| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/25/2026 | Permit Issued | ICON INTERIORS INC | Air Conditioning Systems, Heating Systems | Cooling Mitsubishi Electric PQRY-P120TLMU-A2 120,000 BTU · Vrf Outdoor ×2 TQRYP1203AL42AN 120,000 BTU · Condensing Unit ×2 Water Furnace V3AH030 30,750 BTU · Wshp ×1 Heating Mitsubishi Electric PQRY-P120TLMU-A2 135,000 BTU · Vrf Outdoor ×2 TQRYP1203AL42AN 135,000 BTU · Condensing Unit ×2 |
| 06/25/2026 | Signed-off | JDP MECHANICAL INC | Heating and Air Conditioning Systems | Heat / Cool Climatemaster Climate master SB-120 120,600 BTU · Heat Pump Outdoor ×2 climate master SB-120 120,600 BTU · Heat Pump Outdoor ×1 |
| 02/04/2026 | Permit Issued | ALBA GROUP INC | Air Conditioning Systems | Cooling Lg ARNU96388A4 95,900 BTU · Vrf Indoor ×2 ARNU183SKS4 19,100 BTU · Vrf Indoor ×1 ARNU363M2A4 36,200 BTU · Vrf Indoor ×1 ARUM192BTE5 192,000 BTU · Vrf Outdoor ×1 ARUNO24GSS4 24,000 BTU · Vrf Outdoor ×1 ARUNO38GSS4 38,000 BTU · Vrf Outdoor ×1 |
| 10/15/2025 | Permit Issued | TRI-STAR CONSTRUCTION COR | Air Conditioning Systems | Cooling Above Air AboveAir SCW-005 18,700 BTU · Crac Unit ×1 |
| 10/15/2025 | Permit Issued | TRI-STAR CONSTRUCTION COR | Air Conditioning Systems | Cooling Above Air MCW007 31,000 BTU · Crac Unit ×1 |
| 10/07/2025 | Permit Issued | STRUCTURE TONE, LLC | Air Conditioning Systems | Cooling Water Furnace V5AH018BR0AN4DERBANN212SSS 18,000 BTU · Wshp ×3 V5AH030BR0AN4DERBANN212SSS 30,000 BTU · Wshp ×2 V5AH024BR0AN4DERBANN212SSS 24,000 BTU · Wshp ×1 V5AH042BR0AN4DERBANN212SSS 42,000 BTU · Wshp ×1 |
| 11/02/2020 | Signed-off | LEED MECHANICAL CORP | Air Conditioning Systems | Cooling Daikin RXTQ60TAVJUA 62,800 BTU · Vrf Outdoor ×2 |
| 10/08/2019 | — | — | Air Conditioning Systems, Associated Ducts and Piping, Ventilation Systems | Cooling Lg ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/14/2026 | Signed-off | PSI PARTNERS, LLC | 693 heads |
| 07/09/2026 | Signed-off | ACCURATE MECHANICAL INC | — |
| 01/12/2026 | Permit Issued | PSI PARTNERS, LLC | 356 heads |
| 10/15/2025 | Permit Issued | FULL CAPACITY FIRE CORP | — |
| 10/14/2025 | Permit Issued | FULL CAPACITY FIRE CORP | 312 heads |
| 10/14/2025 | Permit Issued | FULL CAPACITY FIRE CORP | 321 heads |
| 10/14/2025 | Permit Issued | FULL CAPACITY FIRE CORP | 287 heads |
| 10/07/2025 | Signed-off | BLUEWATER P&H, INC | 406 heads, 2 outlets |
| 04/01/2025 | Permit Issued | SHAMROCK MECHANICAL INC | — |
| 05/04/2021 | — | — | 72 heads |
| 02/17/2021 | Permit Issued | SEAN COAKLEY P & H INC | 192 heads |
| 01/19/2021 | Signed-off | SEAN COAKLEY P & H INC | — |
| 01/19/2021 | Signed-off | SEAN COAKLEY P & H INC | 114 heads |
| 11/02/2020 | Permit Issued | METRO FIRE PROTECTION INC | — |
| 10/03/2019 | Permit Issued | BIG APPLE PLBG CORP | 307 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/10/2026 | Permit Issued | M&T PLBG AND HTG CO., INC | Water/Sanitary |
| 02/04/2026 | Permit Issued | A&A PLUMBING CORP | Water/Sanitary |
| 01/12/2026 | — | — | — |
| 01/12/2026 | Permit Issued | A&A PLUMBING CORP | Water/Sanitary |
| 10/15/2025 | Permit Issued | M&T PLBG AND HTG CO., INC | Water/Sanitary |
| 10/15/2025 | — | — | — |
| 10/15/2025 | Permit Issued | M&T PLBG AND HTG CO., INC | Water/Sanitary |
| 10/15/2025 | Permit Issued | M&T PLBG AND HTG CO., INC | Water/Sanitary |
| 10/14/2025 | — | — | — |
| 10/14/2025 | — | — | — |
| 10/14/2025 | — | — | — |
| 10/07/2025 | Signed-off | BLUEWATER PLBG& HTG INC | Water/Sanitary |
| 10/07/2025 | — | — | — |
| 11/14/2024 | Signed-off | A&A PLUMBING CORP | Water/Sanitary |
| 08/22/2022 | Signed-off | STANDARD PLUMBING SVC LLC | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2026 | Permit Issued | L.E.A. ELECTRIC CORP. | General Wiring |
| 08/25/2026 | Complete | L.E.A. ELECTRIC CORP. | General Wiring |
| 06/23/2026 | Permit Issued | METROPOLIS ELECTRIC CORP | General Wiring |
| 06/23/2026 | Complete | METROPOLIS ELECTRIC CORP | General Wiring |
| 06/02/2026 | Permit Issued | A2K ELECTRIC CORP | General Wiring |
| 01/20/2026 | Permit Issued | ALLRAN ELECTRIC OF NY LLC | General Wiring |
| 12/17/2025 | Permit Issued | FIVE BOROUGH ELECTRIC INC | General Wiring |
| 12/11/2025 | Complete | ELPO ELECTRICAL CONTG INC | General Wiring |
| 10/21/2025 | Complete | ELPO ELECTRICAL CONTG INC | General Wiring |
| 05/22/2025 | Permit Issued | JAM ELECTRICAL CORP | — |
| 05/14/2025 | Complete | URBAN TECH ELECTRIC INC | — |
| 05/12/2025 | Permit Issued | RICHARD NEU | — |
| 04/16/2025 | Complete | L.E.A. ELECTRIC CORP. | General Wiring |
| 02/26/2025 | Permit Issued | ALLSTATE ELECTRIC CORP | General Wiring |
| 02/13/2025 | Permit Issued | FIVE BOROUGH ELECTRIC INC | 2 meters |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/21/2026 | Permit Issued | ALBA GROUP INC | Steel |
| 10/01/2025 | Permit Issued | TRI-STAR CONSTRUCTION COR | Steel |
| 10/01/2025 | Permit Issued | TRI-STAR CONSTRUCTION COR | Steel |
| 07/08/2025 | Permit Issued | ICON INTERIORS INC | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/10/2025 | Permit Issued | PLATINUM SERVICES NY LLC | Fence, Scaffold, Sidewalk Shed |
| 04/10/2025 | — | — | Fence |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/02/2026 | Signed-off | STRUCTUAL PRESV SYSTEM | — |
| Owner | Filings | Most Recent |
|---|---|---|
| 99 PARK AVENUE ASSOCIATES LLC | 1,546 | 09/25/2026 |
| METROPOLITAN BANK | 18 | 07/08/2026 |
| PLATINUM SERVICES NY | 27 | 07/08/2026 |
| GLOBAL HOLDINGS MGMT US | 26 | 07/08/2026 |
| TRI-STAR CONSTRUCTION COR | 2 | 03/22/2026 |
| STRUCTURAL PRESERV SYSTEM | 1 | 03/22/2026 |
| OWNER OF 99 PARK AVE | 3 | 03/22/2026 |
| EASTGATE REALTY | 3 | 03/22/2026 |
| 99 PK AV ASSOC L P | 4 | 03/22/2026 |
| IN GOOD CO PARK AVE INC | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| MG ENGINEERING D.P.C. | 15 | 08/25/2026 |
| GARO GUMUSYAN | 49 | 08/12/2026 |
| VOCON | 8 | 07/16/2026 |
| AMA CONSULTING ENGINEERS, PC | 14 | 07/10/2026 |
| PATTI & ANTHES CONSULTING ENGINEERS | 144 | 07/09/2026 |
| BACON LANE ARCHITECT, LLC | 1 | 05/04/2026 |
| GILSANZ MURRAY STEFICEK LLP | 13 | 04/21/2026 |
| THE SWITZER GROUP | 3 | 02/04/2026 |
| IMEG CONSULTING CORP. | 3 | 02/04/2026 |
| MICHAEL HAYES | 3 | 01/26/2026 |
| HOK | 1 | 10/09/2025 |
| MSM ENGINEERING SERVICES, PLLC | 3 | 09/10/2025 |
| CREATIVE STUDIO ARCHITECTS | 1 | 09/05/2025 |
| DESIMONE CONSULTING ENGINEERING | 3 | 04/24/2025 |
| ASHRAF CORP | 7 | 04/10/2025 |
| Alderson Engineering | 3 | 12/09/2024 |
| TANTILLO ARCHITECTURE LLC | 1 | 12/09/2024 |
| LILKER ASSOCIATES CONSULTING ENGINE | 9 | 11/14/2024 |
| JANKO RASIC ARCHITECTS, PLLC | 2 | 07/30/2024 |
| CANY ARCHITECTURE & ENGINEERING DPC | 2 | 09/05/2023 |
| ELLEN MARTIN ARCHITECT PC | 1 | 11/21/2022 |
| DESIMONE CONSULTING ENGINEERS | 1 | 11/15/2022 |
| M. CHETRIT CONSULTING ENGINEERS P.C | 6 | 04/07/2020 |
| Representative | Filings | Most Recent |
|---|---|---|
| GARO GUMUSYAN | 206 | 03/21/2026 |
| SARO GUMUSYAN ARCHITECTURE | 9 | 03/21/2026 |
| LMS-ACE SERVICES | 33 | 03/21/2026 |
| METROPOLIS GROUP INC | 26 | 03/21/2026 |
| PLATINUM SERVICES NY | 6 | 03/21/2026 |
| GREEN STUDIO | 2 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 8 | 03/21/2026 |
| RIGGINING CONSULTANTS | 2 | 03/21/2026 |
| METROPOLIS | 3 | 03/21/2026 |
| KD DESIGNS | 3 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| PRIME CONSTRUCTION MGMT | General Contractor | 96 | 09/25/2026 |
| TRI-STAR CONSTRUCTION CORP | General Contractor | 35 | 08/24/2026 |
| TULLA CONTRACTING CORP | General Contractor | 27 | 07/08/2026 |
| SEAN COAKLEY P & H INC | Fire Protection | 26 | 09/09/2026 |
| SEAN COAKLEY P & H INC | Plumbing | 24 | 07/08/2026 |
| ALBA GROUP INC | General Contractor | 18 | 07/08/2026 |
| PLATINUM SERVICES NY LLC | General Contractor | 13 | 07/08/2026 |
| V. CLOUD PAINTING AND CON | Electrical | 10 | 03/21/2026 |
| STRUCTURAL PRESERV SYSTEM | General Contractor | 8 | 03/21/2026 |
| GLOBAL HOLDINGS MGMT (US) | General Contractor | 8 | 07/08/2026 |
| ICON INTERIORS INC | General Contractor | 8 | 06/27/2026 |
| FULL CAPACITY FIRE CORP | Fire Protection | 6 | 07/08/2026 |
| UNIVERSAL PLUMBING INC | Plumbing | 6 | 07/08/2026 |
| PLUMBING WORKS CORP | Fire Protection | 5 | 09/13/2026 |
| STRUCTURE TONE, LLC | General Contractor | 5 | 07/08/2026 |
| A&A PLUMBING CORP | Plumbing | 5 | 07/08/2026 |
| M&T PLBG AND HTG CO., INC | Plumbing | 4 | 06/27/2026 |
| JAMES E FITZGERALD INC | General Contractor | 4 | 03/21/2026 |
| BIG APPLE PLBG CORP | Plumbing | 4 | 07/08/2026 |
| SHAMROCK MECHANICAL INC | Fire Protection | 4 | 07/08/2026 |
| PSI PARTNERS, LLC | Fire Protection | 4 | 07/08/2026 |
| CLUNE CONSTRUCTION CO LP | General Contractor | 4 | 07/08/2026 |
| JRM CONSTRUCTION MGMT LLC | General Contractor | 3 | 07/08/2026 |
| LEED MECHANICAL CORP | General Contractor | 3 | 03/21/2026 |
| FRANKIE PLBG & HTG L.L.C | Plumbing | 3 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| MILROSE CONSULTANTS LLC | 2003 | 15 | 08/25/2026 |
| SARO GUMUSYAN ARCHITECT | 6437 | 140 | 08/12/2026 |
| CONSULTING AND TESTING SE | 6152 | 69 | 07/09/2026 |
| GILSANZ MURRAY STEFICEK | 240 | 1 | 04/21/2026 |
| BROADWAY INSPECTIONS | 8735 | 4 | 02/04/2026 |
| DESIMONE CONSULTING ENGIN | 5942 | 2 | 04/24/2025 |
| LILKER ASSOCIATES CONSULT | 816 | 9 | 11/14/2024 |
| MG ENGINEERING D.P.C. | 8546 | 2 | 07/30/2024 |
| SKYLINE ENGINEERING, PLLC | 267 | 4 | 11/22/2022 |
| DELTA TESTING LABS | 687 | 19 | 05/26/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Mechanical Systems | Permit Issued | PRIME CONSTRUCTION MGMT | 09/24/2026 |
| DOB NOW | General Construction | Permit Issued | PRIME CONSTRUCTION MGMT | 09/24/2026 |
| DOB NOW | Sprinklers | Signed-off | PLUMBING WORKS CORP | 09/11/2026 |
| DOB NOW | Sprinklers | Permit Issued | SEAN COAKLEY P & H INC | 09/08/2026 |
| DOB NOW | Standpipe | Permit Issued | PLUMBING WORKS CORP | 09/08/2026 |
| DOB NOW | General Construction | Permit Issued | TRI-STAR CONSTRUCTION CORP | 07/22/2026 |
| DOB NOW | Mechanical Systems | Signed-off | JDP MECHANICAL INC | 07/17/2026 |
| DOB NOW | General Construction | Permit Issued | PRIME CONSTRUCTION MGMT | 07/16/2026 |
| DOB NOW | Sprinklers | Signed-off | ACCURATE MECHANICAL INC | 07/09/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A PLUMBING CORP | 06/17/2026 |
| DOB NOW | Sprinklers | Permit Issued | STALWART PLUMBING CORP | 06/09/2026 |
| DOB NOW | General Construction | Signed-off | GLOBAL HOLDINGS MGMT (US) | 06/09/2026 |
| DOB NOW | Sprinklers | Permit Issued | PSI PARTNERS, LLC | 05/27/2026 |
| DOB NOW | Sprinklers | Permit Issued | PSI PARTNERS, LLC | 05/26/2026 |
| DOB NOW | General Construction | Permit Issued | ICON INTERIORS INC | 05/22/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | ICON INTERIORS INC | 05/22/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A PLUMBING CORP | 05/22/2026 |
| DOB NOW | Structural | Permit Issued | ICON INTERIORS INC | 05/21/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | ICON INTERIORS INC | 05/21/2026 |
| DOB NOW | General Construction | Permit Issued | ICON INTERIORS INC | 05/21/2026 |
| DOB NOW | Structural | Permit Issued | TRI-STAR CONSTRUCTION CORP | 05/14/2026 |
| DOB NOW | General Construction | Permit Issued | ALBA GROUP INC | 05/12/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | ALBA GROUP INC | 05/12/2026 |
| DOB NOW | Structural | Permit Issued | ALBA GROUP INC | 05/12/2026 |
| DOB NOW | Construction Fence | Permit Issued | PLATINUM SERVICES NY LLC | 05/11/2026 |
| DOB NOW | General Construction | Signed-off | PHOENIX SUTTON STR INC | 05/06/2026 |
| DOB NOW | Suspended Scaffold | Signed-off | STRUCTUAL PRESV SYSTEM | 04/09/2026 |
| DOB NOW | General Construction | Signed-off | GLOBAL HOLDINGS MGMT (US) | 04/02/2026 |
| DOB NOW | Structural | Permit Issued | TRI-STAR CONSTRUCTION COR | 03/23/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | TRI-STAR CONSTRUCTION COR | 03/19/2026 |
| DOB NOW | Plumbing | Permit Issued | M&T PLBG AND HTG CO., INC | 03/19/2026 |
| DOB NOW | Sprinklers | Permit Issued | FULL CAPACITY FIRE CORP | 03/18/2026 |
| DOB NOW | General Construction | Permit Issued | TRI-STAR CONSTRUCTION COR | 03/17/2026 |
| DOB NOW | General Construction | Signed-off | TRI-STAR CONSTRUCTION COR | 03/17/2026 |
| DOB NOW | Sprinklers | Permit Issued | FULL CAPACITY FIRE CORP | 03/12/2026 |
| DOB NOW | General Construction | Permit Issued | TRI-STAR CONSTRUCTION COR | 02/27/2026 |
| DOB NOW | General Construction | Permit Issued | TRI-STAR CONSTRUCTION COR | 02/24/2026 |
| DOB NOW | Structural | Signed-off | STRUCTURE TONE, LLC | 02/20/2026 |
| DOB NOW | Sprinklers | Permit Issued | FULL CAPACITY FIRE CORP | 02/19/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | TRI-STAR CONSTRUCTION COR | 02/05/2026 |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/31/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/24/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/21/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/21/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/20/2026 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 07/20/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 07/08/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/02/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/31/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/31/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/15/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/27/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/16/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/13/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/13/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/20/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/17/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/10/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/15/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/07/2026 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 12/22/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/22/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/15/2025 | Fail-Final PL - Up to 9 Requested Floors | Fail | View ↗ |
| 12/09/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/05/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/21/2026 | Post-installed Anchors | Christopher Drutjons | special |
| 08/21/2026 | Maintenance information | Christopher Drutjons | energy_progress |
| 08/21/2026 | Lighting controls | Christopher Drutjons | energy_progress |
| 08/21/2026 | HVAC-R and service water heating equipment | Christopher Drutjons | energy_progress |
| 08/21/2026 | HVAC-R and service water piping design and insulation | Christopher Drutjons | energy_progress |
| 08/21/2026 | Mechanical Systems | Christopher Drutjons | special |
| 08/21/2026 | HVAC-R and service water heating system controls | Christopher Drutjons | energy_progress |
| 08/21/2026 | Duct leakage testing, insulation and design | Christopher Drutjons | energy_progress |
| 08/21/2026 | Energy Code Compliance Inspections | Christopher Drutjons | progress |
| 08/21/2026 | Final | Christopher Drutjons | progress |
| 08/21/2026 | Interior lighting power | Christopher Drutjons | energy_progress |
| 08/18/2026 | Post-installed Anchors | Christopher Drutjons | special |
| 08/18/2026 | Sprinkler Systems | Christopher Drutjons | special |
| 08/18/2026 | Fire-Resistant Penetrations and Joints | Christopher Drutjons | special |
| 08/12/2026 | Sprinkler Systems | Christopher Drutjons | special |
| 08/12/2026 | Post-installed Anchors | Christopher Drutjons | special |
| 08/12/2026 | Fire-Resistant Penetrations and Joints | Christopher Drutjons | special |
| 08/04/2026 | Public Assembly Emergency Lighting | Saro Gumusyan | progress |
| 07/10/2026 | Sprinkler Systems | DANIEL CREIGHTON | special |
| 07/10/2026 | Fire-Resistant Penetrations and Joints | DANIEL CREIGHTON | special |
| 07/10/2026 | Post-installed Anchors | DANIEL CREIGHTON | special |
| 07/09/2026 | Post-installed Anchors | Saro Gumusyan | special |
| 07/09/2026 | Fire-Resistant Penetrations and Joints | Saro Gumusyan | special |
| 07/02/2026 | Sprinkler Systems | DANIEL CREIGHTON | special |
| 07/02/2026 | Post-installed Anchors | DANIEL CREIGHTON | special |