| 11/10/2021 | Permit Issued | P.S.I. MECHANICAL | Water/Sanitary |
| 10/14/2021 | Signed-off | M & M PIPING AND HEATING | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/06/2026 | Permit Issued | BOROWIDE ELECT'L CONTR'S | — |
| 07/22/2026 | Permit Issued | POWER FULL ELECTRIC, INC | General Wiring |
| 12/16/2025 | Permit Issued | TM SELECT ELECTRIC CORP | General Wiring |
| 09/02/2025 | Pending Payment | ELPO ELECTRICAL CONTG INC | General Wiring |
| 03/31/2025 | Complete | ELPO ELECTRICAL CONTG INC | General Wiring |
| 03/26/2025 | Complete | DENMAR ELECTRIC CORP | General Wiring |
| 02/13/2025 | Permit Issued | DEFALCO ASSOCIATES, LLC./ | General Wiring |
| 12/20/2024 | Complete | AV GROUP ELECTRICAL LLC | — |
| 09/09/2024 | Complete | CITY ELECTRIC LLC | General Wiring |
| 08/27/2024 | Complete | GMC ELECTRICAL INC | — |
| 03/13/2024 | Complete | R. DONOVAN & SON ELECTRIC | General Wiring |
| 10/02/2023 | Complete | PLAZA ELEC'L CONTR'S. INC | General Wiring |
| 07/24/2023 | Complete | ACCURATE ELEC'L CORP. | General Wiring |
| 06/06/2023 | Complete | PRO ELECTRIC CORP. | General Wiring |
| 06/02/2023 | Complete | PLAZA ELEC'L CONTR'S. INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/07/2026 | Permit Issued | ANDAMIO SCAFFOLDING LLC | Scaffold |
| 08/07/2026 | Permit Issued | ANDAMIO SCAFFOLDING LLC | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/04/2026 | Permit Issued | QUALITY CONTROL MECH LLC | Tenant Protection Plan 72 Hour |
| Owner | Filings | Most Recent |
|---|---|---|
| BEK 2011 | 10 | 07/08/2026 |
| FIRSTSERVICE RESIDENTIAL | 3 | 07/08/2026 |
| OWNER OF 99 JANE STREET | 1 | 03/22/2026 |
| 101 JANE ST COMPANY C/O R | 1 | 03/22/2026 |
| STRASBOURG REALTY CO | 1 | 03/22/2026 |
| TMO PARENT LLC | 1 | 03/22/2026 |
| BROSNA CONSTRUCTION | 3 | 03/22/2026 |
| 99 JANE STREET CONDOMINIUM | 31 | 03/21/2026 |
| MAXWELL-KATES | 20 | 03/21/2026 |
| 99 HESTIA | 4 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| ALWAYS FAST SERVICES CORP | 2 | 08/07/2026 |
| BENDIX ENGINEERING, P.C. | 4 | 06/04/2026 |
| HAWKINS ROMAN ARCHITECTS PLLC | 4 | 05/21/2026 |
| AJF ARCHITECTURE | 5 | 07/29/2025 |
| NDKAZALAS ARCHITECTURE P.C. | 1 | 12/18/2024 |
| CHARLES G. MICHEL ENGINEERING, PC. | 1 | 12/18/2024 |
| AMMOR ARCHITECTURE LLP | 1 | 08/07/2024 |
| NICHOLAS DERAMO ARCHITECT | 2 | 05/28/2024 |
| ROBERT GERMAIN JR. PE | 7 | 11/21/2023 |
| RICHARD H BALSER, P.E. | 1 | 07/21/2023 |
| SARAH GORDON DRAKE ARCHITECT, LLC | 2 | 04/04/2023 |
| COWLEY ENGINEERING, PC | 2 | 12/14/2022 |
| E4P CONSULTING ENGINEERING PLLC | 2 | 08/08/2022 |
| ENTHINK ENGINEERS LLC | 6 | 08/03/2022 |
| JAMES DIXON ARCHITECT PC | 2 | 02/23/2022 |
| PRAINITO ARCHITECT P.C. | 1 | 11/10/2021 |
| RAD DESIGN & ARCHITECTURE PLLC | 3 | 10/14/2021 |
| URBAN INTEGRATIONS | 1 | 11/03/2020 |
| CES ENGINEERING LLC | 1 | 09/09/2020 |
| JACK GREEN ASSOCIATES | 2 | 12/26/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| DOMANI CONSULTING | 7 | 03/21/2026 |
| JENNY FLORES EXPEDITING | 5 | 03/21/2026 |
| AGOUTI CONSTRUCTION CONSULTING | 2 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 1 | 03/21/2026 |
| UNITED SAFETY CONSULTANTS | 1 | 03/21/2026 |
| CODE | 4 | 03/21/2026 |
| NDKAZALAS ARCHITECTURE | 2 | 03/21/2026 |
| QUICK FILING OF NY INC | 3 | 03/21/2026 |
| THERESA VOLTAGGIO | 2 | 03/21/2026 |
| KNA CONSULTING | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| JRR CONTRACTING INC | General Contractor | 7 | 09/07/2026 |
| DADDO CONSTRUCTION LLC | General Contractor | 6 | 07/08/2026 |
| STYLE RENOVATIONS AND DEC | General Contractor | 6 | 03/21/2026 |
| EAST COAST MECHANICAL LLC | Plumbing | 4 | 07/08/2026 |
| COOLMORE CONSTRUCTION COR | General Contractor | 4 | 07/08/2026 |
| DENMAR ELECTRIC CORP | Electrical | 2 | 03/22/2026 |
| BROSNA CONSTRUCTION CORPO | General Contractor | 2 | 03/21/2026 |
| PHOENIX SUTTON STR INC | General Contractor | 2 | 07/08/2026 |
| PETER MICELI PLUMBING | Plumbing | 2 | 07/08/2026 |
| PREMIER FLOW PLBG AND HTG | Plumbing | 2 | 07/08/2026 |
| CONDUCTOR ELECL SVCS INC | Electrical | 2 | 03/22/2026 |
| TWS CONTRACTING CORP | General Contractor | 2 | 03/21/2026 |
| EAST COAST PETROLEUM INC | General Contractor | 2 | 03/21/2026 |
| EVEREST SCAFFOLDING INC | General Contractor | 2 | 03/21/2026 |
| ANDAMIO SCAFFOLDING LLC | General Contractor | 2 | 08/26/2026 |
| LRL CONSTRUCTION INC | General Contractor | 1 | 07/08/2026 |
| MARLEX MANAGEMENT INC | General Contractor | 1 | 07/08/2026 |
| PAM AIR CONDITIONING INC | General Contractor | 1 | 07/08/2026 |
| QUALITY CONTROL MECH LLC | General Contractor | 1 | 04/09/2026 |
| SALVATORE PALAZZOLO | General Contractor | 1 | 04/09/2026 |
| TATRAS CONSTRUCTION CORP | General Contractor | 1 | 07/19/2026 |
| Z S NY IMPROVEMENT CORP | General Contractor | 1 | 07/08/2026 |
| ARIANA CONTRACTING INC | Plumbing | 1 | 07/08/2026 |
| DELTA-SIGMA MECH CORP | Plumbing | 1 | 07/08/2026 |
| MARATHON MECHANICAL LLC | Plumbing | 1 | 07/17/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| BENDIX ENGINEERING, P.C. | 4293 | 4 | 06/04/2026 |
| HAWKINS ROMAN ARCHITECTS | 6863 | 3 | 05/21/2026 |
| MET INSPECTIONS LLC | 7385 | 3 | 07/29/2025 |
| CHARLES G MICHEL ENGINEER | 2871 | 1 | 12/18/2024 |
| AMMOR ARCHITECTURE LLP | 3054 | 1 | 08/07/2024 |
| WINTON GROUP ARCHITECTURE | 4343 | 1 | 05/28/2024 |
| ROBERT F. GERMAIN JR. PE | 5100 | 7 | 11/21/2023 |
| RICHARD H. BALSER ENGINEE | 3028 | 1 | 07/21/2023 |
| SARAH GORDON DRAKE ARCHIT | 4744 | 1 | 04/04/2023 |
| COWLEY ENGINEERING | 186 | 2 | 12/14/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Protection and Mechanical Methods | Permit Issued | JRR CONTRACTING INC | 09/03/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | ANDAMIO SCAFFOLDING LLC | 08/10/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | ANDAMIO SCAFFOLDING LLC | 08/07/2026 |
| DOB NOW | General Construction | Permit Issued | TATRAS CONSTRUCTION CORP | 07/17/2026 |
| DOB NOW | Plumbing | Permit Issued | MARATHON MECHANICAL LLC | 07/16/2026 |
| DOB NOW | General Construction | Signed-off | DADDO CONSTRUCTION LLC | 04/16/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | QUALITY CONTROL MECH LLC | 03/05/2026 |
| DOB NOW | General Construction | Signed-off | DADDO CONSTRUCTION | 12/30/2025 |
| DOB NOW | General Construction | Permit Issued | ARCHWELL CONTRACTING CO | 12/16/2025 |
| DOB NOW | Plumbing | Permit Issued | NEW YORK PARK PLBG&HTG CO | 12/12/2025 |
| DOB NOW | General Construction | Signed-off | DADDO CONSTRUCTION | 10/08/2025 |
| DOB NOW | Plumbing | Signed-off | PETER MICELI PLUMBING | 09/25/2025 |
| DOB NOW | Mechanical Systems | Signed-off | DADDO CONSTRUCTION | 05/16/2025 |
| DOB NOW | General Construction | Signed-off | DADDO CONSTRUCTION | 04/07/2025 |
| DOB NOW | General Construction | Signed-off | SALVATORE PALAZZOLO | 02/19/2025 |
| DOB NOW | Plumbing | Signed-off | PETER MICELI PLUMBING | 02/14/2025 |
| DOB NOW | General Construction | Signed-off | BROSNA CONSTRUCTION CORPO | 08/20/2024 |
| DOB NOW | Plumbing | Permit Issued | PROCORE MECHANICAL CORP | 07/11/2024 |
| DOB NOW | General Construction | Signed-off | Z S NY IMPROVEMENT CORP | 07/10/2024 |
| DOB NOW | Plumbing | Signed-off | EAST COAST MECHANICAL LLC | 08/29/2023 |
| DOB NOW | Boiler Equipment | Signed-off | EAST COAST MECHANICAL LLC | 08/29/2023 |
| DOB NOW | General Construction | Signed-off | JRR CONTRACTING INC | 08/01/2023 |
| DOB NOW | Plumbing | Signed-off | EAST COAST MECHANICAL LLC | 06/22/2023 |
| DOB NOW | General Construction | Signed-off | EAST COAST PETROLEUM INC | 06/15/2023 |
| DOB NOW | Boiler Equipment | Signed-off | EAST COAST MECHANICAL LLC | 06/14/2023 |
| DOB NOW | Plumbing | Signed-off | DELTA-SIGMA MECH CORP | 06/07/2023 |
| DOB NOW | General Construction | Signed-off | LRL CONSTRUCTION INC | 05/30/2023 |
| DOB NOW | Mechanical Systems | Signed-off | PAM AIR CONDITIONING INC | 04/10/2023 |
| DOB NOW | General Construction | Signed-off | COOLMORE CONSTRUCTION COR | 02/24/2023 |
| DOB NOW | General Construction | Signed-off | JRR CONTRACTING INC | 11/16/2022 |
| DOB NOW | Plumbing | Signed-off | M C M PLBG & HTG, INC | 03/25/2022 |
| DOB NOW | General Construction | Signed-off | COOLMORE CONSTRUCTION COR | 03/23/2022 |
| DOB NOW | Mechanical Systems | Signed-off | STYLE RENOVATIONS AND DEC | 02/04/2022 |
| DOB NOW | Plumbing | Permit Issued | P.S.I. MECHANICAL | 11/22/2021 |
| DOB NOW | General Construction | Signed-off | JRR CONTRACTING INC | 11/01/2021 |
| DOB NOW | Sidewalk Shed | Signed-off | PHOENIX SUTTON STR INC | 10/29/2021 |
| DOB NOW | Supported Scaffold | Signed-off | PHOENIX SUTTON STR INC | 10/29/2021 |
| DOB NOW | Mechanical Systems | Signed-off | STYLE RENOVATIONS AND DEC | 08/18/2021 |
| DOB NOW | Plumbing | Signed-off | GALICJA PLBG AND HTG.CORP | 05/27/2021 |
| DOB NOW | General Construction | Permit Issued | MARLEX MANAGEMENT INC | 05/17/2021 |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/31/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/31/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/30/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 03/30/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/25/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/30/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/14/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/03/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/24/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/20/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 08/30/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/01/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 01/31/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/21/2023 | Pass-Final Boiler Equipment Inspection | Pass | View ↗ |
| 12/06/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/04/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/21/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 10/30/2023 | No Access-Final PL - Up to 3 Requested Floors | No Access | View ↗ |
| 09/18/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/06/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/06/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/29/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 01/30/2026 | Lighting in dwelling units | Jacquelyn Hawkins | energy_progress |
| 01/30/2026 | Fire-Resistant Penetrations and Joints | Jacquelyn Hawkins | special |
| 01/30/2026 | Final | Jacquelyn Hawkins | progress |
| 01/30/2026 | Energy Code Compliance Inspections | Jacquelyn Hawkins | progress |
| 01/30/2026 | Fire-Resistance Rated Construction | Jacquelyn Hawkins | progress |
| 11/21/2025 | Duct leakage testing, insulation and design | Matthew Bendix | energy_progress |
| 10/21/2025 | HVAC-R and service water heating system controls | Matthew Bendix | energy_progress |
| 10/21/2025 | HVAC-R and service water heating equipment | Matthew Bendix | energy_progress |
| 10/21/2025 | Maintenance information | Matthew Bendix | energy_progress |
| 10/21/2025 | HVAC-R and service water piping design and insulation | Matthew Bendix | energy_progress |
| 10/21/2025 | Ventilation and air distribution system | Matthew Bendix | energy_progress |
| 10/21/2025 | Energy Code Compliance Inspections | Matthew Bendix | progress |
| 10/13/2025 | Mechanical Systems | Matthew Bendix | special |
| 10/13/2025 | Final | Matthew Bendix | progress |
| 07/08/2025 | Fire-Resistant Penetrations and Joints | GEORGE GEBRAIL | special |
| 07/08/2025 | Interior lighting power | Anthony Farina | energy_progress |
| 07/08/2025 | Lighting in dwelling units | Anthony Farina | energy_progress |
| 07/08/2025 | Energy Code Compliance Inspections | Anthony Farina | progress |
| 07/08/2025 | Final | Anthony Farina | progress |
| 12/13/2024 | Interior lighting power | MINA HANNA | energy_progress |
| 12/13/2024 | Fenestration air leakage | MINA HANNA | energy_progress |
| 12/13/2024 | HVAC-R and service water heating system controls | Charles Michel | energy_progress |
| 12/13/2024 | HVAC-R and service water piping design and insulation | Charles Michel | energy_progress |
| 12/13/2024 | Lighting controls | MINA HANNA | energy_progress |
| 12/13/2024 | Fenestration and door U-factor and product ratings | MINA HANNA | energy_progress |